Original source · versioned page text
ENDORSEMENT OF NOOSA LOCAL DISASTER MANAGEMENT PLAN 2026 · ATTACHMENT 1 - 2026 Local Disaster Management Plan
Plans and drawings: the text below has words only, no drawings.
Section 8.8 8.8 Recovery Subgroups Often a disaster will be of such a scale that all functions need to be addressed to effect recovery. To assist with managing capacity and resourcing issues and to reflect other areas of infrastructure that Noosa Council is responsible for i.e., water, wastewater, and waste, the Local Disaster Recovery Group (LDRG) will likely organise itself with four Functional Recovery Subgroups to address the five lines of recovery as follows: • Human and Social • Economic • Infrastructure • Environment; and • Waste This structure is depicted in section 2.8 of this plan. The need to establish one or all of the Subgroups is the responsibility of the LDRG and will depend wholly upon the scale of the event and the complexity of the recovery effort. Noosa Council 2025 | Local Disaster Management Plan Page 66 of 73
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.