Skip to the record
Every meeting, every word.

Council archive · source document

Minor Change Existing Approval REC14/0005.05 {As Published}

of 8

Text shows just the words. Original shows the document exactly as it was published.

               21.    Reticulated water must be provided to each lot in the development. This must include:
                      (a) Ensuring that existing internal water pipes are wholly contained within the lot they will
                            serve.
                      (b) An approved water meter for each lot in accordance with Unitywater and SEQ Standard
                            Drawings.
                      (c) Provision of a water service to service proposed all lots in accordance with Unitywater
                            and SEQ Standard Drawings.
                      (d) Provision of a pipeline conduit under Gateway Drive in accordance with Unitywater and
                            SEQ Standard Drawings.
                      (e) An approved 150mm diameter water service connection to each lot in accordance with
                            Unitywater requirements.
               22.    Water meters must be located on alternative boundaries to electrical pillars.
               23.    Reticulated sewerage must be provided to each lot in the development. This must include:
                      (a)     Ensuring existing sewer house drains are wholly contained within the Lot they will
                              serve.
                      (b)     Provision of sewerage infrastructure to the property boundaries of Lot 103.
               24.    Written approval to enter and construct must be obtained from the owners of properties
                      through which external sewers will traverse, and be submitted with lodgment of the
                      associated development application for Operational Works.
               25.    Easements of between 3 and 10 metres must be provided over all Unitywater sewers located
                      within property boundaries in accordance with the SEQ standards. Easements shall be
                      centred over the pipe. Easement terms shall be the most current registered dealing held by
                      the Department of Natural Resources & Mines and shall not be altered or amended.
               26.    Written approval to enter and construct must be obtained from the owners of properties
                      through which external watermains will traverse. This must include approval for an easement
                      over the mains, and be submitted with lodgment of the associated development application
                      for Operational Works.
               27.    A minimum clearance of 1.5 metres must be maintained between Unitywater sewers and
                      proposed building envelopes, buildings and other structures.
               28.    Stormwater retention systems and gross pollutant traps must maintain a minimum clearance
                      of 1.5 meters from Unitywater water supply and sewerage infrastructure
               29.    Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from Unitywater
                      water mains and 1.5 metres from Unitywater sewerage mains. Landscaping plants within
                      these clearances must be low growing when mature and suitable Unitywater approved
                      varieties.
               30.    Construction works undertaken in the vicinity of Unitywater water supply or sewerage
                      infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
                      with repair, replacement or alteration of infrastructure must be met by the applicant.
               5.     REFERRAL AGENCIES

               Not Applicable
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Building and Construction Industry (Portable Long Service Leave) Levy
               1.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.



                                                                                                          Page 5 of 8
Document Set ID: 23331643
Version: 4, Version Date: 04/11/2024

Used in these records

About this file

File size
199 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval REC14_0005.05 {As Published}.pdf · 199 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.