APPROVED Plans - OPW13/0463

of 1

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
SUNSHINE COAST REGIONAL COUNCIL

        APPROVED
 OPW       13/0463   4 Sep 2013


[OCR of page images]
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

  
   

 

 

 

 

 

  

 

      
  

  

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

      
  

         
     
   
        
   
   
   
  
  

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
 
    
   

 

 

 

   

 

 

   

 

 

  
 
  

    

 

  

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

on ™™————" °
\y i, MX DTD LEGEND
. EXTERNAL CATCHMENT 0.3 Ha NOTE —
\ / _. on eae 7. REFER TO STRUCTURAL DRAWINGS FOR DETAILED PROPOSED SOAKAGE PIT - REFER TO
: grsiu o—— sso — INTERACTION OF DRAINAGE PIT AND STRUCTURAL ELEMENTS ESSSSER SRE ESES]« STRUCTURAL AND HYDRAULIC DRAWINGS FOR
ese —_ SUNSHINE COAST REGIONAL COUNCIL 2. | CONTRACTOR SHALL UNDERTAKE ALL WORKS IN PROXIMITY TO DETAILED INTERACTION OF DRAINAGE PIT
_ _ EXISTING SERVICES AND INFRASTRUCTURE IN ACCORDANCE AND STRUCTURAL ELEMENTS
\ _L APPROVED WITH THE RELEVANT UTILITY/AUTHORITY POLICIES AND
Fd | opw 1310463 4 Sep 2013 PROCEDURES PROPOSED CARPARK
P| | ° - O 0 PROPOSED STRUCTURAL ELEMENTS - REFER
| Oo oa TO STRUCTURAL DRAWINGS FOR DETAILS
1 - sw——————_ PROPOSED STORMWATER PIPE
LOT BOUNDARY —
EXISTING FOOTPATH PROPOSED DETENTION AREA FOR MINOR FLOW
GIRRAWEEN COURT |
at |
| |
"1 3
| 3 R.L. 32.5 |
| |
| H A |
, 4
| | ~ |
| | [| EXISTING SURFACE |
3 || HII zo. |
i | DATUM RL. 32.0
ae a |
Bn SECTION “A
\| | ‘ VER SCALE 1:10(A1) \ = _/
\ is gle HOR SCALE 1:100 (A1)
Hey | ‘
uss ~ Als g Be /
Sh ; : ) i MAINTAINING PERMEABILITY OF SITE SOILS OVERLAND FLOW AND STORMWATER DISCHARGE
ZA 75) |! o\\ -EAT! Bs THE CONTRACTOR MUST READ AND BE FAMILIAR WITH THE STORMWATER MANAGEMENT PLAN (BLIGH THE SITE SEEKS TO AVOID THE GENERATION OF STORMWATER RUNOFF BY AVOIDING, TO THE EXTENT
roaih | 4 I TANNER PTY LTD, SITE BASED STORMWATER MANAGEMENT PLAN, JOB NO. 2012.167.600, 8 AUGUST PRACTICABLE, ANY GROUND LEVEL IMPERVIOUS AREAS.
PT IEW |] RB 2012), WHICH CONTAINS IMPORTANT INFORMATION ON THE PURPOSE AND INTENT OF THE 2. THE OCCURRENCES AND MAGNITUDE OF SURFACE RUNOFF EVENTS FROM THE SITE ARE REDUCED
Ilo AB STORMWATER MANAGEMENT STRATEGY FOR THE SITE. AS A RESULT OF RETENTION OF PERVIOUS SURFACES, AND THE DETENTION, INFILTRATION AND
Ay | j
I [| | 3 2. PRIOR TO WORKS COMMENCING, CONTRACTOR MUST UNDERTAKE INFILTRATION RATE TESTING IN REUSE OF RUNOFF.
hay ACCORDANCE WITH AS1547-200, APPENDIX 4.1F. AT 8 LOCATIONS ACROSS THE WORKS SITE, AT 3. PREDEVELOPMENT SURFACE RUNOFF |S ESTIMATED AT 1.8 ML/YR, REDUCING TO 1.3 MLIYR POST
I |
, TH \ LOCATIONS OUTSIDE THE BUILDING ENVELOPES AND NOT WITHIN THE VEGETATION PROTECTION DEVELOPMENT. PEAK DISCHARGE IS EXPECTED TO REDUCE FROM 270 L/S TO 220 LIS.
/|' {|| | : Lc SF ZONES. POST-CONSTRUCTION INFILTRATION RATE TESTS ARE TO BE UNDERTAKEN AT THOSE 4. THESE ESTIMATES ARE CONSERVATIVE AS THEY DO NOT ACCOUNT FOR THE LANDSCAPE
| J) NS Gl LOCATIONS, AND RESULTS ARE TO BE WITHIN 25% OF EXISTING RATES. RESULTS ARE TO BE DEPRESSION AT THE FRONT OF THE SITE.
VU fig : SUBMITTED TO THE SUPERINTENDENT. 5. SHEET FLOW ACROSS THE FOOTPATH IN THE LOT FRONTAGE IS EXPECTED TO BE RARE AND OF
\ | Ish | av ao © 3. THE NATURAL INFILTRATION RATE OF THE SITE IS TO BE MAINTAINED IN ALL LOCATIONS. THIS IS SHORT DURATION, AS THE SITE SOILS HAVE AN INFILTRATION RATE OF 170 MM/HR WHICH IS GREATER
re /, IMPORTANT TO SUPPORT THE STORMWATER MANAGEMENT STRATEGY FOR THE SITE. THE ONLY THAN THE 100YR ARI 26 MIN RAINFALL INTENSITY OF 163 MM/HR. FOR A FLOW OF 220 L/S, THE FLOW
| | | | | 6 SUPPORT EXCEPTIONS TO THIS ARE: DEPTH SHOULD TO NOT EXCEED A DEPTH OF 0.05 M, VELOCITY OF 0.3 M/S OR VELOCITY DEPTH
a i \ . ne . ok a. BUILDING FOOTINGS PRODUCT OF 0.01 M/S. BASED ON QUDM2013, THE LIKELIHOOD OF THIS IS CONSIDERED ‘POSSIBLE’
| [hy | | L ; @ mi b. BUILDINGS WHICH ARE SLAB-ON GROUND CONSTRUCTION. AND THE CONSEQUENCE |S CONSIDERED ‘VERY MINOR’, LEADING TO A LOW RISK RATING. THE RISK
i \ \ mF Reps oF c. THE CONCRETE CROSSOVER AND THE DISABLED CAPRPARKING BAY AND ITS CONCRETE WILL BE LOWER THAN EXISTING CONDITIONS.
| | | \ bag a ett PERSO RR mo SURROUND WHICH WILL HAVE IMPERMEABLE SURFACES. 6. THE REQUIREMENT FOR A LAWFUL POINT OF DISCHARGE IS MET BY AVOIDING ANY INCREASE IN
i. | COVERED PERMEABLE ae 4, THE CONTRACTOR IS TO SUBMIT DETAILED WORK METHOD STATEMENTS TO THE SUPERINTENDENT STORMWATER DISCHARGE, AND ALLOWING ANY OVERLAND FLOWS TO PASS ACROSS THE
i I WALKWAY CARPARK =O FOR APPROVAL THAT CLEARLY DOCUMENT HOW THE INFILTRATION RATE OF SITE SOILS WILL BE ALLOTMENT FRONTAGE AS SHEET FLOW INTO THE ROAD RESERVE AS IT DOES IN ITS CURRENT,
\| t 4 ih PNK ANKE 22 PRESERVED. THIS WILL INCLUDE DETAILS ABOUT: UNDEVELOPED STATE. NO FORMAL CONNECTION TO THE PIPED DRAINAGE SYSTEM, NOR KERB AND
! | | . eooceertatonet Oe a. HOW THE SITE WILL BE ACCESSED AND HOW POTENTIAL COMPACTION FROM VEHICLE AND CHANNEL DRAINAGE SYSTEM, IS NECESSARY.
=< PLANT MOVEMENT WILL BE MANAGED
| | || || a) b. HOW THE INFILTRATION SYSTEMS BENEATH BUILDINGS WILL BE CONSTRUCTED, AND
| : QS PROTECTED FROM CONSTRUCTION DEBRIS
EXISTING vote ON 4 ez c. HOW LIQUID, SLURRY AND FINE PARTICULAR MATERIALS WILL BE HANDLED
> 8 56 d. RECTIFICATION MEASURES TO RESTORE PRE-DEVELOPMENT INFILTRATION RATES WHERE
TO BE MAINTAINED 6 Q
eh a =v NECESSARY.
1 At | °S
re UL
900x900 FIELD INLET PIT (REFER TO a
D-0050 TYPE 1) ON SITE BOUNDARY - 2
S.L. TO BE CONFIRMED ON SITE TO — RereR TO STRUCTURAL DRAWINGS.
ENSURE CAPTURE OF ANY FLOWS THAT FOR DETAILS
MAY EXIT SITE. APPROX $.L32.403 __|
wor oh
EXISTING SERVICES TO BE LOCATED 1IN2 SOAKAGE PIT AREA'S
PRIOR TO WORKS COMMENCING AND __ a ls | sare MAX S -
DESIGN LEVELS AND ALIGNMENT OF __—>~ ’ - & - PROPOSED ROOF MIN REQUIRED SOAKAGE
STORMWATER PIPE TO BE CONFIRMED a coil S BUILDING NAME AREA\(m?) AREA\(m?) (MIN 10%)
WITH SUPERINTENDENT __ SS oe Bsr DeLeoe 9
0005 ROP ss? ~ ; IS Be | RETREAT 271 27 NOTE
5 RCP CLASS 2 —— . 4. THIS DRAWING TO BE READ IN CONJUNCTION
U.S.LL 31.558 — ——— Ss AMENITIES 69 6.9 WITH STANDARD NOTES ON C001
DS.LL 31.360 e . | EXISTING FOOTPATH TO — KNOWLEDGE 209 222 2. THIS DRAWING TO BE READ IN CONJUNCTION
ees ee oo BE REINSTATED TO SCRC WITH ALL OTHER CONSULTANTS DRAWINGS
| STANDARDS, ONCE SOUND 9% 96
32.78 /| STORMWATER PIPE L ae c _ EAT 100 10 SCALE110 0 O01 02 03 04m
re / NO FILTER CLOTH TO L_ GRAVEL DRAINAGE - TO BE 2.5mm SUPPORT 221 22.1
_ ~ GIRRAWEEN COURT RT L | BE USED TO BASE OR CLEAN, WASHED NO FINES GRAVEL COVERED WALKWAY +60 69 SCALE125 oe mm
© 4 wee — a i SIDES OF TRENCH SCALE1100 0 4 202~«3 dm
p 7’ a FIFA ALT!!! CREATE 351 35.1 ee
TYPICAL DRAINAGE TRENCH SECTION cai pop
SCALE 1:25 L115
REV DATE DESCRIPTION DESIGN DRAWN CHECKED APPROVED RPEQ PROJECT DRAWING TITLE SCALES
0 09-10-2013 CONSTRUCTION ISSUE PS PS CR CR NOOSA FLC STORMWATER LAYOUT PLAN 1:250 @ At
CONSULTING ENGINEERS
La LOCATION 2 GIRRAWEEN COURT, SUNSHINE BEACH, QLD | 48CHTECT vo8 NO
FULTON TROTTER 2012.164.200
LEVEL 9, 269 WICKHAM STREET, PO BOX 612
FORTITUDE VALLEY QLD 4006 AUSTRALIA CLIENT ASSOCIATE CONSULTANT DRAWING NO REVISION
T 07 32518555 FF 07 3251 8599 FULTON TROTTER C400 0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ALL RIGHTS RESERVED. THIS WORK IS COPYRIGHT AND CANNOT BE REPRODUCED IN ANY FORM OR BY ANY MEANS (GRAPHIC, ELECTRICAL OR MECHANICAL, INCLUDING PHOTOCOPYING) WITHOUT THE WRITTEN PERMISSION OF BLIGH TANNER. ANY LICENCE, EXPRESS OR IMPLIED, TO USE THIS DOCUMENT FOR ANY PURPOSE WHATSOEVER IS RESTRICTED TO THE TERMS OF AGREEMENT OR IMPLIED AGREEMENT BETWEEN BLIGH TANNER AND THE INSTRUCTING PARTY

Used in these records

About this file

File size
4.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

APPROVED Plans - OPW13_0463.pdf · 4.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.