Original source · versioned page text
ADOPTION OF DESTINATION MANAGEMENT PLAN · Report
Plans and drawings: the text below has words only, no drawings.
GENERAL COMMITTEE MEETING 15 DECEMBER 2025 Development of a Draft implementation framework, including monitoring and evaluation measures to track progress and ensure accountability. 5.2 Governance The DMP’s development has been guided by strong governance structures to ensure transparency, alignment with Council priorities and rigour in decision-making: Project Control Group (PCG): Comprised of Councillors, Council executives and external stakeholders and experts, the PCG provided strategic oversight, guidance and review throughout the early and defining stages of the project. External Reference Group: Comprised of community members representing a number of organisations and associations across Noosa Shire, they assisted with how to engage and communicate with the community. Internal Advisory Team: Operated at a tactical level to ensure proposed actions could be integrated into operational planning across Council business units. Regular Reporting: The project team provided consistent updates to the PCG and held numerous workshops with Councillors to ensure visibility of progress, evidence and community feedback. 5.3 Meaningful and Representative Engagement The DMP was informed by extensive consultation, designed to capture a representative cross- section of the community and tourism stakeholders across two major community engagement phases. Key elements of the engagement process included: Multi-Channel Outreach: Consultation incorporated online surveys, in-person workshops, community pop-ups, and targeted stakeholder interviews. This approach ensured accessibility for all residents and businesses. Representative Sampling: Surveys and feedback mechanisms were designed to be statistically valid and stratified, reflecting the diversity of the community across geography, age, household type, and other demographics. Meaningful Participation: Engagement was not tokenistic. Participants were invited to share detailed insights on key issues such as short-stay accommodation, day-tripper impacts, transport, environment, and events. Their feedback directly shaped the Plan’s principles, goals, and actions. 5.4 Social Media and Digital Engagement Recognising the value of digital platforms for wide-reaching engagement, the DMP leveraged social media and digital advertising to connect with the community. Social media played a critical role in reaching a broad audience, complementing in-person engagement. Meta (Facebook & Instagram) Advertising Campaigns: Reach: 167,000 users Impressions: 491,000 Video Views: 80,765 Link Clicks: 9,152 Post Engagements: 90,665 Landing Page Views: 5,434 These social media and digital channels complemented traditional engagement methods and helped reach demographics that are often underrepresented in face-to-face consultation, including younger residents and visitors. The campaigns were designed to inform, invite feedback and encourage participation in surveys and workshops. 5.5 Representative and Statistically Valid Engagement Engagement was designed to ensure that the feedback collected was robust, reliable, and representative of the wider community: Stratified Sample: Survey responses were weighted to reflect Noosa’s geographic and demographic diversity. Statistical Validity: Council conducted two community engagements, resulting in over 2,300 individuals participating and yielding 937 valid data records during Phase 1, and 1,099 during Phase 2 the findings are considered highly representative, and additional responses would be unlikely to
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original