Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2017-05-09 Planning & Environment Committee Agenda

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         9 MAY 2017


2.    All equipment and structures associated with the works must be located in accordance with
      the approved plans.
3.    Safe access in the vicinity of the works must be maintained at all times.
4.    Any construction and post construction activity is not to impact on the condition of the
      waterway, and is to be conducted so as not to breach the Environmental Protection Act (EPA)
      1994 and the Environmental Protection (Water) Policy 2009.
5.    Certification by a Registered Professional Engineer of Queensland must be submitted to
      Council at the completion of the works. The certification must state that the works have been
      constructed in accordance with best practice methods, are in accordance with Coastal
      Protection and Management Act 1995.

REPORT
1.    PROPOSAL
The application seeks approval for a Development Permit for Operational Works for Prescribed
Tidal Works. Specifically, approval is sought for the installation of oyster reef restoration units at
15 sites throughout the Noosa River. The locations for the 15 sites are all within the intertidal zone
of the Noosa River and each unit is proposed to be sited marginally above the lowest astronomical
tide at each of the 15 sites. The land identified as the property (Noosa Woods Park & Public Toilets
Claude Batten Drive, Noosa Heads) is for record keeping purposes only.
Each oyster reef restoration unit will occupy 12m2 at the 15 sites which equates to a total area of
180m2. Each unit is intended to be located within a 90m2 resource area at all 15 sites equating to
a total area of 1,350m2. A locality plan is provided below in Figures 1 and 2 which depict the
approximate location of each of the sites. Figures 3 and 4 illustrate the layout of each unit and
associated resource area and buffer.




                               Figure 1 – Locality Plan of Sites 1 to 12

                                                                                      Page 25 of 29
Log in to download the original file

2017-05-09 Planning & Environment Committee Agenda(PDF, 2MB).pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.