SUPERSEDED - Negotiated Decision Notice 132008 176 05
Stormwater Quality Management
48. A stormwater quality treatment system must be provided for the development in
accordance with the updated Stormwater Management Plan required by this permit. The
works must be undertaken in accordance with an Operational Works approval.
49. Permanent educational signage must be erected to educate the customers to the
development about the function of the stormwater management devices provided at the
development. The dimensions, standard, presentation and location of the educational
signage must be in accordance with an Operational Works approval.
50. Stormwater management devices must be maintained as follows and records of all
maintenance activities undertaken must be kept and made available to Council upon
request:
a. All vegetated stormwater quality treatment devices must be maintained in
accordance with the Water by Design (2009) Maintaining Vegetated Stormwater
Assets (Version 1). The approved Operational Works drawings for the stormwater
quality treatment system and detailed life cycle costing of the system must be
attached as an addendum to this document.
b. All primary stormwater quality treatment devices must be routinely checked,
serviced and cleaned in accordance with the manufacturer’s recommendations.
c. All other stormwater measures are to be maintained in accordance with the
Management and Maintenance Plan contained in the updated Stormwater
Management Plan required by this permit.
Services
51. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
52. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater) which certifies that the development has met the requirements of
this Decision Notice and all applicable legislation at the time of construction.
Easements
53. An easement for stormwater drainage purposes must be registered in favour of Council
against the title of the subject site. The easement must:
a. Extend through the site from the northern Serenity Close frontage to the south-
western Serenity Close frontage,
b. Be of sufficient width to fully contain the 1%AEP flows (year 2100) from the local
catchment encompassing the development,
c. Be clearly shown on any plans submitted for Operational Works approval, and
d. Be registered prior to the commencement of the use.
54. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
55. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
56. Any redundant easements must be extinguished prior to the commencement of the use.
Page 9 of 38
Document Set ID: 23613543
Version: 2, Version Date: 04/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.