Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Schedule A — Response or Change to Conditions DA Item Description No but not limited to drainage structures, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). Approval of works shalt not be granted until all As Constructed L | information has been supplied and accepted by Council. Environmental Health 44 The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dweillings and Commercial and Industrial Premises”, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. A bin wash area is required with a cold- water tap, hose and drain outlet connected to sewer. The drain outlet is to be designed to prevent storm water entry to the sewerage system and this can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m}, or alternatively the waste area can be roofed, or any other design approved by Council. Response Reference PYadtelim eh Waste storage and disposal facilities will be provided in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises. Details can be provide in the future when detailed design of the clubhouse has been completed. 45 All bin wash areas in excess of 700mm Square are to be roofed and the floor is to fall to a bucket trap with the waste pre-treated by a grease arrestor prior to discharge to the sewer. The appropriate backflow prevention devices are to be installed at the bin wash area. Bunding set above 75mm is required to exclude excessive rain-water entering these areas. Requirements will be included in detail design of clubhouse 46 A Trade Waste Application must be submitted prior to the issue of a Development Permit for Building Works. Noted 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.