Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Schedule A — Response or Change to Conditions DA item Description Te} Environmental Services Response Rtsii-e tale Action By 54 An Environmental Management Plan (EMP) shall be prepared and | EMP Provided implemented to ensure that the impact of the development, during construction and operation, on the environment is minimised and that the environmental values of the site and surrounding lands are protected and enhanced. 55 The EMP shall address the following issues in relation to construction and operational phases of the development: a. Legislative compliance; b. Vegetation protection; i. Including construction fencing delineating the development footprint shall be established and approved prior to Operational Works commencing. ii. Protection of area to the south east of the site containing populations of native plants, Macarthuria complanata, and scheduled “Rare” under the Nature Conservation Act 1992. Cc. Fauna and fauna habitat protection; i. Including that construction works do not occur during the breeding period of the Rainbow Bee-eater (Merops ornatus) and that a qualified ornithologist inspect the site prior to Operational Works commencing on the site. d. Weed & pest control; e. Soil erosion and sediment control; EMP Provided
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.