Appendix C - Existing Approvals · 132000.200359.3

of 10

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                         4


8.       Energy dissipation methods shall be deployed at the lower end of the driveway (Sketch-03) in order to
         reduce the effects of stormwater runoff washing away any vegetation. In this regard, energy dissipaters
         such as stone pitching may be appropriate. But no matter what method is employed, the aim should be to
         disperse the water over the full width of the driveway and to minimise the effects of a potential wash out.

Land Use

9.       Development undertaken in accordance with this approval must generally comply with the approved plans
         of development. The approved plans are numbered 95:456 WD1 titled Site Plan prepared by Nicholas
         Mandikos & Associates and dated Nov ‘99, 95:456 WD1.2 titled Site Plan - Levels prepared by Nicholas
         Mandikos & Associates and dated Mar ‘01, 95:456 WD2 titled Ground & First Floor Plans prepared by
         Nicholas Mandikos & Associates and dated Nov ’99, 95:456 WD3 titled Basement & Roof Plans prepared
         by Nicholas Mandikos & Associates and dated Nov ‘99, 95:456 WD4 titled Elevations prepared by
         Nicholas Mandikos & Associates and dated Dec ’99, and 6398-S1 to 6398-S3 prepared by Leddy
         Sergiacomi & Associates Pty Ltd and dated 12/99 and as may be amended by these conditions.

10.      The garage in the basement level is to be accessed from the northern elevation of the building.

11.      The development must be undertaken and operated in a manner that causes no detrimental effect upon
         the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
         emissions.

12.      Existing trees on the site and within road reserves are to be retained, except where required to be
         removed due to building operations.

13.      This Development Permit for a material change of use of premises lapses if:-

         13.1      the use or erection of a building or other structure associated with the use, has not been
                   commenced within four (4) years of the date of issue of the Development Permit, unless
                   application is made and approved by Council for an extension; or

         13.2      the use of any premises pursuant to the Development Permit ceases.

14.      The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to
         obtaining a Development Permit for building works.




SEP o:\database\onestop\decision.doc

Used in these records

About this file

File size
386 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C - Existing Approvals.pdf · 386 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.