Council archive · source document
Approved Plans for Change to Existing Approval OPW11/0116.01
Plans and drawings: the text below has words only, no drawings.
NSL [varies]
Top of bank
Geotextile underlayer
Geotextile flap
r
Backfill if required
14.0m
Backfill to RL -3m AHD [min]
Anticipated excavated profile
[may vary]
Up to RL -5.90m AHD
\
11m he Optional 1m geotextile tube with flap
[if required]
|| NOTES:
LOCALITY PLAN
NOOSA SPIT
Cea Neo)
st)
1. Crest height such that structure is level with
NSL (or as close as practicable). Will be
overtopped on high tides.
2. Extent of works to be restricted to limits
shown on drawings. Container configuration
to achieve design may vary.
3. For excavation notes, see drawing NRS-006.
4. Optional additional container may be placed
as part of initial works or placed [if required]
in response to monitoring.
5. Refer to additional drawings
Plan layout NRS-005
Notes NRS-011
VERTICAL DATUM AKO. TALOATUM NGA
REVISION REGISTER
2 163i Amended
Fee 1OAS approvat
CESCRETION BY ENG [APP
International
Coastal
Management
217, QLD, Austria
QLD, 4217, Audrata
QEFICE_ 50/6 Am, SYC Manna Main Bec
POST PO Box 306, Man Beach LPO, Man
TELEPHONE it /shetnis FAK
WEBSITE www coa:takranogenent com au
PROUECT NAME
NOOSA RIVER SPIT
WALL TYPICAL CROSS-SECTION
D REVISON
| NRS-007 B
ioRaraT RO RECKED Be FEROVED AT
piiontd
Ze AD SCALE. 1200 [DATE 01 May, 2012
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans for Change to Existing Approval OPW11/0116.01Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.