Council archive · source document
080626 FINAL Traffic Report version 2.pdf [As Published] · 132008.1128
Blue Care Property Development Unit Blue Care Sunrise Beach
Traffic Impact Assessment
Table 4.4b – Ben Lexcen Drive / Girraween Court Intersection
Analysis Results: 2019 Design Year
Peak Approach Movement Degree of Average 95th Percentile
Period Saturation (%) Delay (s) Queue (m)
Left 59 10 43
Ben Lexcen
Through 59 8 43
Drive (South)
Right 60 16 43
AM Peak Ben Lexcen Through 27 5 14
Drive (North) Right 27 12 14
Girraween Left 18 4 9
Court (West) Right 18 14 9
Left 27 9 15
Ben Lexcen
Through 27 6 15
Drive (South)
Right 27 14 15
PM Peak Ben Lexcen Through 65 5 19
Drive (North) Right 65 12 19
Girraween Left 18 7 8
Court (West) Right 18 13 8
The above results demonstrate that both intersections are predicted to operate well within
acceptable limits during the 2019 morning and evening commuter peak, with the intersection
volumes and geometries assumed.
J:\86000\86512\66\DOCUMENTS\REPORTS\REPORT Page 15 Arup
TITLE\FINAL\0002REPORT_JUNE08_V2.DOC Issue 24 June 2008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
080626 FINAL Traffic Report version 2.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.