                                              Officer:          Jack Lewis
                                              Direct Telephone: (07) 5449 5183
                                              Response Address: Locked Bag 72
                                                                Sunshine Coast Mail Centre QLD 4560
                                              Email:            [email protected]
                                              Our Reference:    DNA 157 (1989/112)
                                              Your Reference:
26 November 2009

Waters Family Trust
CARE KHA Development Managers
PO Box 6380
MAROOCHYDORE BC QLD 4558

Dear Sir/Madam
Re:    Application for a Change to a Development Approval for Light Industry (Refrigeration
       Works and Motor Repairs) situated at 3/8 Commerce Court, Noosaville described as Lot
       0 & 3 BUP 12535

I refer to your request to make a change to the above development approval. On 24 November 2009
Council decided to:

A.     Approve a change to Conditions 1 and 7 to read as follows:

       1. Development undertaken in accordance with this approval must generally comply with the
          approved plans of development. The approved plan is titled Building Approval Application
          and dated August 2007 and as may be amended by these conditions.

       7. The proposed building must maintain a minimum 1.5 metres clearance from the nearest
          part of the Council sewer to the outermost projection of the building (including roof
          overhang), Or;
          The roof overhang may encroach no closer than 1.0 metre from the centre line of the
          sewer pipe, provided a deed of indemnity is signed by the property owner(s). A revised
          plan must be provided to Council for approval, with the required clearances annotated.

B.    Include the following additional conditions:

      1. Storm water retention systems and gross pollutant traps must maintain a minimum
         clearance of 1.5 metres from Council sewerage infrastructure.

      2. Construction works undertaken in the vicinity of Council water supply or sewerage
         infrastructure must not adversely affect the integrity of the infrastructure. All costs
         associated with repair, replacement or alteration of infrastructure must be met by the
         applicant

C.    Issue a Change to Development Approval.

Should you wish to obtain more information about Council’s decision, electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

Yours faithfully,



Denis Wallace
Senior Development Planner

Used in these records

About this file

File size
7 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Council Decision - Changes - old apps - 005.1989.00000112.003 [As Published].pdf · 7 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.