Decision Notice - DBW23 0060 [As Published] · DBW23/0060
Currency Period
2. This development approval lapses if the works have not substantially started by 25 July
2025, unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
R1 of 7 relax Site Plan, prepared by Taylor’d Distinction 22nd May 2023
R3 of 7 relax Site Overlay Plan, prepared by Taylor’d 22nd May 2023
Distinction
R4 of 7 relax Ground Floor Plan, prepared by Taylor’d 22nd May 2023
Distinction
R6 of 7 relax Elevations, prepared by Taylor’d 22nd May 2023
Distinction
Building Height
4. The maximum height of the development must not exceed 8 metres above the ground level.
including where excavation is undertaken.
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $1500 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with conditions.
Car Parking
6. A minimum of 2 covered car parking spaces must be provided on site and made available
and accessible at all times for residents.
Lighting Amenity
7. No flood lighting must be used on site. Any vertical illumination resulting from direct, reflected
or other incidental external lighting emanating from the site must not exceed 8 lux when
measured at any point 1.5 metres outside the boundary and at any level from ground level
upward.
Environment
8. Sediment or any other material including building materials or waste products must not be
deposited or released into the road reserve, stormwater drain or adjacent properties.
9. All existing trees on the site must be retained, except where required to be removed to
accommodate the approved dwelling.
10. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared
d. using low impact construction techniques around vegetation.
Page 2 of 5
Document Set ID: 22520532
Version: 3, Version Date: 27/07/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - DBW23 0060 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 161 KB (small file)
- File type
No other editions are linked here.