Council archive · source document
Decision Notice - 010.2008.00002047.001 [As Published] · 132008.2047
2008/2047
DA00 Proposed Site Plan – Design Gumbo December 2008
Architects
DA01 Proposed Sub Floor Plan – Design December 2008
Gumbo Architects
DA02 Proposed Lower Level Plan – Design December 2008
Gumbo Architects
DA03 Proposed Upper Level Plan – Design December 2008
Gumbo Architects
DA04 Proposed Elevations – North & East – December 2008
Design Gumbo Architects
DA05 Proposed Elevation – West & Section – December 2008
Design Gumbo Architects
and may be amended by these conditions and annotations on the plans.
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. Earthworks required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or concentrate or direct overland flow on to an
adjoining property.
4. All new hot water systems installed shall be either solar systems; electric heat pump systems;
or gas systems (LPG or natural).
5. A minimum of 20% of the site shall be retained as soft landscaping.
6. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use. In this regard, the
removal of vegetation shall not extend beyond 3 metres of the building footprint of the
Detached House.
7. All other vegetation shall be protected from interference resulting from clearing or construction
activities by:
7.1 Clearly marking vegetation to be retained with flagging tape;
7.2 Installing protective fencing around the drip line of the vegetation;
7.3 Stockpiling, storage and vehicle parking occurs in already cleared areas and does not
cause interference with vegetation; and
7.4 Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
8. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
8.1 Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
8.2 Disposal for firewood.
8.3 Disposal for landscaping purposes.
8.4 Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00002047.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 59 KB (small file)
- File type
No other editions are linked here.