Council archive · source document
Development Application - Part 2 of 2 - Plans · OPW12/0093
Plans and drawings: the text below has words only, no drawings.
eDP STORMWATER CALCULATIONS
ROOF AlREA = 340m’
RAINFAll INTENSllY (1 IN 20 YR) -
251mm/hr.
ESTIMATED FLOW = 24 UTRES/SECOND
SW DRAINAGE THROUGH WAll TO UNDERCROFT
1
1 / EXISTING 100mm’ DOWNPIPES
L CONNECT TO NEW 15011
p~ ( STORMWATER DRAINAGE
FOR EACH DP)
(lYPlCAL
"-
1 1
"-
1
"-
’-- _ _
_1. _
___1 18
"-
1
o 0"-
SW DRAINAGE SUSPENDED BELOW
"-)’~ 1
FLOOR IN UNDERCROFT ~ 1
"- 1
"-~ SW DRAINAGE THROUGH WAll
AND DROPS ON OUTSIDE WALL
TO RUN INGROUND
l
\
600’ GRATED GULLY PIT
t:i
~
"- ~
o
z
"-
~
"-
"-
SW DRAINAGE ABOVE DOORS 600’ GRATED GULLY PIT
DROPPER TO RUN BELOW
"-~ EXCAVATE UNDER EXISTING PATH
VENTILATION GRILL
"- TO AllOW INSTAll OF 15011
STORMWATER DRAINAGE ALL-
SW DRAINAGE DROPS TO RUN "- TO SUNSHINE COAST REGIONAL
INGROUND COUNCIL APPROVAL
"-
"- ESTIMATED FLOW 24
L1TRES/SECOND
"- 15011 CONNECTS TO EXISTING
"- KERB GULLY CONNECTION TO BE
All TO SUNSHINE COAST
"- REGIONAL COUNCIL APPROVAL
A 2003/12 CUENT
ISSUE DATE REVISION STATUS
ian bradford
plumbing consultants
ptyltd
. PIF..(07)U4ISI’IS
. 11.0112654588
. P080X3M
plumbing consultants ___04573
pty Itd ..-..0-
.W.www~
BSA LICENCE NUMBER:-1121367
LICENCE CLASS:- HYDRAULIC SERVICES DESIGN
(including on site wastewater management)
PROJECT
STORMWATER DRAINAGE ALTERATIONS
TELSTRA TELEPHONE EXCHANGE
30 WYANORA STREET, NOOSA HEADS
TITlE
HYDRAULIC SERVICES
PART SITE PLAN
~~!SITE PLAN
REV
CUENT OWGNO
McTAGGART PLUMBING
12027.2 A
PTYLTD
A2 SCALE 1:100 U.N.O. SHEET2 OF 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 2 of 2 - PlansRelated documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.