Original source · versioned page text
ATTCH 7 - IR Response - Engineering (Sheehy & Partners)
Attached to the e-mail RAL17/0501 IR Response email 4 of 4.
The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
CONSULT AUSTRALIA
Member Firm
[OCR of page images]
CAD FILE->NA\8500dF\853I\ACAD\PLANNING\8531-0.409
PLOT DATE-> I3 Nov, 2017-1'58pm
EXTEND PROPOSED EASEMENT
12.50
2.20 6.85
SU TRUCK
Width
Track
Lock to Lock Time
Steering Angle
© 2.50m
: 250m
+ 6.0s
: 36.6m
PROPOSED 3 PARKING BAYS
seace 5” 25 tan
scale Lo
1:125 (A1)
PRELIMINARY
‘SURVEYOR: CLIENT: PROJECT: SCALES) AS SHO DRAWING NUMBER:
Oe coca aa SHEEHY & PLANNING
eee” 2 DAVID LOW WAY, crEHED. PH | conguLr AUSTRALIA SAG 8531-0
Cor ce KENLYNN PTY LTD oman 8 DRIVEWAY ACCESS TRUCK SWEPT PULL sie at
tren Penn oF SHY CASTAWAYS BEACH ona _$2 i CONSULTING ENGINEERS PATH eo
BRRCnN oF rv 1 [SWEPT PATH REVISED PER COUNCIL COMMENTS | NOV‘17| RT * Firm ‘PH(O7) 3638 3644 FAN(O7]SEI9 3655
"AMENDMENTS. DATE _|INITIALS f DATE: JUNE ‘17 A.C.N.009 899 905 No, OF DRAWINGS:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.