                           AGENDA


   Planning & Environment
     Committee Meeting


                    Tuesday, 9 May 2017


                     commencing at 9.30am
            Committee Room, 9 Pelican Street, Tewantin



Committee: Crs Joe Jurisevic (Chair), Ingrid Jackson, Brian Stockwell, Tony Wellington




                        “Noosa Shire – different by nature”
Log in to download the original file

2017-05-09 Planning & Environment Committee Agenda(PDF, 2MB).pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 28 sections

Section 2

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                9 MAY 2017


TABLE OF CONTENTS

ITEM                                                                   PAGE

ATTENDANCE & APOLOGIES                                                    -

PRESENTATIONS                                                             -

REPORTS FOR CONSIDERATION OF THE COMMITTEE                                3

1      LOCAL GOVERNMENT INFRASTRUCTURE PLAN (PUBLIC PARKS & LAND FOR
       COMMUNITY FACILITIES NETWORK - PFTI & SOW)                         3

2      OPW17/0024 - DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS -
       PRESCRIBED TIDAL WORKS - EXTENSIONS TO AN EXISTING JETTY AT 9
       CARDELL ROAD, TEWANTIN                                             9

3      OPW17/0016 - DEVELOPMENT PERMIT FOR OPERATIONAL WORKS -
       PRESCRIBED TIDAL WORKS (OYSTER REEF RESTORATION)                  23

CLOSED SESSION                                                      -




                                                               Page 2 of 29

Section 3

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                        9 MAY 2017



REPORTS FOR CONSIDERATION OF THE COMMITTEE


1                        LOCAL GOVERNMENT INFRASTRUCTURE PLAN (PUBLIC PARKS & LAND FOR
                         COMMUNITY FACILITIES NETWORK - PFTI & SOW)
DOCUMENT INFORM AT ION




Author                              Infrastructure Assessment Coordinator, Oddbjorn Ludvigsen
                                    Planning & Infrastructure Department

Index                               ECM/ Subject/ Local Government Infrastructure Plan (LGIP)

Attachments                         1. Remaining PIP Sport & Recreation Parks & Facilities SOW
                                    2. LGIP Public Parks & LCF - SOW
                                    3. LGIP Public Parks & LCF - PFTI Maps
                                    (All three attachments provided separately to this report)



EXECUTIVE SUMMARY
This report presents the staff review and proposed update of the Public Parks and Land for
Community Facilities network for the Plans for Trunk Infrastructure (PFTI) and Schedule of Works
(SOW) for updating the current PIP to a LGIP. It follows on from the report on the Desired
Standards of Service (DSS) for this network presented to Council at the Planning & Environment
Committee Meeting of 7 February 2017.

RECOMMENDATION
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 9 May 2017 regarding the review of the Public Parks and
Land for Community Facilities network required for the new Local Government Infrastructure Plan
(LGIP) under The Noosa Plan 2006 and approve:
A.                       The Plans for Trunk Infrastructure (PFTI) Maps provided in Attachment 3 to the report; and
B.                       The Schedule of Works (SOW) provided in Attachment 2 noting that the cost estimates may
                         be refined following completion of the excel SOW Model.


REPORT
This report presents the staff review and proposal for the Public Parks and Land for Community
Facilities network for the new LGIP for Council’s review and endorsement relating to:
A.                       Plans for Trunk Infrastructure (PFTI) Maps; and
B.                       Schedule of Works (SOW).
1.                       Primary Considerations of Review
The primary considerations made in undertaking the review of the Public Parks and Land for
Community Facilities network for the LGIP were discussed at the LGIP workshop held on 19
January 2017 and detailed in the report to Council on 7 February 2017 and adopted on 16 February
2017. This provided information and details regarding the following:
1.                       Planning Support Documents - the Noosa Sport and Recreation Plan 2004 and the Noosa
                         Parks Strategy 2006 supporting the current PIP were suitable to continue as supporting
                         material for the new LGIP together with other considerations below;



                                                                                                      Page 3 of 29

Section 4

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 MAY 2017


2.   Trunk Park Types - the desired higher order “trunk” type park functions would be limited to
     District and Shire-wide classifications;
3.   Desired Standards of Service (DSS) including:
         that trunk parks be limited to District and Shire-wide functions,
         the quantity of desired land provision required to satisfy the projected resident
           population at the 2031 LGIP horizon;
         other minor clarifications and planning scheme reference updates; and
4.   Existing and Future Park Land Review - provided assessment of the existing District and
     Shire-wide parks and facilities and the remaining PIP proposed future additional land for the
     LGIP and for determining the DSS for land.
The workshop and report also emphasised that this LGIP to update the current PIP under The
Noosa Plan will be temporary until the new Sport and Active Recreation Plan and new Open Space
Plan are completed to support the new planning scheme and its new LGIP. The current PIP
planning would therefore continue unless there was absolute certainty and genuine basis to
change.
The following sections provide information on the statutory guideline requirements and the
proposed Plans for Trunk Infrastructure for the existing network and the future trunk infrastructure
land and works in relation to Public Parks and Land for Community Facilities.
2.   Plans for Trunk Infrastructure (PFTI)
The Plans for Trunk Infrastructure (PFTI) must identify the trunk infrastructure that the local
government considers necessary to service at least the projected urban development inside the
Priority Infrastructure Area (PIA) at the DSS. This does not prevent planning beyond the time
horizon of the PIA and identifying trunk infrastructure outside the PIA.
The PFTI section of the LGIP comprises PFTI maps and Schedules of Works (SOW) table for each
trunk infrastructure network. It also consists of an SOW model being an excel based spreadsheet
prepared in accordance with SOW User Manual included in Appendix C of the Statutory Guideline.
i.   Plans for Trunk Infrastructure (PFTI) Maps
      These maps must separately identify the:
         existing and future trunk infrastructure network;
         future trunk infrastructure labelled with a unique map reference to cross reference to
           the schedule of works (SOW) table; and
         service catchments being the areas for which the network demand projections are
           stated in the planning assumptions reflecting the unique servicing patterns for the
           network.
     The new LGIP PFTI maps proposed for the Public Parks and Land for Community Facilities
     network for sport and recreation purposes are provided in Attachment 3. These are provided
     in the same format as the PIA maps according to the planning scheme localities (as the
     intended network service catchments) and based on trunk park types for District and Shire-
     wide classifications. These PFTI maps show the:
         existing trunk parks and land for community facilities provided for recreation and sport
           purposes; and
         proposed future “trunk” infrastructure land and works based on the Schedule of Works
           (SOW) provided in Attachment 2 and detailed further in sub-section ii below.




                                                                                      Page 4 of 29

Section 5

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       9 MAY 2017


ii.   Schedule of Works (SOW) Table
      The SOW table includes information derived from the “excel based” Schedule of Works
      Model (refer following sub-section iii) and must state the following for each item of future
      trunk infrastructure identified on the PFTI maps:
         unique map reference to cross reference the item shown on the PFTI maps;
         brief description of the item;
         estimated timing expressed in terms of specific years or time periods (e.g. 2016–2021);
           and
         establishment cost for land or works stated in current cost terms and be consistent with
           the SPA definition of ‘establishment cost’.
      The methodology for determining the future trunk infrastructure items for the Public Parks
      and Land for Community Facilities network has been undertaken as follows:
      1)   Review of the current PIP was undertaken to identify the remaining uncompleted future
           projects relating to District and Shire-wide functions per the revised DSS adopted by
           Council on 16 February 2017. This review is provided in Attachment 1 where the
           remaining PIP future items for transferring to the LGIP are highlighted.
      2)   These PIP remaining future items were then summarised and reviewed individually in
           relation to their costing and proposed timing. This review is provided in Attachment 2
           which details and explains the methodology used:
               Park type and hierarchy
                 This provides the trunk items classification in accordance with the revised DSS
                 adopted.
               Current PIP 2006 base costs and timing
                 The PIP costs previously underwent the full Queensland Competition Authority
                 assessment during the original PIP review and State Government’s approval and
                 are therefore considered as remaining suitable for the LGIP costing where no
                 newer information is available.
               Proposed LGIP 2014 base costs and amended timing
                 The LGIP base cost estimates of future works items have either used:
                 o     the current PIP cost indexed from 2006 to 2014 by the ABS Road & Bridge
                       index in accordance with the guideline; or alternatively
                 o     based on newer planning documentation where available.
                 Additional information regarding costing of some specific items is provided as
                 follows:
                 o     For future land new purchase proposals, the costs have been re-estimated
                       using an average dollar rate per hectare based on current land selling data
                       obtained from the “realestate.com.au” website and indexed back to the
                       2014 base date using the ABS Consumer Price Index in accordance with
                       the guideline. This is summarised as page 3 of Attachment 2.
                 o     For the future land requirements proposed from existing Council owned
                       land, the re-estimated cost is the land valuation obtained from Council’s
                       land asset register and proportioned to the land area required.




                                                                                     Page 5 of 29

Section 6

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 MAY 2017


                  o     New projects not previously contained in the current PIP are for the new
                        hinterland playground in Cooroy, the Rufous Street development and the
                        Chaplin Park Precinct Master Plan. These have been included in the new
                        LGIP due to recent/current planning reports and Council approvals.
                  o     The Noosa Leisure Centre has been updated to include the Library and
                        Wallace Park which now relates to both Community Land and Recreation
                        Park purposes. Staff have reviewed the previous “Wallace Park Master
                        Plan Review Draft Report dated 20 February 2013” prepared under the
                        Sunshine Coast Regional Council and whilst this report was only issued as
                        a draft, staff consider elements relating to Stage 1 of the plan as being a
                        suitable basis for updating the proposed future works for the LGIP
                        summarised as page 2 of Attachment 2.
                        Stage 2 of the draft plan has not been considered appropriate for this LGIP
                        due to the high cost estimate and subject to external funding being
                        available. This will be determined by new planning that is currently
                        underway for the new planning scheme and its LGIP.
                  The estimated timing for provision of the proposed future items have been
                  reviewed with:
                  o     items already been completed as listed in the 2014-2016 time cohort;
                  o     projects allocated to the 2016-2021 time period aligned with Council’s 5
                        year Cap X program; and
                  o     the remaining future projects allocated to the later time cohorts 2021-2026
                        and 2026-2031 as considered appropriate for an acceptable budget cost
                        allocation per year. Council does not currently have a 10 year or longer
                        term Cap X program available as this is also currently being developed.
                Staff review comments
                  This advises the particular method basis used to determine the LGIP base cost
                  estimates. Items not based on indexed PIP costs have also been highlighted in
                  red font for ease of identification.
                Contingency
                  The LGIP base cost estimates have been adjusted to include the contingency
                  allowable under the guideline according to the project’s estimated timing.
                Resulting items for SOW table (columns 1 to 4)
                  This provides the basis for formalising the SOW Table required for the LGIP
                  however may be further refined following completion of the excel SOW model as
                  briefly explained in section iii below. The final draft LGIP will be provided for
                  Council’s review and approval prior to proceeding to the State review.
iii.   Schedule of Works (SOW) Model
       The SOW model is an excel based spreadsheet model that must be prepared in accordance
       with the SOW User Manual included in Appendix C of the Statutory Guideline. The State
       Department of Infrastructure, Local Government and Planning has provided the model for
       local government use in the preparation of the LGIP.
       Full details and requirements of the model was previously detailed to Council in the Planning
       & Environment Committee Meeting Report of 12 July 2016.




                                                                                      Page 6 of 29

Section 7

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 MAY 2017


     In relation to the SOW table, the model requires general financial information and generic
     inputs (such as discount, escalation, site condition multiplier, contingency etc) along with the
     base costing of the infrastructure for each service catchment. The model then calculates the
     infrastructure items as a Refined Asset Value at the Present Day Value which is then placed
     into the PFTI-SOW table of the LGIP.
     The excel SOW model can only be finalised following Council’s preliminary endorsement of
     the PFTI Maps and SOW future items proposed in Attachments 2 and 3.


Previous Council Consideration
Ordinary Meeting Minutes, 28 August 2014, Item 5, Page 9
That Council note the report by the Infrastructure Assessment Officer to the Planning &
Organisation Committee Meeting dated 19 August 2014 and:
A.   Resolve to undertake an amendment to the Priority Infrastructure Plan in accordance with
     the recent amendments to the Sustainable Planning Act 2009 and corresponding new
     Statutory Guideline 03/14;


Ordinary Meeting Minutes, 21 July 2016, Item 9, Page 8
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 12 July 2016 and approve the Priority Infrastructure Area
(PIA) Maps provided at Attachment 1 for the proposed Local Government Infrastructure Plan
(LGIP) to replace the current Priority Infrastructure Plan (PIP) of the current Noosa Plan planning
scheme.


Ordinary Meeting Minutes, 15 December 2016, Item 5, Page 4
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 6 December 2016 and;
A.   Approve the Planning Assumptions contained in the report and provided in Attachments 1, 2
     and 3 for proceeding with the new Local Government Infrastructure Plan (LGIP) of the current
     Noosa Plan planning scheme;
B.   Note a future report to Council may be presented to adjust population and development
     projections in Attachment 3 if any major discrepancies are discovered following completion
     of the staff final review of the supporting DMaTT GIS output data; and
C.   Request the CEO to write to Unitywater thanking their staff in providing the DMaTT
     population and development data for use in Council’s LGIP and to commit Council’s
     ongoing support and assistance in future DMaTT updates.


Ordinary Meeting Minutes, 16 February 2017, Item 5, Page 4
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 7 February 2017 and approve the Desired Standards of
Service (DSS) for the Public Parks and Land for Community Facilities network provided in
Attachment 2 for proceeding with the new Local Government Infrastructure Plan (LGIP) under The
Noosa Plan 2006.




                                                                                       Page 7 of 29

Section 8

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                      9 MAY 2017


Finance & Risk
Council needs to have amended its current Priority Infrastructure Plan (PIP) to a Local Government
Infrastructure Plan (LGIP) by 30 June 2018 in order to continue issuing infrastructure charges and
impose conditions about trunk infrastructure on development.
Since January 2014 to March 2017, $7,870,536 has been collected in infrastructure charges
equating to a current average of $201,809 per month or $2,421,703 per annum. The 2016/2017
budget has conservatively estimated the infrastructure charges revenue at $1,687,329.
A long term risk of LGIPs is the commitment ultimately made to provide future infrastructure at the
desired standards of service to meet development growth.


Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
Director, Corporate Services
Director, Community Services
Manager, Financial Services
Manager, Planning & Environment
Coordinator, Asset Planning
Community Development Officer, Community Services

Departments/Sections Consulted:

      Chief Executive Officer                x   Community Services                 x   Corporate Services
      Executive Officer to the Mayor & CEO       Community Facilities               x   Financial Services
      Executive Support                      x   Community Development                  ICT
                                                 Libraries & Galleries                  Procurement & Fleet
                                                 Local Laws                             Property & Facilities
                                                 Waste & Environmental Health           Revenue Services

      Executive Office                       x   Planning & Infrastructure
      Community Engagement                       Building & Plumbing Services
      Customer Service                           Civil Operations
      Economic Development                       Disaster Management
      Governance                             x   Infrastructure Planning & Design
      Human Resources                        x   Planning & Environment
      Sustainability                             Strategic Land Use Planning




                                                                                                    Page 8 of 29

Section 9

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                          9 MAY 2017


2                        OPW17/0024 - DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS -
                         PRESCRIBED TIDAL WORKS - EXTENSIONS TO AN EXISTING JETTY AT 9 CARDELL
                         ROAD, TEWANTIN
DOCUMENT INFORM AT ION




Author                              Planning Coordinator, Patrick Murphy
                                    Planning & Infrastructure Department

Index                               ECM/ Application/ OPW17/0024

Attachments                         1.    Site Plan


                   APPLICATION DETAILS

                   Applicant                      Osco Finance P/L ST

                   Proposal                       Development Permit for Operational Works for Prescribed Tidal
                                                  Works – Extension to an Existing Jetty

                   Properly Made Date             31 January 2017

                   Information Request Date       13 February 2017

                   Information Response Date      28 February 2017

                   Decision Due Date              29 May 2017



                   PROPERTY DETAILS

                   Property Address               9 Cardell Road, Tewantin Qld 4565

                   RP Description                 Lot 20 CP 907535

                   Land Area                      1159m²

                   Existing Use of Land           Jetty for boat hire



                   STATUTORY DETAILS

                   SEQRP Designation              N/A

                   Locality                       Tewantin and Doonan

                   Zone                           Nearest zone: Open Space Conservation

                   Overlays                       Biodiversity Overlay: Riparian Buffer Area
                                                  Natural Hazard Overlay: Flood Hazard, Acid Sulphate Soils

                   Assessment Type                Code




                                                                                                        Page 9 of 29

Section 10

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 MAY 2017


RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Environment Committee
Meeting dated 9 May 2017 regarding Application No. OPW17/0024 for a Development Permit for
Operational Works for Prescribed Tidal Works - Extension to an Existing Jetty situated at 9 Cardell
Road, Tewantin and approve the application in accordance with the following conditions:
      Approved Plans
1.    Vessels associated with the marine use of the facility must only be moored within the
      approved lease area
2.    The structure identified as “Store” must only be used for the purpose of storage associated
      with the marine facility and must not be used for commercial purposes.
3.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are listed in the following table unless
      otherwise amended by these conditions.
        Plan No.     Rev.    Plan/Document Name                                    Date
        A001         B       Site Plan large                                       17/02/2017
        A002         B       Site Plan                                             17/02/2017
        A003         B       Site Plan – Demo                                      17/02/2017
        A101         B       Set Out Plan                                          17/02/2017
        A201         B       Office Floor Plan and Elevations                      17/02/2017
        A202         B       Store Plans and Elevations                            17/02/2017
4.    All structures associated with the development must be constructed wholly within the
      approved area
5.    Structures must be designed and constructed such that they are free standing within the
      waterway and are not connected to or behind the revetment wall or rock wall. Upon
      completion of works, a certification by RPEQ must be provided to Council in this regard.
6.    All structures must have no detrimental effects on stormwater drains and/or easements.
7.    The jetty and deck areas must be constructed in a manner to render the underside area
      vermin proof
8.    There must be no electrical reticulation system carrying electricity in excess of 24 volts
      beyond the revetment wall unless all switches and power outlets are positioned above the
      1%AEP flood level.
9.    Lighting associated with the use must be designed, installed, operated, and maintained in
      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
10.   Wastewater and sullage must only be disposed of at approved pumpout facilities.
11.   The mooring facility must not be utilised for live-aboard purposes.
12.   Any construction and post construction activity is not to impact on the condition of the
      waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
      (1994) and the Environmental Protection (Water) Policy 2009.
13.   Certification by a Registered Professional Engineer of Queensland that states that the works
      have been constructed in accordance with best practice methods and are structurally sound
      must be submitted to Council. This certification must be submitted to Council within three (3)
      months of the date of this approval. A final inspection and approval of the structure by
      Council’s Inspector is also required. Please contact Council’s Planning Assessment Section
      (Development Audit & Response Officer 0428738563) to arrange the inspection.




                                                                                     Page 10 of 29

Section 11

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 MAY 2017


14.   After completion, the proposed works must be maintained in a sound state of repair in
      accordance with the approved plans
15.   All necessary State government approvals relating to this development must be obtained.



REPORT
1.    PROPOSAL
The application is for a Development Permit for Operational Works for Prescribed Tidal Works –
Extension to an Existing Jetty.
The report submitted with the application identifies the following repairs and improvements as
forming the work of this application:
    Renewing and widening the existing jetty structure from 1.165m to 1.8m metres wide to
      comply with current access standards and improve public access safety;
    Installing a security gate and jetty handrail;
    Reducing the length of the existing timber jetty and installing a new hinged aluminium
      walkway within the lease area;
    Installing 4 ‘finger’ pontoons parallel to the shore to allow access to moored boats within the
      lease area;
    Relocate the existing office and decking area currently located near the end of the existing
      jetty closer to the shore and entrance to the jetty (with no increase in the jetty/decking use
      areas);
    Construct a new 5.3m x 2.3m (12m2) x 2.4m high ‘storage’ building on the southern side of
      the new walkway;
    Removing all existing unused pilings and pontoons within the lease area; and
    Maintenance dredging works for approximately the first 15 metres from the Low Water Line
      to comply with lease conditions and safely utilise this area without regular dredging.
Attachment 1 details the proposed site pan and details areas to be removed.
The following images detail the proposed site plan and elevations of the office and store.




                                                                                     Page 11 of 29

Section 12

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA           9 MAY 2017




                             Figure 1: Site plan




                         Figure 2: Elevation of office



                                                         Page 12 of 29

Section 13

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 MAY 2017




                                      Figure 3: Elevation of Store

2.    SITE DETAILS
2.1. Background
A history of the sites lease was provided with the application:
On the 25 October 1951, the Marine Board issued approval for a ‘T’ shaped jetty extending 147
feet (45m) into the Noosa River. The associated lease area was then established extending 45m
into the Noosa River.
On the 5 November 1996, the associated lease was registered as a plan of survey for lot 20 on
CP907535. As part of the survey, the jetty structures were included and appear to show the current
site office and jetty structures.
On the 3 June 2015, the Department of Natural Resources and Mines issued a 30 year lease
renewal to the lease holder (Osco Finance Pty Ltd.) for the continued purpose as a ‘Marine Facility’.
On the 21 November 2016, a revised survey plan was submitted to the Department of Natural
Resources & Mines (DNRM) to extend the area of the existing term lease to cover a newly
constructed disabled access to the jetty facilities.
At the time of the application of the revised survey plan the applicant sought to increase the lease
area further into the waters of the Noosa River. Council was requested to provide comment to the
Department of Natural Resources. Council advised that it did not support the increase of the lease
area into the river but that it did support an increase in the width of the walkway.
On 31 January 2017 the revised survey plan was registered thereby cancelling the previous title
reference of Lot 20 onCP907535 and creating new title reference of Lot 20 on SP284459.
The site has historically been used as a marine facility for the purpose of a commercial jetty for
boat hire purposes. A review of aerial photographs has identified that the storage of boats
associated with the marine facility has not been contained within the lease area.




                                                                                      Page 13 of 29

Section 14

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA    9 MAY 2017




                 Nearmap: February 2017




                 Nearmap: May 2016




                                                  Page 14 of 29

Section 15

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA    9 MAY 2017




                 Nearmap: September 2015




                 Nearmap: April 2015




                                                  Page 15 of 29

Section 16

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA    9 MAY 2017




                 Nearmap: September 2014




                 Nearmap: June 2014



                                                  Page 16 of 29

Section 17

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     9 MAY 2017




                        Nearmap: August 2013

2.2. Site Description
The subject site is located at 9 Cardell Road, Tewantin (Lot 20 on CP907535) and includes a State
Lands Lease over a portion of the Noosa River, which is currently 1,159m2 in area adjoining the
western river bank.
The lease area is located along the RSL Memorial Park foreshore and currently contains a timber
jetty structure, reception and office building as shown in the aerial photos below.
2.3. Surrounding Land Uses
The subject site is situated adjacent to the RSL Memorial Park foreshore whilst residential
properties of Noosa North Shore are situated on the opposite side of Noosa River.
3.   ASSESSMENT
3.1. Statutory Instruments – Planning Scheme
The subject site is located in the Tewantin and Doonan Locality and takes on the zoning of the
adjoining foreshore land which is Open Space Conservation Zone.
The proposed works require a Code assessment. The applicable codes are:
   Tewantin and Doonan Locality Code
   Watercourses Works Code
   IDAS code for Prescribed Tidal Works
The application has been assessed against each of the above applicable codes. The pertinent
issues arising out of the assessment against the codes are discussed below:




                                                                                  Page 17 of 29

Section 18

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                           9 MAY 2017


Tewantin and Doonan Locality Code
Specific Outcomes:
Noosa River Outcome 21
Commercial development on and adjacent to the Noosa River is designed to
a)     provide for uses for marine facility purposes only;
b)     be compatible with the scenic values of the waterway;
c)     provide a high level of amenity, including ensuring low ambient noise levels;
d)     not increase the overall scale and intensity of commercial operations;
e)     ensure no additional commercial leases on the Noosa River;
f)     ensure no net increase in the gross floor area of buildings or structures;
g)    use materials, natural finishes and colours that blend with the surrounding natural landscape;
      and
h)    reflect the character and setting of the locality (such as timber and tin construction with a
      traditional pitched roof design).
It is considered that the proposal accords with all aspects of this objective with the exception that
there will be an increase in gross floor area attributable to the new storage building. The new
building is to allow for the storage of items associated with the marine facility that had previously
been stored outside. The new building is a minor addition as it is 12m2 in area and will be of colours
and materials that are consistent with the character of the area. Conditions may be placed on the
permit to limit the use of the building to the storage of materials associated with the marine facility.
Noosa River Outcome 22
Commercial development does not extend beyond existing commercial lease areas.
The proposal does not seek commercial development beyond the lease area. Historically boats
moored at the facility have extended beyond the lease area. The permit applicant has provided
advice that the current lessee (Luxury Afloat Houseboats) has a fleet of 4 main boats with the
following dimensions:
    2 x 13.7m long x 4.7m wide (45 foot 10 berth)
    1 x 12.2m long x 5m wide (40 foot 8 berth)
    1 x 10m long x 4.3m wide (33 foot 6 berth)
In addition to the above the current lessee also has several small tenders of various sizes.
The amended layout of the jetties improve the capacity for boats to be moored within the lease
area as there is 10.5 metres in distance between the pontoons. This space is sufficient to
accommodate the fleet of boats detailed above.




                                                                                        Page 18 of 29

Section 19

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       9 MAY 2017


The following image identifies how the large vessels can be stored within the lease area.




Further advice from the permit applicant supports that there will be no development beyond the
commercial lease area:
     …….as the lease is a private marine facility, the management of the moorings will be
     supervised by the owner/manager of the facility from the onsite office to ensure compliance
     with the State lease conditions. The State lease conditions require ‘The lessee must, take all
     reasonable action to ensure that all vessels attached to moorings within the boundaries of
     the land must be moored wholly within such boundaries and that such vessels or any part of
     thereof must not encroach beyond the boundaries of the land’
The application was also referred to the Department of Infrastructure, Local Government and
Planning whose response included general advice stating….
All vessels moored to the structure must be in accordance with the purpose, terms and conditions
of tenure over lot 20 on SP284459. In particular vessels being moored inside the lease area.
Noosa River Outcome 23
The loading and unloading of passengers is confined to the commercial lease areas of the
respective commercial operation.
The increased pontoon and jetties improve the provision of areas for the loading and unloading of
passengers.
Watercourses Works Code
The proposal demonstrates a high level of compliance with the Watercourses Works Code




                                                                                    Page 19 of 29

Section 20

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         9 MAY 2017


IDAS Code for Prescribed Tidal Works
The IDAS code sets out a number of specific outcomes and probable solutions for the works. The
following specific outcomes are of most relevance for the assessment.
Outcome 3.1
Prescribed tidal work is of a height, scale and size to ensure the work is compatible with the
character and amenity of its location, having regard to the following:
a.    The height, scale and size of the natural features of the work’s immediate surroundings and
      the locality within which the work is located,
b.    The height, scale and size of the existing buildings or other structures in the work’s immediate
      surroundings and the locality within which the work is located,
c.     If the relevant planning scheme states the desired height, scale or size of buildings or other
      structures in the work’s immediate surroundings or the locality within which the work is
      located – the stated desired height, scale or size.
The form of the development is compatible with the surrounding natural environment and the
existing built form within and outside of the lease area.
Outcome 7.2
The location of prescribed tidal work ensures vegetation is cleared or disturbed only to the extent
reasonably necessary for the work.
No vegetation removal is required for the works.
Outcome 8.1
Prescribed tidal work does not have a significant adverse effect on the availability of public access
to foreshores, including public access proposed in the relevant planning scheme.
The works are contained within the lease area and do not significantly affect public access to the
foreshore.
4.    CONSULTATION
4.1. IDAS Referral Agencies
The application was referred to the following IDAS Referral Agencies:
Concurrence
The application was referred to the Department of Infrastructure, Local Government and Planning
(SARA) as a concurrence agency. The Departments response was issued on 28 March 2017
The department’s response was an approval with conditions.
4.2. Other Referrals
The application was assessed by the following internal Council specialists:
    Development Engineer, Engineering.
Their assessment forms part of this report.
5.    CONCLUSION
The application for an Operational Works Permit to develop alterations and additions to the jetty
and pontoons at 9 Cardell Road is recommended for approval. The proposed works provide for an
upgrade of an existing marine facility and complies with State and Local Planning Codes. The
works will allow for improved access to the site to comply with current building standards and
facilitate an improved capacity to moor vessels within the lease area. The new buildings will be an
enhancement on the existing building within the lease and provide improved public safety by
locating it closer to the jetty entry.


                                                                                      Page 20 of 29

Section 21

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                   9 MAY 2017



   Chief Executive Officer                    Community Services                     Corporate Services
   Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
   Executive Support                          Community Development                  ICT
                                              Libraries & Galleries                  Procurement & Fleet
                                              Local Laws                         x   Property & Facilities
                                              Waste & Environmental Health           Revenue Services


   Executive Office                       X   Planning & Infrastructure
   Community Engagement                       Building & Plumbing Services
   Customer Service                           Civil Operations
   Economic Development                       Infrastructure Planning & Design
   Governance                             x   Planning & Environment
   Human Resources                            Strategic Land Use Planning
   Sustainability




                                                                                               Page 21 of 29

Section 22

ATTACHMENT 1




  Page 22 of 29

PX                                     ATTACHMENT 1
                                                                                    a
                  AREA                           —                                fe         i
 WALKWAY AREA      ~Sema       WALKWAY AREA     ~t8me                          f                \
 OUTSIDE STORAGE AREA ~erd     STORAGE BUILDING GFA 12m2                     7              2    \
                               mrp   rescence                            a                        \a——                  4
                                EAVES as sme cover m2 +                 x                                                %
                               >800mm FROM BUILDING onl             a7                               \                     y
                                                                  SP       cemanones                  ‘                     %,
                                                                /                                       ‘Se                   %
                                                           /                  ;                           *
             ateseesce. tiene            ——_—           iP           NEW PONTOON \             :     °       \
                                          eee... Teese OC Se=.                       SOSA\,                       *     NEW PONTOON
                                                       SaaS
                                                        SSS           saisiauiaintimiins                             \
                                                      SNe                    vee
                                                       e   Se                 .      AK
                                                          SS             ap                 \\~          )
                                                             _E_=_]]]wm   il                                              ,
                                                   _N"e             pl                                                     »
                                                         (ies.                   cs                        come     NS
             .                                Ea                                 ae                ee
                                          el                                                               rae
                        ON         GE                                7.                                 fe                          ¥
                                    EF                               ‘                                 oe                          ‘
                               0                                       ke                            “
                                  NCA                                  X       Lot 20 DP284459    a
                 .                 . .                                   \        AREA: 1159 m* ge
                Sy                  uN                                    ‘\               a
                                        a
                  44,                \                 SITEPLAN-DEMO         —\       ee
                    4?                                 SCALE: 1:200           \    a                                        .  .
                                       .                                     \Y                                       Preliminary
                                             <a                             Pane                           caer wee: Osco Finance
praningenriee                                ome                           eee]                                                  AOS
                                                                                                                               Page 22 of 29

Section 23

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                        9 MAY 2017



3                        OPW17/0016 - DEVELOPMENT PERMIT FOR OPERATIONAL WORKS - PRESCRIBED
                         TIDAL WORKS (OYSTER REEF RESTORATION)
DOCUMENT INFORM AT ION




Author                              Coordinator - Engineering, Mark Lewis
                                    Planning & Infrastructure Department

Index                               ECM/Application/OPW17/0016

Attachments                         Nil



                   APPLICATION DETAILS

                   Applicant                     Noosa Council

                   Proposal                      Development Permit for Operational Works - Prescribed Tidal Works
                                                 (Oyster Reef Restoration)

                   Properly Made Date            18 January 2017

                   Decision Due Date             24 April 2017



                   PROPERTY DETAILS

                   Property Address              Noosa Woods Park & Public Toilets, Claude Batten Drive, Noosa
                                                 Heads

                   RP Description                Lot 114 MCH 839107

                   Land Area                     313000.00 Square Metres

                   Existing Use of Land          Not applicable



                   STATUTORY DETAILS

                   SEQRP Designation             Not applicable

                   Locality                      Noosa Heads

                   Zone                          Not applicable

                   Assessment Type               Code




                                                                                                     Page 23 of 29

Section 24

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                           9 MAY 2017


RECOMMENDATION
That Council note the report by the Coordinator Engineering, Mark Lewis to the Planning &
Environment Committee Meeting dated 9 May 2017 regarding Application No. OPW17/0016 for a
Development Permit for Operational Works for Prescribed Tidal Works (Oyster Reef Restoration
Units) situated at Noosa Woods Park & Public Toilets, Claude Batten Drive, Noosa Heads and
approve the application in accordance with the following conditions:
APPROVED PLANS
1.   Development undertaken in accordance with this approval must generally comply with the
     approved plans of development. The approved plans are listed in the following table unless
     otherwise amended by these conditions.
       Plan No.         Rev.   Plan/Document Name                                  Date
       2016.0028-001    A      Site Location prepared by International Coastal     20 October 2016
                               Management
       2016.0028-002    A      Plan Layout Site 1-12 prepared by International     20 October 2016
                               Coastal Management
       2016.0028-003    A      Plan Layout Site 13-16 prepared by International    20 October 2016
                               Coastal Management
       2016.0028-004    A      Site 1 prepared      by   International   Coastal   20 October 2016
                               Management
       2016.0028-005    A      Site 2 prepared      by   International   Coastal   20 October 2016
                               Management
       2016.0028-006    A      Site 3 prepared      by   International   Coastal   20 October 2016
                               Management
       2016.0028-007    A      Site 4 prepared      by   International   Coastal   20 October 2016
                               Management
       2016.0028-008    A      Site 5 prepared      by   International   Coastal   20 October 2016
                               Management
       2016.0028-009    A      Site 6 prepared      by   International   Coastal   20 October 2016
                               Management
       2016.0028-010    A      Site 7 prepared      by   International   Coastal   20 October 2016
                               Management
       2016.0028-011    A      Site 8 prepared      by   International   Coastal   20 October 2016
                               Management
       2016.0028-012    A      Site 9 prepared      by   International   Coastal   20 October 2016
                               Management
       2016.0028-013    A      Site 10 prepared     by International     Coastal   20 October 2016
                               Management
       2016.0028-014    A      Site 11 prepared     by International     Coastal   20 October 2016
                               Management
       2016.0028-015    A      Site 12 prepared     by International     Coastal   20 October 2016
                               Management
       2016.0028-016    A      Site 13 prepared     by International     Coastal   20 October 2016
                               Management
       2016.0028-017    A      Site 14 prepared     by International     Coastal   20 October 2016
                               Management
       2016.0028-019    A      Site 16 prepared     by International     Coastal   20 October 2016
                               Management
       2016.0028-020    A      Detail prepared     by    International   Coastal   20 October 2016
                               Management



                                                                                      Page 24 of 29

Section 25

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         9 MAY 2017


2.    All equipment and structures associated with the works must be located in accordance with
      the approved plans.
3.    Safe access in the vicinity of the works must be maintained at all times.
4.    Any construction and post construction activity is not to impact on the condition of the
      waterway, and is to be conducted so as not to breach the Environmental Protection Act (EPA)
      1994 and the Environmental Protection (Water) Policy 2009.
5.    Certification by a Registered Professional Engineer of Queensland must be submitted to
      Council at the completion of the works. The certification must state that the works have been
      constructed in accordance with best practice methods, are in accordance with Coastal
      Protection and Management Act 1995.

REPORT
1.    PROPOSAL
The application seeks approval for a Development Permit for Operational Works for Prescribed
Tidal Works. Specifically, approval is sought for the installation of oyster reef restoration units at
15 sites throughout the Noosa River. The locations for the 15 sites are all within the intertidal zone
of the Noosa River and each unit is proposed to be sited marginally above the lowest astronomical
tide at each of the 15 sites. The land identified as the property (Noosa Woods Park & Public Toilets
Claude Batten Drive, Noosa Heads) is for record keeping purposes only.
Each oyster reef restoration unit will occupy 12m2 at the 15 sites which equates to a total area of
180m2. Each unit is intended to be located within a 90m2 resource area at all 15 sites equating to
a total area of 1,350m2. A locality plan is provided below in Figures 1 and 2 which depict the
approximate location of each of the sites. Figures 3 and 4 illustrate the layout of each unit and
associated resource area and buffer.




                               Figure 1 – Locality Plan of Sites 1 to 12

                                                                                      Page 25 of 29

Section 26

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               9 MAY 2017




              Figure 2 – Locality Plan of Sites 13 to 16 (Site 15 Deleted)




                   Figure 3 – Restoration Unit and Allocation Area

                                                                             Page 26 of 29

Section 27

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 MAY 2017




                                    Figure 4 – Oyster Reef Plan


2.   ASSESSMENT
The application has been assessed against the following statutory instruments where applicable,
including:
   the South East Queensland Regional Plan,
   any applicable state planning policies,
   the state planning regulatory provisions,
   any applicable temporary local planning instrument


Prescribed Tidal Works Code - Coastal Protection and Management Regulation 2003.
The proposed prescribed tidal works triggers assessment against the Prescribed Tidal Works Code
under Schedule 4A of the Coastal Protection and Management Regulation 2003. The proposed
development aligns with the Specific Outcomes listed in the code on the basis that the proposed
development is not for a permanent structure relating to a freehold lot (jetty, pontoon, boat ramp
etc.), the development does not pose a risk to public safety, does not rely on vegetation removal
in the tidal water or on land under tidal water and does not impact the amenity and character of the
locality.
The application has also been assessed against the planning scheme, including the following
applicable codes:
   Watercourse Works Code – The Noosa Plan
The application has been found to generally comply with all applicable statutory instruments. The
pertinent issues arising out of the assessment are discussed below.




                                                                                     Page 27 of 29

Section 28

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                             9 MAY 2017


Watercourse Works Code
Specific Outcome O3 of the Watercourses Works Code does not allow the undertaking of
prescribed tidal works on the southern bank of the Noosa River and tributaries between the Noosa
Heads Lions Park and Weyba Bridge. The extent of the relevant bank is depicted below in Figure
5.




Figure 5 – Southern Banks of Noosa River
Prescribed tidal works are not permitted in the nominated location for the purpose of amenity. More
specifically, the Overall Outcomes sought for the Watercourses Works Code are to ensure that
prescribed tidal work is compatible with the character and amenity of its surrounding area.
Site 11 is the only oyster reef restoration unit (out if the 15 locations) proposed to be located on
the Southern bank between Noosa River and tributaries between Noosa Heads Lions Park and
Weyba Bridge.
Although contrary to Specific Outcome O3 of the Watercourses Works Code, the proposed
prescribed tidal works for the installation of an oyster restoration unit at site 11 will actually restore
the natural amenity and environment. The proposal is to use natural recruitment processes for
restoration of oyster habitats that once naturally occurred and were anthropogenically removed
from the system.
The restoration units are not of a sizeable nature, will only be visible during low tide periods, and
are required to grow into a self-sustaining natural feature after three years, or require removal. For
these reasons they are considered inconsequential and unlikely to impact on the amenity and
character of its surroundings.
3.    CONSULTATION
IDAS Referral Agencies
The application was referred to the following IDAS Referral Agencies:
Concurrence
Department of Local Government, infrastructure and Planning.
The department is a concurrence agency for Tidal Works and Works within Fish Habitat Areas.
The department responded by letter dated 22 March 2017 approving the proposed development
subject to reasonable and relevant conditions.




                                                                                          Page 28 of 29

Section 29

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                 9 MAY 2017


3.1. Other Referrals
The application was forwarded to the following internal Council specialists:
    Development Planner, Planning and Environment Assessment Branch
    Environment Officer, Engineering and Environment Assessment Branch
Their assessment forms part of this report.
4.    CONCLUSION
The proposed development generally complies with the requirements of the planning scheme and
does not raise any significant issues that cannot be addressed by reasonable and relevant
conditions. The application is therefore recommended for approval.


Departments/Sections Consulted:
     Chief Executive Officer                    Community Services                 Corporate Services
     Executive Officer to the Mayor & CEO       Community Facilities               Financial Services
     Executive Support                          Community Development              ICT
                                                Libraries & Galleries              Procurement & Fleet
                                                Local Laws                         Property & Facilities
                                                Waste & Environmental Health       Revenue Services

     Executive Office                       x   Planning & Infrastructure
     Community Engagement                       Building & Plumbing Services
     Customer Service                           Civil Operations
     Economic Development                       Infrastructure Planning & Design
     Governance                             X   Planning & Environment
     Human Resources                            Strategic Land Use Planning
     Sustainability




                                                                                             Page 29 of 29

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.