Skip to the record
The only place to find full transcripts.

Council archive · source document

Traffic Engineering Report · MCU20/0072

of 45

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (19.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                             19915 Traffic Engineering Report
                                                             Good Shepherd Lutheran College
                                                                                   Noosaville
                                                                                    June 2020



7      MASTER PLAN OPTIONS

As part of the review, investigations were carried to determine options to increase the
distance for queueing within the College from Eumundi Road, and to increase the
number of pick up/drop off bays. The existing configuration is shown in Figure 21.

                             Figure 21 – Existing Layout




                                                                           Source: Near Map


Observations indicate that the number of parking spaces proposed within the College
as part of the Master Plan exceed the current Noosa Council planning scheme
requirement and TMR recommendations, therefore any change to the set down area
will not negatively impact parking capacity.

A conceptual option for longer term improvements to the set down area has been
developed and is shown in Figure 22. The concept extends the set down area to
provide a linear and longer queue for drop off and pick up. The concept provides a
continuous entry lane into the parking areas as well as entry for the set down area and
direct entry to short term parking modules. Internal circulation has been included to
assist in the management of the set down area and move vehicles on if students are
not ready and waiting in the designated set down zone.




                                                                                     Page 22

Used in these records

About this file

File size
19.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Traffic Engineering Report.pdf · 19.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.