Council archive · source document
07/0832 - Preliminary Building Works Assessable against the Planning Scheme - AKK Investments Pty Ltd [As Published] · 172007.832
oa
" INTEGRATED PLANNING ACT 1997 . Part E, Version 2.0, 4 October 2004
2
Operational &/or building
assessable against a local government's plannif
* Completion ofa It questic ion on Pa : ry 4 applications involving thé asgessme :
_ engineering rplans and other plans, detailed € engineering plans ‘for ‘subdwisional works and conceptual design plans for ei 9. pre work wh ih apy
yesinent aoe
‘Nature of the application:
A development permit authorisés
development to occur, while’ a preliminary ©)! 3»; infrastructure, ete {.s.: ong!
approval i isa Step i in the approval process . ast 4.
‘and does not aiithorse development to occur. { 4
The types of work that are
a planning scheme are determined by the ‘AND / OR . . wey :
wilvay ae tbl lo J einen and “Ty Devélépment permit - pro details of the type of work eg. roadwork, stormwater, water and sewerage
woe .._. infrastructure, ete 27": ok
“To determine ‘the types of work that are ap infras re : < - —
assessable under a particular planting * L ]
“scheme, contact the relevant local .°° fs oR TK
‘govemment. 2. Ate the works subsequent toa previcus development approval?
*s oo o NO * ey &] YES - provide details of all previous approvals, (eo. file references)
[ 244/80 May 1980 |
be og 3. _ Is the subdivision for a canal estate? , °
a . &No : CO Yes
“Portable Long Svea Leave tay (f |4. *Is payment of a Portable Long Service Leave (PLSL).levy spleableo ‘0 the ropes?
applicable)
Prior to issuing a development permit for the ms g YES - complete 05 *.
works, the assessment manager Is required : & NO-05, 68 7 do not apply
by law to ‘sight’ an approved form, issued by]. — .
Qleave, which signifies that the PLSL levy - |5.~". Has the PLSL levy beeh paid?
has been paid, »-OYES- completeQ6
oO NO -the applicable levy must be paid | before a development pei can be given 1 for the works
‘ - a 6. | How much was paid?“
Y mo, v3 17.2 Whatis the receipt number of the payment? -
Sins
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY {applicable to assessment manager) -
OECEVEN, REFERENCE
_NUMBER'S : 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0832 - Preliminary Building Works Assessable against the Planning Scheme - AKK Investments Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.