Bushfire Hazard Assessment & Management Plan v4                                                                                                                                                                  NCES REF: J000841
Lot 4 on SP320405 – 7 Triller Court, Pomona




Table 3 – Table 8.2.3.3 Bushfire Hazard Areas – Part 8 Overlay Code Noosa Plan 2020


 PERFORMANCE OUTCOMES                                            ACCEPTABLE OUTCOMES                                                         PROPOSED SOLUTION

 Safety of people and property

 PO1                                                             AO1.1                                                                       This Bushfire Hazard Assessment and Management Plan has been prepared to
 Development maintains the safety of people and                  Development which will materially increase the number of people             maintain the safety of people and property from the adverse impacts of bushfire.
 property from the adverse impacts of bushfire.                  living or congregating on premises, including reconfiguring a lot, is not
                                                                                                                                             AO1.1 –The proposed development is located outside of a mapped medium or
                                                                 located within a medium or high bushfire hazard area.
                                                                                                                                             high bushfire hazard area as depicted on the Local Hazard Area Map BF03.
                                                                 AO1.2                                                                       AO1.2 – The development has provided minimum setbacks between the
                                                                 Development maximises setbacks from hazardous vegetation to                 proposed building envelopes and the offsite hazardous vegetation to achieve the
                                                                 achieve an acceptable risk.                                                 SPP Assessment Benchmark 4 criteria of <29kW/m2 radiant heat flux exposure.
                                                                                                                                             This setback achieves an acceptable risk where all the mitigation measures
                                                                 Editor’s Note —PSP8 Natural Hazards provides guidance for                   detailed within this report are employed.
                                                                 assessing bushfire hazard risk and preparing a bushfire hazard
                                                                 management plan.


 Impact on Ecologically Important Areas

 PO2                                                  No acceptable outcome provided                                                         No clearing of vegetation for bushfire mitigation measures is required. The
 Bushfire mitigation measures do not adversely impact                                                                                        bushfire mitigation measures prescribed herein will not adversely impact on
 on:                                                                                                                                         biodiversity values, connectivity, ecosystem functioning, and the long-term
                                                                                                                                             physical integrity of waterways, wetlands and areas of native vegetation.
 a) biodiversity values, connectivity and ecosystem
 functioning; and
 b) the long term physical integrity of waterways, wetland
 and areas of native vegetation.

 Water Supply for Fire Fighting Purposes

 PO3                                                        AO3.1                                                                            AO3.1 – The site will be connected to a reticulated water supply.
 Development provides an adequate water supply for Premises are connected to the reticulated water supply.
 firefighting purpose which is reliable, safely located and
 freely accessible.                                         Editor's note—For reconfiguring a lot, water supply needs to provide
                                                            for a minimum flow and pressure of 10 litres a second at 200kPa at all
                                                            times for firefighting purposes.

                                                                 OR

                                                                 AO3.2
                                                                 Where there is no available reticulated water supply, the premises
                                                                 has:

                                                                 a) an accessible dam, swimming pool or water tank available for
                                                                 firefighting purposes with an onsite water volume of not less than
                                                                 5,000 litres; and
                                                                 b) a water supply outlet pipe 50 millimetres in diameter fitted with a
                                                                 standard fire brigade fitting connected to the water supply (other than
                                                                 where the water supply is in a swimming pool or dam).




© 2023                                                                                                            28
Log in to download the original file

Bushfire Hazard Assessment & Management Plan v4 - 7 Triller Court, Pomona.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.