Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
LEGEND
en
ae
we
SITE FRONTAGE BUND
PRELIMINARY
NOT FOR CONSTRUCTION
Gp CLIENTS | PEOPLE | PERFORMANCE
' — Pansy:
Kawang Busanass Vilage, Bitten OLO 4575 Autre
PO Bax 1940 Buccina O10 4375
TOT 7 $413 6100 #617 5413 6199
bin tegatana com W www gh core
GHD Job No. 41-22387
‘Drawn B JOHNSON ODosigned 8 JOHNSON
etre RS en OK
Anproved gore Roe
1
PROPERTY BOUNDARY
‘SEDIMENT FENCE
STORMWATER PIT ANO PIPES
TOP OF BATTER
TOE OF BATTER
EXISTING STORMWATER LINE
EXISTING ELECTRICITY
CONSTRUCTION ACCESS SEDIMENT TRAP
CATCHPIT/FIELO INLET PROTECTION
SITE FRONTAGE BUND
EROSION & SEDIMENT CONTROL
Sedimentation Contrals shall comply with
the requirements of,
Sunshine Coast Regional Council, November
2008. Manuat for Erosion and Sediment Control,
Version 1.2
SILT AND EROSION CONTROL
1. GENERAL
1.) SEOIMENTATION CONTROLS SHALL COMPLY WITH THE REQUIREMENTS OF SUNSHINE COAST REGIONAL COUNCIL,
NOVEMBER 2008. MANUAL FOR EROSION AND SEDIMENT CONTROL, VERSION 1.2. WORKS STANDARDS REFER TO
“CONTRACT STANDARDS FOR EROSION AND SEDIMENT CONTROL ON CONSTRUCTION SITES."
1.2. TAKE ALL REASONABLE AND PRACTICAL MEASURES TO PREVENT OR REDUCE HARM TO THE ENVIRONMENT AS SET
OUT IN THE ENVIRONMENTAL PROTECTION ACT [CURRENT VERSION). THE MANAGEMENT OF EROSION OF THE SITE
AND ITS SURROUNDS AND THE TRANSPORTATION AND DEPOSITION OF SILT IS THE RESPONSIBILITY OF THE
CONSTRUCTOR AND ALL INVOLVED WITH THE PROJECT.
13 NO SITE WORKS TO COMMENCE UNTIL APPROPRIATE EROSION ANO SEDIMENT CONTROL HAS BEEN PROVIDED.
1.4 THE WORKS SHOWN ON THIS PLAN ARE FOR THE TEMPORARY CONTROL OF EROSION DURING THE CONSTRUCTION
AND ESTABLISHMENT OF ACCEPTED GRASS COVER (70%l. THE REVEGETATION AND REHABILITATION WORKS ARE
TO BE UNDERTAKEN AS SOON AS PRACTICALLY POSSIBLE.
THIS MANAGEMENT 10 BE ADDRESSED:
A} OURING CONSTRUCTION
PROVIOE AND MAINTAIN TEMPORARY CONTROLS FOR ALL ACTIVITIES WHICH POTENTIALLY COULD RESULT IN
EROSION OR SEDIMENTATION FOR RAINFALL EVENT.
B) PRIOR TO PRACTICAL COMPLETION
PROVIDE AND MAINTAIN LONGER-TERM MEASURES TO MINIMISE EROSION AND SEDIMENTATION, TO AND FROM,
THE COMPLETED WORKS. THE FINAL NATURE AND EXTENT OF THESE CONTROLS WILL BE AGREED WITH THE
SUPERINTENDENT.
C] SILT AND EROSION CONTROL DEVICES ARE TO BE REMOVED WHEN SATISFACTORY GRASS COVER {70%} HAS
BEEN ACHIEVED.
15 CLEARING OF VEGETATION TO BE KEPT TO A MINIMUM AND LIMITS OF CLEARING AND NO GO ZONES TO BE
CLEARLY MARKED.
1.6 ERECT SILT FENCES IN ACCORDANCE WITH IPWEAQ STD OWGS D-0040 AND 0-0041 TO ENSURE STORMWATER
RUNOFF FROM DISTURBED AREAS iS FILTERED PRIOR TO DISCHARGING DOWNSTREAM OF THE CONSTRUCTION SITE,
1.2 PROVIDE SILT FENCE DOWN GRADIENT OF ALL STOCK PILES, BUT NO CLOSER THAN 2m TO TOE.
1.8 CONSTRUCTION WORK TO BE STAGEO TO MINIMISE EXPOSURE OF DISTURBED AREAS.
1.9 STOCKPILE SITES TO BE LOCATED A MINIMUM OF 50m FROM WATERCOURSES,
4.10 WITHIN SOm OF WATERCOURSES, TRENCH EXCAVATION MATERIAL TO BE PLACED UP GRADIENT OF TRENCH.
4.4 WORKS ON SLOPES GREATER THAN 10% SHALL HAVE SPECIAL MEASURES TAKEN TO MINIMISE EROSION RISKS
(e.g. EROSION CONTROL BLANKETS, MULCH, TURF etc.}
112 ALL SURPLUS WASTE TO BE REMOVED FROM SITE AND DISPOSED OF ACCORDINGLY.
4.13 REGULAR MAINTENANCE OF STRUCTURES IS AN ESSENTIAL PART OF EFFECTIVE EROSION ANO SEOIMENT CONTROL.
THESE STRUCTURES SHOULD BE INSPECTED AT LEAST WEEKLY DURING ORY WEATHER AND AFTER EVERY STORM
EVENT THAT CAUSES RUNOFF.
fk LANDSCAPING TO BE IN ACCORDANCE WITH THE SUNSHINE COAST REGIONAL COUNCIL TREE PLANTING ANO
LANDSCAPE GUIDELINES.
2. DUST SUPPRESSION
2.1. THE CONSTRUCTOR IS TO ENSURE THE SUPPRESSION OF DUST AT ALL TIMES DURING CONSTRUCTION.
ACCEPTABLE METHODS OF DUST SUPPRESSION INCLUDE:
® MINIMISE AREA OF DISTURBANCE
© WATERING
© REVEGETATE DISTURBED AREA
© MULCHING
VEGETATION MANAGEMENT NOTES
1. GENERAL
1.1 NO CLEARING OF THE SITE IS TO COMMENCE UNTIL APPROVAL TO PROCEED HAS BEEN GIVEN BY THE
SUPERINTENDENT.
1.2 ALL TREES TO BE REMOVED SHALL BE TAGGEO AND INSPECTED FOR ANY SIGNS OF WILDLIFE. SHOULD ANY
WILDLIFE BE IDENTIFIED THEN SCRC SHALL ORGANISE THE SAFE REMOVAL AND RELOCATION OF SUCH SPECIES TO
AN APPROPRIATE LOCATION.
1.3 CARE IS TO BE TAKEN TO ENSURE THE OPERATION OF CONSTRUCTION EQUIPMENT DOES NOT DAMAGE TREES
BEYOND THE LIMIT OF CLEARING. IF NECESSARY, TREE GUARDS ARE TO 8E PLACED AROUND THE TREES 10
PROTECT THEM. TUNNEL UNDER TREE ROOTS WHEREVER POSSIBLE DURING TRENCHING OPERATIONS. IN THE
EVENT OF ROOT DAMAGE, MAKE A CLEAN CUT ABOVE THE SEVERED ROOT AND TREAT THE ROOT WITH A
SUITABLE FUNGICIDE.
1.4 ALL SUITABLE VEGETATION MATERIAL SHALL BE PROCESSED THROUGH A MILLING MACHINE TO PRODUCE CHIP
MULCH. UNSUITABLE MATERIAL SUCH AS ROOTS AND STUMPS SHALL BE OISPOSED GFF SITE. NO BURNING OF
CLEARED MATERIAL IS ALLOWEO. CHIP MULCH PRODUCED ON-SITE SHALL BE AGED AND LEACHED IN THE OPEN
FOR AT LEAST ONE MONTH AFTER MILLING. CHIP MULCH SHALL BE FREE FROM WEEDS, STONES, SOIL AND OTHER
CONTAMINATES. THE MAXIMUM SIZE OF CHIP SHALL FIT WITHIN A PRISM MEASURING 150mm x 100mm x 20mm.
a cael Works Standards ref oR
PSI ° 1830 45m se ° ards refer to, ALL VEGETATION IS TO BE DISPOSED OF IN A MANNER APPROVED BY THE SUPERINTENDENT.
MNo | STN99977 t ‘ “Ss —— "Contract Standards for Erosion and
(AHD)RL | RL.24,204 Scala 1-750 @At = Sediment Control on Construction Sites.” 2. REVEGETATION
SURVEYED | SCRC 2.1 REHABILITATION REQURIEO OF ALL OISTURBED AREAS, NOTE THAT AREAS OF EARTHWORKS AND TRENCHING ARE
TO BE DECOMPACTEC 10 A DEPTH OF 250mm BY SCARIFYING.
5 DRAWN TRANSPORT & ENGINEERING SERVICES EENIE CREEK RD - NOOSA HEADS| /nu%
CHECKED :
Al 5 PROJECT REVIEW DESIGN SERVICES (NORTH) Su nshi ne Coast GIRRAWEEN SPORTS PRECINCT - EARTHWORKS CONTRACT 1 2 1 06
mbour Office =
A ENG. CERTIFIC ‘Comer af Bury Stroct & Currie Steet, Nambour. ‘ . ‘1 EROSION AND SEDIMENT Drawing Shoot 'No-
NG. ATION| “Locked Bag 72, Sunshins Coast Mai Centre, Nambour, QLD 4560 Regionat Council
_ {Rv DATE | =" REVISIONS REC. BPPR. RPEQ No.} 6681 (Brian Peebles) Nambow ph(07)5475 8601 fax(07)5441 5338 CONTROL PLAN C003
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.