Skip to the record
Accept no substitutions.

Original source · versioned page text

ENDORSEMENT OF NOOSA LOCAL DISASTER MANAGEMENT PLAN 2026 · ATTACHMENT 1 - 2026 Local Disaster Management Plan

of 73

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Section 8.8
8.8    Recovery Subgroups
Often a disaster will be of such a scale that all functions need to be addressed to effect recovery. To assist with
managing capacity and resourcing issues and to reflect other areas of infrastructure that Noosa Council is
responsible for i.e., water, wastewater, and waste, the Local Disaster Recovery Group (LDRG) will likely
organise itself with four Functional Recovery Subgroups to address the five lines of recovery as follows:

   •   Human and Social
   •   Economic
   •   Infrastructure
   •   Environment; and
   •   Waste
This structure is depicted in section 2.8 of this plan.
The need to establish one or all of the Subgroups is the responsibility of the LDRG and will depend wholly
upon the scale of the event and the complexity of the recovery effort.




Noosa Council 2025 | Local Disaster Management Plan                                 Page 66 of 73
Log in to download the original file

ATTACHMENT 1 - 2026 Local Disaster Management Plan.pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.