Council archive · source document
Minor Change Existing Approval REC14/0005.05 {As Published}
21. Reticulated water must be provided to each lot in the development. This must include:
(a) Ensuring that existing internal water pipes are wholly contained within the lot they will
serve.
(b) An approved water meter for each lot in accordance with Unitywater and SEQ Standard
Drawings.
(c) Provision of a water service to service proposed all lots in accordance with Unitywater
and SEQ Standard Drawings.
(d) Provision of a pipeline conduit under Gateway Drive in accordance with Unitywater and
SEQ Standard Drawings.
(e) An approved 150mm diameter water service connection to each lot in accordance with
Unitywater requirements.
22. Water meters must be located on alternative boundaries to electrical pillars.
23. Reticulated sewerage must be provided to each lot in the development. This must include:
(a) Ensuring existing sewer house drains are wholly contained within the Lot they will
serve.
(b) Provision of sewerage infrastructure to the property boundaries of Lot 103.
24. Written approval to enter and construct must be obtained from the owners of properties
through which external sewers will traverse, and be submitted with lodgment of the
associated development application for Operational Works.
25. Easements of between 3 and 10 metres must be provided over all Unitywater sewers located
within property boundaries in accordance with the SEQ standards. Easements shall be
centred over the pipe. Easement terms shall be the most current registered dealing held by
the Department of Natural Resources & Mines and shall not be altered or amended.
26. Written approval to enter and construct must be obtained from the owners of properties
through which external watermains will traverse. This must include approval for an easement
over the mains, and be submitted with lodgment of the associated development application
for Operational Works.
27. A minimum clearance of 1.5 metres must be maintained between Unitywater sewers and
proposed building envelopes, buildings and other structures.
28. Stormwater retention systems and gross pollutant traps must maintain a minimum clearance
of 1.5 meters from Unitywater water supply and sewerage infrastructure
29. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from Unitywater
water mains and 1.5 metres from Unitywater sewerage mains. Landscaping plants within
these clearances must be low growing when mature and suitable Unitywater approved
varieties.
30. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
with repair, replacement or alteration of infrastructure must be met by the applicant.
5. REFERRAL AGENCIES
Not Applicable
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
Page 5 of 8
Document Set ID: 23331643
Version: 4, Version Date: 04/11/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval REC14/0005.05 {As Published}Related documentApplication case desk ↗
About this file
- File size
- 199 KB (small file)
- File type
No other editions are linked here.