2015-08-18 Infrastructure and Services Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
AGENDA
Infrastructure & Services
Committee Meeting
Tuesday, 18 August 2015
commencing at 9.00am
Committee Room, 9 Pelican Street, Tewantin
Committee: Crs Sandy Bolton (Chair), Bob Abbot, Frank Pardon, Noel Playford
“Engagement with our community to protect and enhance our lifestyle”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 21 sections
Section 2
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
TABLE OF CONTENTS
ITEM PAGE
ATTENDANCE & APOLOGIES -
PRESENTATIONS -
PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS 3
Infrastructure Planning & Design 3
1 CAPITAL PROGRAM DELIVERY - REVIEW 2014/15 3
2 WHOLE OF SHIRE FORWARD PLANNING & DESIGN PROGRAM 9
3 DR PAGES RD - KINMOND CREEK RD CONSTRUCTION UPDATE 12
COMMUNITY SERVICES DEPARTMENT REPORTS 19
Community Development & Sport & Recreation 19
4 FESTIVE SEASON GRANT RECOMMENDATIONS - 2015 -2016 19
CLOSED SESSION -
Page 2 of 22
Section 3
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS
(Infrastructure Services only)
Infrastructure Planning & Design
1 CAPITAL PROGRAM DELIVERY - REVIEW 2014/15
DOCUMENT INFORM AT ION
Author Asset Planning Coordinator, Bryan O’Connor
Planning & Infrastructure Department
Index ECM/Subject/2014-2015 Annual Capital Works Programme
Attachments Nil.
EXECUTIVE SUMMARY
The 2014/15 capital program delivery review highlights the key achievements and issues that
occurred throughout the delivery of the 2014/2015 capital projects. The report provides an
overview of some recently completed projects as well as identifying projects that were not
completed within the designated timeframe.
The report also provides some “lessons learnt” and how staff will take those lessons to improve
on the activities associated with the delivery of projects into future years.
RECOMMENDATION
That Council note the report by the Asset Planning Coordinator to the Infrastructure and Services
Committee meeting dated 18 August 2015 providing a review of the project delivery activities for
the 2014/2015 Capital Works Program.
REPORT
The purpose of this report is to provide an overview of the delivery of the 2014/2015 Capital
Works Program. The report provides an opportunity to highlight and discuss projects that were
delivered within the program and also confirm the completion of projects that were delivered
throughout the 2014/2015 financial year.
1. Challenges
There were some significant challenges throughout the delivery of the 2014/15 capital program
resulting in a slower than expected start to commencing project delivery, mainly due to the need
to appoint key positions in the design and delivery teams. The 2014/15 capital program was the
first full year program for Noosa Council and whilst the intent was to complete the program as
close to 100% as possible, there were some fundamental constraints surrounding the key
elements of project delivery of resourcing, timing and funding that staff had to carefully manage.
The new staff members also needed to be brought up to speed with Council systems and
processes before they could begin delivering projects.
The program had a number of new and amended projects being delivered that needed to be
carefully planned before design and construction activities commenced. The planning phase for a
number of these projects was far greater than expected which caused delays in commencing the
design and delivery stages of projects.
Page 3 of 22
Section 4
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
Federal and State grant funding opportunities throughout the 2014/15 program were limited so
wherever possible grant applications were aligned to projects to maximise external funding
opportunities. However, as a result of this, delays in the announcements of grant outcomes
caused further delays in commencing projects, an example of this being Munna Point Bridge
rehabilitation which could not commence any activities until the announcement of the grants was
made.
2. Lessons Learnt
From the challenges imposed on the project delivery team in the first full financial year of Noosa
Council there were a number of lessons learnt. These lessons have now been implemented into
the delivery framework for the 2015/16 capital program and include:
Creation of a Forward design program for “shovel ready” projects;
A reduction in the volume of design and construct projects in a single year;
Improved planning processes for projects;
Detailed resourcing and scheduling of all projects;
Improved reporting capabilities;
Project working groups;
Ensuring that key project delivery staff positions are not vacant;
Regular project reviews; and
Improving the overall project management discipline across the organisation.
As a result of the implementation of the above, the 2015/16 has already been completely
scheduled and resources allocated across the entire capital program.
3. Projects
A number of projects were delivered throughout the year and some of these include:
Multiple – Bus Stop Shelter Upgrades
Noosaville – Wallace Park Pathways
Noosaville – Gibson Road – Road Safety improvements
Tewantin – Cooroy Noosa Road Stage 1
Tewantin – Primary School safety improvements
Noosaville – Primary School safety improvements
Tewantin – River Walk Pathway & Lighting Upgrade
Sunshine Beach – Ben Lexcen Drive safety Improvement – Design
Noosaville – Noosa Waters Scour protection Stage 2
Whole of Shire BBQ renewals
Whole of Shire Park Shelter renewals
Noosaville – Gympie Terrace, Lions Park, Pirate Playground
Page 4 of 22
Section 5
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
Tewantin - River Walk Pathway & Lighting Upgrade
Noosaville - Wallace Park Pathway Improvements.
Page 5 of 22
Section 6
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
Noosaville - Lions Park - Pirate Playground
Whole of Shire - Bus Shelter Upgrades
Page 6 of 22
Section 7
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
As previously reported, throughout 2014/15, there are some major projects that will continue on
into the 2015/16 capital program. These projects have significant budget amounts totalling $3.8m
and impact on the overall project delivery and completion results. These projects include:
Noosaville Munna Point Bridge Stage 2 $1.4m
Pomona Rifle Street Flood Mitigation $1.4m
Whole of Shire Pavement reseal and rehab $1.0m
Planning and design works continue with these projects and they are proposed to be completed
within the 2016/16 financial year. The pavement reseal and rehabilitation project was primarily
delayed due to further condition data and pavement design requirements before works could
commence.
4. Summary
The delivery and completion of projects for the capital program increased rapidly throughout the
last 5 months of the financial year. A total of 46 projects were completed prior to the end of the
financial year. Against a total budget of $24.4m there was a spend of $14.8m in actuals plus
$1.8m commitments (these include unpaid invoices and works in progress) to reach a 68%
spend against the budget.
However, if the Munna Point Bridge - $1.4m, Pavement Reseal and rehabilitation program -
$1m, Rifle Street flood mitigation - $1.4m and the Emergent Works Allocation of $700k are taken
into account, this reduces the final budget allocation by $4.5m to $19.9m. This adjustment
indicates that a true reflection of what was delivered against the program was 83% including
actuals and commitments.
The continual improvement of capital delivery activities for the 2015/16 program will see great
improvement in the forecasting of projects to achieve the deliverables of the capital program.
Previous Council Consideration
The capital works program has previously been distributed to Councillors (document titled
“Capital Works Programme 2014/2015”).
Finance & Risk
Nil
Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
Project delivery staff within the Planning and Infrastructure Department were consulted in the
preparation of this report.
Page 7 of 22
Section 8
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
Departments/Sections Consulted:
Community Services x Planning & Infrastructure
Disaster Management & Public Order Building & Plumbing Services
Waste & Environmental Health DA Planning
Community Facilities Strategic Land Use Planning
Cultural Facilities X Asset Design & Investigations
X Asset Planning
Civil Operations
Environment
Executive Office x Corporate Services
Community Engagement x Finance
Customer Service ICT
Executive Support Procurement & Fleet
Governance Property & Facilities
Human Resources Revenue Services
Page 8 of 22
Section 9
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
2 WHOLE OF SHIRE FORWARD PLANNING & DESIGN PROGRAM
DOCUMENT INFORM AT ION
Author Acting Design Services Team Leader, Craig Eldridge
Planning & Infrastructure Department
Index ECM/ Subject /45.15 Traffic & Transport
ECM/ Subject /45.12 Roads
ECM/ Subject /59.04 - Commercial Bus Routes / Bus Stops / Bus Shelters
Attachments Nil
EXECUTIVE SUMMARY
In order to deliver an effective and efficient capital program, it is important to have “shovel ready”
designs prepared prior to works commencing on the ground. The benefit of this principle is that it
will result in projects not having to be planned, surveyed, designed and delivered in one financial
year. Planning, surveying and designing projects ahead of time will allow for better on-time
delivery in the following financial years, reducing overall risks to Council.
RECOMMENDATION
That Council note the report by the Acting Design Services Team Leader to the Infrastructure &
Services Committee Meeting dated 18 August 2015 and approve the proposed forward planning
project allocations for the 2015/2016 Whole of Shire Forward Planning & Design Program.
REPORT
The purpose of this report is to provide information to Council of the proposed projects to be
funded from the 2015/2016 Whole of Shire Forward Planning & Design Program to enable
“shovel ready” designs to be completed ahead of time for future capital works.
A total allocation of $300,000 has been provided in the Whole of Shire Forward Planning &
Design Program.
It is proposed that this funding be allocated on the following basis:
Coastal Bus Shelter Design, $10,000
Revision of existing design to look at ways of reducing the overall base cost.
Rural Bus Shelter Design, $10,000
Delivery of rural prototype including manufacturing.
2016/2017 PTAIP Bus Stop Disability Upgrade program, $20,000
Scoping for 2016/2017 programme grant application.
Ernest St, Goodchap St and Hilton Tce, Noosaville intersection (Traffic Study - Priority 1),
$50,000
Planning, survey and design for intersection upgrade.
Poinciana Ave and Moorindil St, Tewantin intersection (Traffic Study - Priority 2), $50,000
Planning, survey and design for intersection upgrade
Page 9 of 22
Section 10
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
Main Beach Boardwalk, Noosa Heads, $40,000
Revision of existing documentation, design and cost estimate for remaining pathway
linkage in front of Netyana Resort.
Lake Weyba Dr, Noosaville, $20,000
Planning and preliminary design for bus turnaround facilities.
Pomona Precinct, Pedestrian linkages, $20,000
Planning.
Cooroy Town Centre, Pedestrian linkages, $10,000
Planning.
Tewantin Bypass - Beckmans Rd, Noosaville, $10,000
Assisting DTMR planning for duplication and intersection upgrade.
Myall St and Elm St, Cooroy intersection, $10,000
Assisting DTMR planning for intersection upgrade.
David Low Way, Castaways Beach car park, $20,000
Planning, survey and preliminary design for car parking, pedestrian and bus stop safety
improvements.
Station Rd, Pomona School, $20,000
Planning, survey and preliminary design for car parking, pedestrian and bus turnaround
safety improvements.
James St, Cooran School, $10,000
Planning for Cooran School pathways upgrade.
Ongoing progress monitoring will be provided for these renewal and upgrade design projects
through the Capital Delivery Program quarterly reporting.
Previous Council Consideration
Capital Works Program 2015/16 adopted at Council’s Special Meeting on Monday, 29 June
2015.
Finance & Risk
Creation of financial efficiencies by reducing lead times
Reduce delivery risks by designing projects ahead of delivery program.
Consultation
External Consultation - Community & Stakeholder
Nil
Page 10 of 22
Section 11
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
Internal Consultation
Departments/Sections Consulted:
Community Services X Planning & Infrastructure
Disaster Management & Public Order Building & Plumbing Services
Waste & Environmental Health DA Planning
Community Facilities Strategic Land Use Planning
Cultural Facilities X Asset Design & Investigations
X Asset Planning
Civil Operations
Environment
Executive Office X Corporate Services
Community Engagement X Finance
Customer Service ICT
Executive Support Procurement & Fleet
Governance Property & Facilities
Human Resources Revenue Services
Page 11 of 22
Section 12
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
3 DR PAGES RD - KINMOND CREEK RD CONSTRUCTION UPDATE
DOCUMENT INFORM AT ION
Author Acting Design Services Team Leader, Craig Eldridge
Planning & Infrastructure Department
Index ECM/ Dr Pages Rd & Kinmond Ck Rd Construction - CAP.WORK – 500544
45.12 Roads
Attachments 1. Flood Modelling Map & Sections
2. Road Cross Section
EXECUTIVE SUMMARY
This report provides an update on the planning, design and preparation work to support the
invitation of tenders for the construction of Dr Pages Road. It also provides Council with
information regarding an identified problem of artificially elevated flood levels apparently caused
by unapproved earthwork embankments constructed along Kin Kin Creek in private property.
RECOMMENDATION
That Council note the report by the Acting Design Services Team Leader to the Infrastructure &
Services Committee Meeting dated 18 August 2015 providing an update on the progress of the
planning and design for the upgrade of the unsealed section of Dr Pages Road and Kinmond
Creek Road.
REPORT
The purpose of this report is to provide an update on the progress of planning and design for the
upgrade of the unsealed section of Dr Pages Road and Kinmond Creek Road.
1. Background
Council has allocated $4,700,000 for construction and design checking in its 2015/16 budget for
this project.
The detailed design is being prepared in-house with assistance from specialist consultants where
required.
2. Standard and Objectives of Design
The draft design is being prepared to achieve the following:
Upgrade the "missing link" on Dr Pages Road and Kinmond Creek Road to 8.5m wide two
lane sealed standard, with a local rural collector road feel
Upgrade road levels and drainage facilities to meet a 5 or 10 year ARI recurrence interval
(hydraulic modelling is underway)
Achieve a design speed environment of 60-80 kph. The posted speed limit will be 80 kph
and curves will have consistent advisory signs of 60 kph to suit the geometry achievable
within the existing road reserve
Provide for 8.5m total roadway width which includes shoulder allowances for cyclists
Ensure that flood water flows surcharging over the road are managed to meet relevant
safety standards and to ensure appropriate erosion protection is provided for the road
Page 12 of 22
Section 13
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
Retain vegetation outside of the road footprint where safe and also endeavour to retain
significant trees where possible
Ensure afflux (raised flood levels upstream of the new road and culverts) is within
reasonable limits for the properties affected
3. Investigations in Progress
The following investigations are being carried out concurrently as part of the planning and design
process:
Flood modelling and hydraulic design of culverts
Geotechnical testing
Flora and Fauna assessment
Tree assessment
Cultural Heritage assessment
Erosion and sediment control management
Traffic forecasting
Service location and potholing
Sourcing of pavement and embankment materials
4. Issues
4.1. Optic Fibre Telstra Cable
A commercial optic fibre Telstra cable is located on the western side of Dr Pages Road, in
some locations it is within the proposed road footprint and will dictate the new road alignment
being located towards the eastern side of the road reserve to prevent major cable relocation
costs.
4.2. Sourcing of Road Pavement and Embankment Fill Materials
In order to minimise material and haulage costs and impacts of haulage trucks, arrangements are
being made to source sub-base crushed rock from Council's Ringtail Quarry as well as bulk fill
for embankment earthworks.
Options for supply of base-course crushed rock from Ringtail Quarry are also being investigated.
Top-course crushed rock will need to be sourced by the construction contractor from other
sources.
4.3. Artificially Elevated Flood Levels Due to an Existing unapproved Embankment in
Private Property
A major problem has been found concerning flood levels predicted by modelling towards
the north western end of Dr Pages Road, as highlighted on attachment 1. It has been identified
that the levels are conflicting by about 1.8m with observed flood level markings and observations
of local property owners.
After considerable investigation, a possible cause has been traced to sections of earthwork
embankments resembling a levee constructed along the edge of Kin Kin Creek in Yalanga
Station.
The sections of embankment could have caused artificially elevated flood levels in other
private properties and Dr Pages Road for some time, resulting in disruption to the public using Dr
Pages Road due to prolonged and extended flooding, and extra maintenance costs to Council.
Page 13 of 22
Section 14
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
This finding has required extra flood modelling to be carried out, with slight delays in the design
process.
Staff are investigating the history of this embankment and will be meeting with the property
owners to see if the problem can be resolved co-operatively.
Attachment 2 shows the typical road formation required to comply with the artificially elevated
flood levels, compared with the current draft design formation. If the road formation is designed to
comply with the artificially elevated flood levels, it is estimated that this will add around $100,000
to the cost of the construction.
5. Program and Next Steps
Design review and preparation of documentation for an invitation to tender is programmed to be
completed by the end of August 2015. Resolution of issues set out in Section 4 of this report will
also be completed to allow for public tender in September 2015 with construction programmed to
commence in October 2015.
Previous Council Consideration
Nil.
Finance & Risk
The budget allocation for this project is $4,700,000.
From the design and estimating carried out to date it appears that the project is on budget,
subject to resolution of flood levels.
This also will depend greatly on tender prices received when the project is put to open tender.
Tender conditions appear to be favourable at this time.
Consultation
External Consultation - Community & Stakeholder
Adjoining property owners.
Internal Consultation
Planning: Embankment issues, Cultural Heritage, Regulatory issues.
Departments/Sections Consulted:
Community Services x Planning & Infrastructure
Disaster Management & Public Order Building & Plumbing Services
Waste & Environmental Health x DA Planning
Community Facilities Strategic Land Use Planning
Cultural Facilities x Asset Design & Investigations
Asset Planning
Civil Operations
Environment
Executive Office x Corporate Services
Community Engagement x Finance
Customer Service ICT
Executive Support Procurement & Fleet
Governance Property & Facilities
Human Resources Revenue Services
Page 14 of 22
Section 15
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
Page 15 of 22
ATTACHMENT 1
[01 |
ee 02 |
p 03 | 104 |
i
4
ym
. ) 05 |
; Ma »\:
i 3 \
. a x 1 06 | ‘
. 2 . > »
i ,i
Let
Page 15 of 22Section 16
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
Page 16 of 22
Section G1
Profile Graph Tithe
ns
2
ms ’
4
ms
2
195
9
165
18
ws
i?
165
16
0 » 100 1) 20 = = = aa ot) 500 550 eo 60 roo
Prentice Gragple Sweetie
Section G2
Profile Graph Title
z ]
2s ;
22 |
nS I
at i
ms }
20 }
m5 |
15 J
15 j
18 }
ws |
" |
165 i
16 j
15.5 }
15 j
0 50 100 150 200 250 300 350 400 #50 500 550 00
Frofile Graph Sabie
Section 03
Profile Graph Title
a
13.5
1%
18.5
16
75 |
17 |
16,5
16
15.5
18
145
14
0 2D 100 be 0 ye moO = 450) so 50 600 so 700) bet
Frofive Grape Sabtitie
Page 16 of 22Section 17
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
Page 17 of 22
Section of
Profile Graph Title
a2
a
w
293
8
2
26
2s
a
a
22
zt
* “
19
16
17
16
18
14
13
5 5 2 46 mM 6 Mw UU OlUlClUlUlUllCUlCUClUlUlmUCCUCUUCUCUCEUlCUO OCD
Profile Gramh Suibttie
Section OF
Profile Graph Title
16 +
165
15 |
45 . |
14 |
135
13
125 |
12 |
"m5
ii |
105 |
8 rs) a & & 10 i 1 165 1 a0 2 po) Oo 2b RD 335 346
Profile Graph Sucote
Section 0&
Profile Graph Title
14
135 '
13 i
125
12 }
15
"a |
193
10 i
a5 i
6 2% & & a 100 1 io 1 16 ® 260 O38 wo 6 we 0 340 8]
Profle Graph Suter
Page 17 of 22Section 18
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
Page 18 of 22
O
—
rm
=
E z T
ir ce No
a . ALTERNATIVE ROAD o
ri DESIGN SURFACE 9 >
o/}m ola
ARTIFICIAL FLOOD LEVEL
1.0
0.5
aa — .
— /,
_--- TSS \ pe SN
Existing gravel road surface Existing culvert CURRENT ROAD DESIGN SURFACE
DESIGN CROSS SECTION
(CH 925)
U
2
©
@
—_,
©
°
=>
nN
nNSection 19
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
COMMUNITY SERVICES DEPARTMENT REPORTS
Community Development & Sport & Recreation
4 FESTIVE SEASON GRANT RECOMMENDATIONS - 2015 -2016
DOCUMENT INFORM AT ION
Author Community Development Coordinator, Alison Hamblin
Community Services Department
Index ECM/Subject/Community Development Grants Scheme
Attachments 1. Festive Season Grant recommendations
EXECUTIVE SUMMARY
Not applicable.
RECOMMENDATION
That Council note the report by the Community Development Coordinator to the Infrastructure
and Services Committee dated 18 August 2015 and adopt the Festive Season Grant
recommendations for the financial year 2015/16 as set out in Attachment 1 to the report.
REPORT
Purpose
The purpose of this report is for Council to consider the Festive Season Grant recommendations
for the 2015/2016 financial year as set out in Attachment 1 to this report.
Background
Following Council’s endorsement of a Festive Season Event Grants Policy in May 2015, the
2015/16 Festive Season Grants program was advertised in the local media and through
community networks with a closing date of 12 noon 31st July 2015.
Following the closure of the round applications were assessed using the following process:
Applications were first checked for eligibility against the Noosa Council Festive Season
Grants policy and guidelines
Applications were then reviewed and commented on by staff.
The applications and staff comments were then discussed and assessed by the grants
assessment panel. The grants assessment panel was made up of:
Director, Community Services
Community Development Coordinator
Financial Services Manager
Community Engagement Manager
Executive Officer to the Mayor and CEO
Page 19 of 22
Section 20
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
As per the Noosa Council Festive Season Event Grants Policy, assessment panel members
declared any actual or potential conflicts of interest and following any such declaration the panel
members were not involved in any discussions on matters relating to that application.
The assessment panel are recommending 10 applications and funding to the value of $40,000.
Implementation
Following endorsement of this report, grant applicants will be notified of the outcomes. Funding to
successful applicants will be distributed in September 2015 providing they have no outstanding
debt to Council.
Previous Council Consideration
Ordinary Meeting, 15 January 2015, Item 16, Page 19
That Council note the report by the Community Development Coordinator to the General
Committee Meeting dated 12th January 2015 and:
A. Repeal the existing Community Grants Policy and adopt the revised Community Grants
Policy (Attachment 1);
B. Repeal the existing Community Grants Framework and Criteria and adopt the revised
Community Grants Framework and Criteria (Attachment 2); and
C. Delegate to the Chief Executive Officer the development of a Festive Season Strategy.
Ordinary Meeting 7 May 2015, Item 2, Page 11
That Council note the report by the Community Engagement Manager to the Planning &
Organisation Committee Meeting dated 28 April 2015 and:
A. Repeal the Festive Season Strategy and Minor Grants Program Policy that transferred to
Noosa Council from the Sunshine Coast Regional Council under the Local Government
(De-amalgamation Implementation) Regulation 2013; and
B. Adopt the Noosa Council Festive Season Event Grants Policy (provided at Attachment 1 to
the report) with the following amendments:
Eligible Festive Season Events, page 2, dot point 3:
New Year’s Eve events open to the public.
Ineligible Expenses, page 3, dot point 4:
Fireworks other than New Year’s Eve events and Balloons.
Finance & Risk
Funding for the 2015/16 Festive Season Grants Program has been allocated as part of the
2015/16 Budget process.
Noosa Council’s Festive Season Event Grants Policy has been developed in order to comply with
the following Queensland Government Legislation:
Local Government Act 2009
Local Government Regulation 2012
Statutory Bodies Financial Arrangements Act 1982
Page 20 of 22
Section 21
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 18 AUGUST 2015
Consultation
External Consultation - Community & Stakeholder
Previous applicants of Festive Season Grants were notified of this funding opportunity.
Internal Consultation
This report has been developed in consultation with the following internal stakeholders across
various departments and branches of Noosa Council:
Executive Office
Community Services
Financial Services
Departments/Sections Consulted:
x Community Services Planning & Infrastructure
Disaster Management & Public Order Building & Plumbing Services
Waste & Environmental Health DA Planning
Community Facilities Strategic Land Use Planning
Cultural Facilities Asset Design & Investigations
Asset Planning
Civil Operations
Environment
x Executive Office x Corporate Services
Community Engagement Finance
Customer Service ICT
Executive Support Procurement & Fleet
Governance Property & Facilities
Human Resources Revenue Services
Page 21 of 22
Section 22
ATTACHMENT 1
Page 22 of 22
Recommendations- 2015-16 Festive Season Event Grant [| ATTACHMENT 1
Conditions of funding
ar Fj 7 , Assessment Panel
Organisation name Project Title Location ,
Recommendation
Noosaville Business Association Noosaville Christmas Lights Festival ee ee
Both Australia day events need to be jointly run;
both organisations are vital to the actual event.
All advertising to be done jointly. Both
Tewantin Noosa Lions Club Inc. Australia Day Event Noosaville $5,000 organisations are to meet with Noosa Council staff
to ensure the success to the event. Expenditure
items to be shared where applicable.
Both Australia day events need to be jointly run;
both organisations are vital to the actual event.
All advertising to be done jointly. Both
Rotary Club of Noosa Heads Inc. Australia Day Citizenship Ceremony Rotary Breakfast Noosaville $5,000]organisations are to meet with Noosa Council staff
to ensure the success to the event. Expenditure
items to be shared where applicable.
Cooroy/Pomona tons Clap inc Pomona Ment of Lents 500 Pe
Event to be held on a separate night to RSL Annual
Gala Christmas Carnival at Tewantin
Noosa Christian Outreach Church Noosa Carols on the River 2015 Noosaville $7,500
Event to be held on a separate night to Noosa Carols of
. . . . River (Noosa Christian Outreach Church)
Tewantin Noosa RSL Sub Branch 20th Annual Gala Christmas Carnival Tewantin $3,500
Lions Club of Peregian Christmas Carols in the Park 2015 Peregian Beach $3,500 pe
Kin Kin Community Group Inc. Kin Kin Community Christmas 2015 kinkin $500 PO
Event to be a family orientated event that is open
Quadrant Holdings Pty Ltd. T/A Noosa Marina. |Noosa Marina NYE Event Tewantin $5,000]to the public
wm eee “ wm ma BC
Lake Cootharaba Sailing Club Inc. New Years Eve@ the Lake $2,500 BS
|
Page 22 of 22