Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

App5 - The Noosa Plan Assessmentpdf · OPW17/0024

Attached to the e-mail Operational Works Application 2 of 2 OPW17/0024.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
   on the foreshore and adjoining lands;                      and pontoons—                                      watercourse given the works are upgrades of the
   e) cluttering of watercourses is avoided;                      i) are setback a minimum of 1m from the        existing marine facility and the existing office is being
   f) excessive traffic volumes within foreshore areas            prolongation of the boundaries;                resited closer to the bank.
   and adjoining lands are avoided;                               ii) are not more than 1.2m in width; and
   g) materials blend with the natural surrounds; and             iii) have no head and are located such that
   h) they reflect the character and setting of the               when a vessel is berthed, it does not
   immediate surrounds or the locality.                           encroach over the prolongation of a boundary
                                                                  (Refer Figure 14-30);
                                                         AND
                                                         S5.3 For lots that adjoin those described in S5.2, a
                                                         jetty or pontoon is located well away from the
                                                         common boundary.
O6 Jetties and wharves are not roofed unless they        S6.1 No solution provided.                              This Outcome is referring to unenclosed roofed
are the main access to land on Noosa North Shore.                                                                structures, rather than buildings, with the Outcomes
                                                                                                                 of the Locality Code more applicable to new buildings
                                                                                                                 (see also assessment against O21 below)
                                                                                                                 The proposed works involve the relocation of the
                                                                                                                 existing office and a 5.3m x 2.3m (12m2) x 2.4m high
                                                                                                                 storage building.
                                                                                                                 The new building is of timber construction, with 15
                                                                                                                 degree pitched roof and eaves compatible with other
                                                                                                                 small boat sheds along the waterway. The building
                                                                                                                 will also be finished in sympathetic colours to the
                                                                                                                 local environment.
                                                                                                                 The proposed works improve the visual qualities of
                                                                                                                 the existing marine facility and allow for secure
                                                                                                                 lockup and storage of materials within the lease area
                                                                                                                 closer to the shore. Currently, the storage of
                                                                                                                 materials associated with the marine facility (i.e. life
                                                                                                                 jackets, empty fuel containers, rubbish bins and the
                                                                                                                 like) are located on the jetty and under small awnings
                                                                                                                 at the head of the jetty.
                                                                                                                 The proposed building is small scale and has been
                                                                                                                 designed to be sympathetic to the existing uses on
                                                                                                                 the Noosa River.
O7 Boat lifting devices (including boat storage          S7.1 No solution provided                               No boat lifting devices are proposed.
devices) are only located on Noosa North Shore.

Noosa Plan 2006                                                                                                                     Watercourses Works Code

Used in these records

About this file

File size
90 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

App5 - The Noosa Plan Assessmentpdf.pdf · 90 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.