Skip to the record
For the highest quality transcripts.

Council archive · source document

Traffic Engineering Report · MCU20/0072

of 45

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (19.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                                          19915 Traffic Engineering Report
                                                                          Good Shepherd Lutheran College
                                                                                                Noosaville
                                                                                                 June 2020



2.5      Parking Demand

Parking occupancy surveys were carried out on Tuesday 3rd March 2020 to determine
the parking demand at the college. Survey areas are shown in Figure 6. Occupancy
was recorded every 10 minutes between 7:00am and 9:00am and also between
2:30am and 4:00pm with surveys between 9:00am and 2:30pm and 4:00pm and
4:30pm recorded in 15 minute intervals. The Pre‐prep provides childcare has approval
under separate conditions and has therefore been excluded from the results. A
summary of the peak demand for parking across all zones in provided in Table 4.

                        Table 4 – Car Parking Demand Survey Results
 Parking               Available             @ 8:30 AM Peak         @ 3:00 PM Peak
  Zone                  Spaces              Spaces   Utilisation   Spaces   Utilisation
  Area                                    Occupied        %      Occupied        %
    A                     15                  15       100%          14        93%
    B                     43                  31        72%          44       102%
    C                     94                  79        84%          79        84%
    D                     51                  22        43%          24        47%
    E                    153*                 49        32%          81        53%
 TOTAL                   203                 196                    242
             (excludes 2 motorcycle bays,      (Includes cars                 (Includes cars
                                                  parked in                      parked in
               drop off zone & Zone E)
                                                   Zone E)                        Zone E)
*153 spaces is based on the maximum design
# where utilization exceed 100%, cars were standing illegally or waiting in aisles

                       Figure 11 – Vehicles Parking on Lot 30 (Zone E)




A summary of parking demand on the College for all Areas (including Zone E, but
excluding Pre‐prep) is provided in Figure 12 and clearly shows the peak demand
occurring at 8:30am and 3:00pm.




                                                                                                  Page 11

Used in these records

About this file

File size
19.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Traffic Engineering Report.pdf · 19.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.