19915 Traffic Engineering Report
Good Shepherd Lutheran College
Noosaville
June 2020
5 IMPROVEMENT OPTIONS
The visual observations at the school indicated that there is adequate supply of car
parking for the College. The queue for the drop/off‐pick up zone extends to the
roundabout, however it was observed there is adequate queueing space for vehicles
to move into the right lane and access available parking to avoid excessive queueing.
It was noted that parents are waiting and queueing earlier than required and appear
to be extending their stay beyond 2 minutes.
The drop‐off/ set‐down area should comprise one (1) consolidated pick‐up/ drop‐off
zone parallel to the kerb that functions in a similar manner to a taxi rank. A covered
waiting area for students during pick‐up times, located at the lead of the queue
should be provided to encourage cars to move forward within the zone. The four (4)
spaces at the front of the pick‐up/ drop‐off zone should be marked bays with the
remainder of the zone as a yellow dashed line. Students must only enter of exit a
vehicle from the first four bays and staff should supervise the area to ensure cars are
moving up in the queue.
1. It is recommended that Queensland Transport be
contacted to implement the “Look Out!”
program to enhance the efficiency of the drop‐
off and pick‐up areas.
2. It is recommended that the existing line marking
and signage in the vicinity of the drop off and pick
up zone, be replaced and maintained to ensure
visual cues are effective for drivers. Refer to
Figure 18, 19 and 20.
3. Improved areas are required for students to
safely store bicycles. Areas should be shaded
and accessible via a well‐connected path
network. Refer to Appendix D for shaded cycle
racks.
4. Messaging for students and parents about the
safe operations of the drop off and pick up area
should be included in enrolment packages and
on the web site. Staff should supervise the area
and ensure vehicles move up in the queue and
students only enter of exit from the first 4 bays.
Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Traffic Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.