PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 MAY 2017
RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Environment Committee
Meeting dated 9 May 2017 regarding Application No. OPW17/0024 for a Development Permit for
Operational Works for Prescribed Tidal Works - Extension to an Existing Jetty situated at 9 Cardell
Road, Tewantin and approve the application in accordance with the following conditions:
Approved Plans
1. Vessels associated with the marine use of the facility must only be moored within the
approved lease area
2. The structure identified as “Store” must only be used for the purpose of storage associated
with the marine facility and must not be used for commercial purposes.
3. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
A001 B Site Plan large 17/02/2017
A002 B Site Plan 17/02/2017
A003 B Site Plan – Demo 17/02/2017
A101 B Set Out Plan 17/02/2017
A201 B Office Floor Plan and Elevations 17/02/2017
A202 B Store Plans and Elevations 17/02/2017
4. All structures associated with the development must be constructed wholly within the
approved area
5. Structures must be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall or rock wall. Upon
completion of works, a certification by RPEQ must be provided to Council in this regard.
6. All structures must have no detrimental effects on stormwater drains and/or easements.
7. The jetty and deck areas must be constructed in a manner to render the underside area
vermin proof
8. There must be no electrical reticulation system carrying electricity in excess of 24 volts
beyond the revetment wall unless all switches and power outlets are positioned above the
1%AEP flood level.
9. Lighting associated with the use must be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
10. Wastewater and sullage must only be disposed of at approved pumpout facilities.
11. The mooring facility must not be utilised for live-aboard purposes.
12. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 2009.
13. Certification by a Registered Professional Engineer of Queensland that states that the works
have been constructed in accordance with best practice methods and are structurally sound
must be submitted to Council. This certification must be submitted to Council within three (3)
months of the date of this approval. A final inspection and approval of the structure by
Council’s Inspector is also required. Please contact Council’s Planning Assessment Section
(Development Audit & Response Officer 0428738563) to arrange the inspection.
Page 10 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.