Skip to the record
Every meeting, every word.

Council archive · source document

06/1168 - Change a Development Approval [As Published] · 132006.1168.02

of 199

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

 

CUT TEMPORARY SWALE

TO BIORETENTION POND

a we
BOULDER WALL, REFER
BIORETENTION POND OETAIL

BIORETENTION POND

“

1iN 6 TURFEO RAMP ACCESS
TO BIORETENTION POND

wore TENTION WEIR,

REFER DETAIL

     

            

OUMPED ROCK (0200 ROCK
MIN 300mm THICK) ON
GEOTEXTHE BIDIM A29 OR

BOULDER WALL

INFILTRATION SWALE

11N 6 TURFED RAMP ACCESS
TO BIQRETENTION POND

 

 

 

 

 

 

INFILTRATION SWALE

 

BIORETENTION POND

A34 FROM OUTLET TO

       

REFER ORG NO. C010 FOR
SWALE AND POND SETOUT

BIORETENTION POND AND

 

 

 

 

 

 

 

 

 

 

 

GROUTED ROCK WEIR |

BIORETENTION WEIR PLAN
SCALE 150

INFILTRATION SWALE

  

 

 

   

 

 

 

 

 

  

 

    

   

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

BIORETENTION POND DETAIL

LEGEND
INFILTRATION SWALE PLAN GROUTEO ROCK WEIR 300mm DEEP, REFER SECTION L
PROPERTY SOUNDARY SCALE 1200
pho 2.0 ,
—sw— —@sw— — — STORMWATER LINE AND PIT «
° RL_15,350
—-_1__1____ 0p of Batter RL_15.250 4
— —— — — _TO€ oF BATTER sat B RL 15.050 GROUTED ROCK WEIR, 200mm ROCK £
v Sanaa [ox |
BIORE TENTION POND BASE
BIORETENTION WEIR
BIORETENTION WEIR
SECTION SECTION
NOT TO SCALE
NOT TO SCALE
whee
WIDTH VARIES sie
TURFEO BIORETENTION POND Plz
: 1.4 MIN 2.0 14 Mil , wlz
Ss
ois
SETOUT POINT, 3.0 TURF. le
7 REFER DRG NO. CO1D
BOULDER WALL, MIN 300mm HIGH —| tw. 0.5 05
GAIT IVF FT 7S ; BOULDER WALL, az ue
[ 0.45 MIN 300mm HIGH x “
0.6m SANDY LOAM FILTER MEDIA. = — t 10mm THICK CONCRETE wa
dOmm/KR 0.5
HYDRAULIC CONDUCTIVITY 200mm. | STRIP FOOTING SETOUT POWT
\ INFILTRATION SWALE DETAIL
GEOTEXTILE BIDIM A29 OR AI4

 

   

 

 

 

 

 

 

SECTION

  

 

&

VIN 6 TURFED RAMP ACCESS

 

TO BIORE TENTION POND
TWN 6
0 1 2 3m
be
Scale 1:50 @A1
0 4 8 12m
ene
Scale 1:200 @A1
9 0.8 1 1.5m
el
Scala 1:25 @A1
PRELIMINARY
NOT FOR CONSTRUCTION
=

a) CLIENTS ] PEOPLE | PERFORMANCE
a TONGRON Parkway

Kewana Business Village, Setinyy GLO 4S7S Ausuade
PO Oox 1540 thusaina QLD 4575

TBST S413 8100 F847 $413 A199

E DiImadond.com W www. phd.com

GHD Job No. 41-22382

 

Orawn B JOHNSON Qasignsd B JOHNSON

 

 

 

 

 

 

 

 

 

 

 

 

PSMNo | _STN99977 SECTION Bates pa AN [Be
{AHD)RL| RL.24.294 SCALE 1:25 SCALE 1: 25 nopeowad

SURVEYED | SCRC Dato At feshe . 1
E DRAWN TRANSPORT & ENGINEERING SERVICES . EENIE CREEK RD - NOOSA HEADS 3408

Al c DESIGN SERVICES (NORTH) Sunshine Coast GIRRAWEEN SPORTS PRECINCT - EARTHWORKS CONTRACT 1 2 06
B PROJECT REVIEW Nambour Office 5
8 Se seams er Oe ttc Nab Regional Council BIORETENTION POND AND Tang Soa

rt oar RERSIONE RES HP RPE No 665T Toran Pai Namnu ERU Sate eee INFILTRATION SWALE SETOUT PLAN._|COO7 __

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1168 - Change a Development Approval [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.