17. Engagement and Training of Personnel
17.1 Site Induction Procedures
» All personnel entering the construction area will be required to complete a site induction; and
» The content of the site induction will include reference to all environmental controls outlined in this
document and relevant to persons attending the site induction.
17.2 Staff Training
» The Construction Manager will conduct site meetings as necessary with all sub-contractors and staff.
» Environmental training will be provided in accordance with provisions outlined in this document as
part of the induction process as relevant to each sub-contractor and/or employee.
» All staff present on site should also hold a Queensland Construction White Card (previously
Queensland Construction Biue Card).
» The Construction Manager and the site foreman should make sure that a designated person is
appointed to the role of First Aid Officer as necessary.
17.3 Workplace Health and Safety Site Plan
A Workplace Health and Safety Site Plan is to be prepared by the Construction Manager for the project.
Once drafted and approved by the Construction Manager, relevant sections of the Plan will be made
available to employees, sub-contractors and supervisors respectively.
41/22382/12186 Girraween Sports Precinct 36
Environmental Management Pian {Construction}
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.