Council archive · source document
07/0832 - Preliminary Building Works Assessable against the Planning Scheme - AKK Investments Pty Ltd [As Published] · 172007.832
INTEGRATED PLANNING ACT 1897
Works that take overland Row water
The relovanl wid dver dederalion wil stata
works bial take ovextand fire wate of9 ether
sell escescable or asseszable, or aru axl
(hom wild rivar requiramanis.
Is you tcked 013) your apecaiion must bs
assescod by KRW aganat tha Wad Rivers Cade
and must comply wit fhe coda.
‘1 you licked (113 i} an application is nol required
to be made however the works must comply with
the rolovent sat-esnsexablo section of he Wid
+ Rivera Code, cthanwisa the works bacoma
‘essedsable dovalopmon| for which on application
facocuired ond must be assessed by NRW
against the relovant pat of the Wid Rivers Code
and mass comply wih the cod.
W you thoied Q13 Bi) your application is not
abject wd iver requirement,
_ Applications (or davelopeent that is other that
thal stalod to be assaszabla, salf-angessable or
‘exempt wil not ba accaplad.” 3" «
12. Does the apptication
- IDAS Assessmant Checilst, Version 20, 2 Apr 2007,
involve works that take flow water in a HPA of an FMA?
LJ NO
it} exempt works
[DYES {ensure you have competed Part Ks of Form 1)
| 13. IFYES, is the application for works stated in the relevant wikd river declaration to be?
(2 ip assessable works
il) sel-assessable works
Works that interfere with overtand
flow watar.
‘The movant wi rivet dockarasion wal stata
‘works that intorioro with overtand fw water thal
axe ihr ol assossabla, asoassble or sxe
thom wid river requizomente,.:
U you itched O15 9), your application must ba -
<imsessed by NRW against tha Wid Fovers Code
‘and must comply with tha code.
lV you bickod 015%) an application io not roquinad
tobe made howaver the works must comply with
the relovantca-scacsable oacdon cf the Wid
Rivers Code, othorwisa tho warks booore:
,ssnesablo development for which an
is roquirad ond rus bo assassad by NRW:
‘gaint the robvant part ol tho Wid Rivers Code
‘and must comply with the coda,
*:Myou ficked Q15i) your appécatton is not
‘subject to wild river requirements.
for bulking or raising
bantor works n a HPA wil nat be accopted.
{Htyou answered YES to Q16, your appcation +
‘must be nssessed by DPIF again the Wik
Revers Cody and aust comply with the coda...
_|14. Does the application
Ono
involve works that interfere with overland flow water Ina FMA?
(77 YES (ensue you have completed Past Kie of Form 4)
15. IfYES, is the application for works stated in the relevant wild rivers declaration to be?
Co i assessable works
(20 seltassessable works
Dit) exempt works
Ono
[YES fensure you have compistad Part On of Form 1)
INTEGRATED. 1G ACT 1997.
Environmentally evant activities
"ost applcaions fot an ERAT a HPA wa nat
be accepted: Applications which may bo mate
aon dowaived lo UPIF, NRW or delegated
loca government (s0a EPA wabsita for more
information on devolved ERAS)
you anseacad WO fo 20 yu do nol rood
sormplaka Cs 21-24"
Ut you ereswared YES io 020 andthe
ican naPh satin
tha administering ata
puna ne Hd Ros Cand asoarey
‘ws the code, unless tho propoea is for
developrrent wire an appicaton wil nol be
secopted, cris exam! fom wid siver
requirements (c08 22}. You wil be abla to
‘detarrine if an applicaon wil aot be soceptad
tor the development by answering G21 ~Q24. =
{If you answered NO to 021, you do not need to
‘carplete 222. iI you answared YES bb Q21 you
are required to complotloQ22-
UW you answered NO to 022, the application wil
notbe aoneplad. Ifyou answorad YES to O22,
‘the application mus! be assessed by NRW
againal the Wad Rovers Code and must comply
wih he code.
{you anewored NO to 022 andthe developer
‘is proposad in the HPA tha application will nat be
actepled. li you answered YES to 023, the
‘appbeaon mutt ba asnosod by to EPA or
NRW (a3 procerbad in schedule 8A of the 'PA| .
‘agains the Wid Rivers Coda and must comply
wih the coda.
Wyou enswored YES to 024 the eppcation wil:
Exempt ERAs in a designated urban
area
lhe development is proposed in 9 desiratad »
‘urban area thore may ba no wid river
roqurumerts, Seo Section 22. ° |
Noto: Al applications that can ba acoapiod aust
bbe assessed agains! and must comply wih the
‘Wid Rivers Coda (other than exempt ERAS in &
{DAS Assessment Chacktst, Version 20, 2 Apt 2007
| 20. Does the application involve an ERA?
(TYES (ensure you have compleled Part G of Forni)
Cino
21. Is the apptication far an ERA 20 instream?
Ono Dives
. Is a quarry allocation notice held for the proposed ERA 20 instream?
[xo Oves
23, Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and és for specified works or a residential complex)
i) an ERA 19 (dredging)
ii) Low Impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)
iv) an ERA 22 (out of stream)
Ono Cves
24. Is the proposed development for ERA 20 (out of stream) and;
— inaFMA; and ‘
— not low impact and
not for a residential comptex in the area, or for specified works.
Ono Oves
t
Aquaculture (non ERA)
peas er squat in HPA wl ote
poem YES vat jor pean
must be assacsed by DPIF against the Wid
ovecs Code and must comply with the code,
:'117. Does the application
Ono
involve aquaculture in a PA?
L7YES (ensure you have completed Part O1 of Form 1}
decided whan erna}.
Documentation on 25. Has documentation been included with the application describing how the applicant proposes to
you answored WO to O25, your appicaion comply with the mandatory requirements, required outcomes, and/ or performance requirements
Heron aa te ubcaion reyes dave: as set out in the relevant part/s of the Wild Rivers Code?
Clno C1 yves
Works that interfere with water in a
watercourse
‘Nos: the davaloprnent is propased in a HPA,
<Spplicatone forall works that interforo with water
in awatercoursa (inctuding deans or wei, 2:
san cigar cream Gerson wa:
bbe soceptnd.
tn aPA oppleatons lor insti dams dd *
‘wars miay be accepted in nominated '
Myo kod bx fm O19, your apa wl
nok be aoceptedt:
den peril ork ui HPA or
necrnatd wataray ar ot eter to wd
18. Does the apptication
involve operational works that interfere with water in a watercourse thal is in
a nominated waterway in a PA?
Ono
19. IFYES,
(DYES (ensure you have completed the relevant Part K of Form 1)
oO ) The application Is for an instream dam or weir, or
LD i The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.
Page 13
7 The administering authority may be ether the EPA, or if devotved or delegated, the local govemment, DPIF or HRW.
Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0832 - Preliminary Building Works Assessable against the Planning Scheme - AKK Investments Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.