Bushfire Hazard Assessment & Management Plan v2 NCES REF: J000542
Lot 9 on RP225312 — 100 Cooyar Street, Noosa Heads

8 CONCLUSIONS

This Bushfire Hazard Assessment and Management Plan has been prepared to assess and
manage the degree of potential bushfire risk acting on the proposed Material Change of Use
development application for the Ozcare Aged care Facility at 100 Cooyar Street, NOOSA
HEADS.

A Local Hazard Map has been prepared for the site consistent with the State Planning Policy
— Natural Hazards, Risk and Resilience — Technical Manual — A ‘fit for Purpose’ approach in
undertaking natural hazard studies and risk assessments. The Local Hazard Map has
identified that High and Medium Potential Bushfire Intensity areas are located in the northern,
southern, and eastern extents of the assessment area which includes a 100m buffer area
about the site. Post development the new building will be situated in a Potential Impact Buffer.

of separation Proposed in conjunction with the recommendations and circumstances
mentioned within this report facilitate an acceptable-tolerable risk of radiant heat impact for
the vulnerable use.

Overall, the development proposed for the site, in combination with recommendations
referenced herein, is deemed suitable with respect to providing a reasonable level of
protection for people and property within the site.

Bushfire is an extremely serious and often unpredictable phenomenon that requires serious
preparatory planning and decision making to avoid potential damage to infrastructure and or
loss of life. All recommendations made herein have been formulated based on site conditions
at the time of writing and therefore may not be appropriate in the event site conditions change
over time.

Implementation of the bushfire mitigation measures referenced herein is not implied nor
intended to advocate that residents and/or occupants remain on the site during a bushfire

The landowners and site managers are to be responsible for ensuring the measures

prescribed herein are applied and stay up to date with site conditions and industry standards.

regular intervals (e.g., recommended at least every 5 years).
The first call in the event of a bushfire emergency should always be ‘000’.
8.1 Certification Matters

The following bushfire mitigation measures are to be certified as satisfactorily completed by
the project Bushfire Consultant prior to commencement of the Proposed/approved uses on the
site:

¢ All actionable recommendations set in Section 5 of this report have been implemented
(i.e., establishment of APZs, radiant heat barrier, landscaping etc.) where Practical at
the time of certification.

© 2023 38

 
Log in to download the original file

Approved Reference Documents - 132001.210127.3.pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.