Skip to the record
Every meeting, every word.

Original source · versioned page text

Appendix 3 - Code Table Assessment

Attached to the e-mail MCU15/0034 Development Application - Cover letter, Forms, Proposal plans & Planning Reports.

of 17

Page text shows just the words. Original shows the document exactly as it was published.

       Specific Outcome              Probable Solution                   Compliance
   premises;                     OR                             from the eastern lot boundary,
b) designed and positioned to                                   approximately 875m from the
   visually integrate with the   S7.2 Plant and equipment are   western lot boundary and
                                 located within a building.     approximately 600m from
   building and roof design; and
                                                                Schreibers Road.
c) appropriately screened.
                                                                Furthermore, the property
                                                                contains pockets of vegetated
                                                                areas which will help screen the
                                                                facility to the north, east and
                                                                west and the backdrop of an
                                                                existing ridge line to the south
                                                                will provide a buffer along the
                                                                property boundary which will
                                                                effectively integrate the facility
                                                                from dwellings located in the
                                                                surrounding area. This is
                                                                considered to be in accordance
                                                                with S7.1.

                                                                Furthermore, noise and
                                                                vibration emissions associated
                                                                with the proposed facility will
                                                                be limited to the construction
                                                                phase. Noise generated during
                                                                the construction phase will be
                                                                of short duration and will be in
                                                                accordance with the standards
                                                                outlined in the Environmental
                                                                Protection Regulation 1998 and
                                                                Environmental Protection
                                                                (Noise) Policy 1997.
                                                                Construction works will only
                                                                occur between the hours of
                                                                7.00am and 6.00pm.

                                                                There will be some low level
                                                                noise from the ongoing
                                                                operation of air conditioning
                                                                equipment associated with the
                                                                outdoor cabinets, once
                                                                installed. Noise emanating from
                                                                the air conditioning equipment
                                                                is at a comparable level to a
                                                                domestic air conditioning
                                                                installation, and will generally
                                                                accord with the background
                                                                noise levels prescribed by
                                                                Australian Standard AS1055.
                                                                The air conditioning unit will be
                                                                well removed from surrounding
                                                                residential dwellings.
Environment & heritage values    No solution provided           O37 - Complies.
O37 There are no significant                                    It is considered that the


NBN-4BBZ-4GYM-5132-Schreibers                                                       Page 71
Log in to download the original file

Appendix 3 - Code Table Assessment.pdf · 291 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.