Project Status Report Project Clear All VY? Filters »
Noosa
& PY. Search
The Nature
onservancy - Project Name Accurate as of Project Phase Overall = Cost Scope PercentComplete
Australia
Noosa 1/03/2021 Se ee ee 85% Filters on this visual
| YB
Description
Project Description is (All)
Restoring Oyster Ecosystems in the Noosa River Estuary 4 restoration sites in the lower Noosa River estuary. Two in the main channel and two in the lower reaches of Weyba Creek. The sites are: - Goat Island
(main channel) - Tewantin (main channel) - Noosa Sound East (Weyba Creek) - Noosa Sound West (Weyba Creek)
Key Message Upcoming Milestones
- Waiting on the outcome of the permit conditions negotiation with DAF Task Name % Task Start Date Dependent on Task Finish Di,
- Contract developed for construction, awaiting permit outcome. ~ ae
- Winter and Spring Oyster Chronicle sent to mailing list Approvals Part B: Project Restoration Plan 89.00 1/07/2021 19/11/2021
- All shell cleaned and bagged, 7 tonnes at hatchery and 8 tonnes waiting at resource centre submitted for development consent
- First oyster gardening events (information sessions) completed Brood stock collection permit 100.00 1/03/2021 1/03/2021
aS
- Monitoring contract in development Full Scale Reef Restoration 0.00 4/08/2021 23/08/2022
----- Fa ek or en ac an aunninnnas aunninnns
Sa
~
ai
L =
- -
3See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.