Appendix D - Traffic Impact Assessment
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
Proposed Service Station,
123 Eumundi – Noosa Road,
Noosaville
Traffic Report
Revision B
1 October 2015
Our Ref: 148_SYN08
Prepared for: Synergy Property Partners
Prepared by: Richard Quinn
Director, Q Traffic
BE Civil, MIEAust, RPEQ
Q Traffic
Brisbane Office
(07) 3166 9216
GPO Box 1747
Brisbane QLD 4001
www.qtraffic.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 21 pages
Page 2
Proposed Service Station, 123 Eumundi – Noosa Road, Noosaville
Traffic Report Rev B
Contents
1.0 Introduction ................................................................................................................................................................... 1
2.0 Background and Context ........................................................................................................................................... 2
2.1 Subject Site ................................................................................................................................................................... 2
2.2 Local Road Network ................................................................................................................................................... 3
3.0 Proposal ........................................................................................................................................................................ 4
3.1 Vehicle Access .............................................................................................................................................................. 5
3.2 Car Parking Provision ................................................................................................................................................. 5
3.3 Bicycle Parking Provision ........................................................................................................................................... 5
3.4 Parking Layout and Internal Configuration............................................................................................................ 6
3.5 Servicing Arrangements ............................................................................................................................................. 6
4.0 Traffic Impact Assessment .......................................................................................................................................... 7
5.0 Recommendation ......................................................................................................................................................... 8
5.1 Qualifications ............................................................................................................................................................... 8
Appendices
APPENDIX A
Proposed Development Plans
APPENDIX B
Swept Path Diagram – Fuel Tanker
(19m Articulated Vehicle)
APPENDIX C
Swept Path Diagrams
Heavy Rigid Vehicle
Q Traffic has prepared this report solely for the benefit and use of our Client for the sole purpose of lodging a development application. This report
takes into account the particular instructions and requirements of the client. In preparing this report we assume that all information and documents
provided to us by the client or their consultants were complete, accurate and current. Q Traffic will not be liable for any conclusion drawn resulting
from omission or lack of full disclosure by the client or their consultants.
This report may not be relied upon by a third party. Q Traffic does not and shall not assume any responsibility or liability whatsoever to any third
party arising from the use, reliance upon, or any decision made regarding the contents of this report.
© Q Traffic 2015
Our Ref: 148_SYN08
1 October 2015
Page 3
Proposed Service Station, 123 Eumundi – Noosa Road, Noosaville
Traffic Report Rev B
1.0 Introduction
Q Traffic was commissioned by Synergy Property Partners to undertake a Traffic Impact Assessment of a proposed
Service Station to be located at 123 Eumundi – Noosa Road, Noosaville.
The site is located in the Noosa Shire Local Government Area and the proposal has been assessed considering the relevant
Council controls.
This report provides relevant background information regarding the proposal, and documents the results and findings of
our investigations addressing the following key traffic design elements and issues:
• Vehicular access arrangements;
• On-site car parking provision;
• Service vehicle requirements; and
• The traffic impacts anticipated as a result of the development.
Our Ref: 148_SYN08 Page 1 1 October 2015
Page 4
Proposed Service Station, 123 Eumundi – Noosa Road, Noosaville
Traffic Report Rev B
2.0 Background and Context
2.1 Subject Site
The subject site is located at 123 Eumundi – Noosa Road, Noosaville, on the north-eastern corner of the Eumundi – Noosa
Road / Walter Hay Drive Roundabout. The property description is Lot 30/SP170751.
The site is currently vacant, however a vehicular crossover exists on the Eumundi – Noosa Road approximately 15m from
the north-east site boundary (i.e. approximately 70m from the Eumundi – Noosa Road / Walter Hay Drive Roundabout).
This driveway caters for the left-in and left-out movements only, as Eumundi – Noosa Road is a median-divided road.
Figure 2.1a and Figure 2.1b below show the location of the subject site, and the site itself.
The subject site is approximately 5,018m² in area. The proposal is for the construction of a service station on the southern
portion of the site (adjacent to the Eumundi – Noosa Road / Walter Hay Drive Roundabout), on a parcel of land of
approximately 2,444m². The balance land will remain under the ownership of the Good Shepherd Lutheran College.
SITE
Figure 2.1a: Site Location
Figure 2.1b: Subject Site
Our Ref: 148_SYN08 Page 2 1 October 2015
Page 5
Proposed Service Station, 123 Eumundi – Noosa Road, Noosaville
Traffic Report Rev B
2.2 Local Road Network
The site has frontage to Eumundi – Noosa Road to the north-west, and Walter Hay Drive to the south-west, both of which
are under the control of Noosa Shire Council.
Eumundi – Noosa Road connects from the Bruce Highway at Eumundi, to Eumundi Road (at the Goodchap Street
roundabout) at Noosaville, just to the north of the site. It has a four-lane, two-way divided cross-section in the vicinity of
the site, and is posted at 60km/hr, with the exception of a 40km/hr school zone which extends from the Eumundi Road /
Goodchap Street roundabout to the north of the site, along the frontage of the Good Shepherd Lutheran College (in both
directions of travel).
Figure 2.2a below shows Eumundi – Noosa Road, looking south towards the Walter Hay Drive roundabout.
Development Site
Existing Access Driveway
Figure 2.2a: Eumundi – Noosa Road, looking south towards Walter Hay Drive roundabout
Walter Hay Drive connects from the Eumundi – Noosa Road roundabout adjacent to the subject site, to Emu Mountain
Road at Doonan, approximately 4km to the south of the site. It has a two-lane, two-way divided cross-section in the
vicinity of the site, and is posted at 60km/hr, with the exception of a 40km/hr school zone which extends from the
Eumundi – Noosa Road roundabout, along the frontage of the Good Shepherd Lutheran College (in both directions of
travel).
Figure 2.2b below shows Walter Hay Drive, looking west towards the Eumundi – Noosa Road roundabout.
Development Site
Figure 2.2b: Walter Hay Drive, looking west towards Eumundi – Noosa Road roundabout
Our Ref: 148_SYN08 Page 3 1 October 2015
Page 6
Proposed Service Station, 123 Eumundi – Noosa Road, Noosaville
Traffic Report Rev B
3.0 Proposal
The development application seeks approval for a Service Station on the subject site.
A plan of the proposal is included as Appendix A, and an extract is provided as Figure 3a below. As shown in these
plans, the proposal includes three (3) fuel bowsers and associated canopy / hardstand area, with a petrol shop of
approximately 195m² (including amenities), and refuse / service yard of approximately 56m².
Parking is proposed for 10 cars and two motorcycles (in addition to the parking area provided at the fuel bowsers), and the
layout accommodates the swept path of fuel tankers and regular delivery vehicles.
The traffic elements of the proposed site layout are discussed further in the following sections, considering the
requirements of the Driveways and Carparking Code (Division 13) in the Noosa Plan, as well as Noosa Planning Scheme
Policy 26 – Motorcycle and Motor Scooter Parking, and the relevant Australian Standards.
Figure 3a: Proposed Site Layout
Our Ref: 148_SYN08 Page 4 1 October 2015
Page 7
Proposed Service Station, 123 Eumundi – Noosa Road, Noosaville
Traffic Report Rev B
3.1 Vehicle Access
Access to the site is proposed via a left-in, left-out driveway on Eumundi – Noosa Road, in approximately the same
location as the existing access driveway to the site. Given the presence of roundabouts on Eumundi – Noosa Road both
north and south of the site, access to the development will be convenient from all directions.
The existing site access driveway (currently approximately 7m wide) will be widened and upgraded to accommodate the
largest vehicle anticipated to access the site (a 19m long articulated fuel tanker, as discussed in the following sections),
with appropriate splays and geometric detail in accordance with Council’s relevant Standard Drawings. The access
arrangements will encourage efficient and legible one-way (clockwise) circulation through the site.
A 2m island is proposed between the driveway entry and exit lane, to act as a refuge for pedestrians crossing the driveway
along Eumundi – Noosa Road.
It is proposed that an access easement be created, in order to preserve access to the balance land which will remain under
the ownership of the Good Shepherd Lutheran College. This will minimise the number of driveways on Eumundi – Noosa
Road, and minimise the impact of site-generated traffic upon the adjacent road network. Whilst not forming part of this
application, a high level concept plan is included in the DA drawing set (Appendix A) which indicates how the balance
land might be developed at a future date to accommodate a small industrial or retail-type use.
Overall, the site access arrangements are consistent with the existing arrangements, and are considered to be appropriate
given the nature of the use and the existing road environment.
3.2 Car Parking Provision
The Driveways and Carparking Code (Division 13) in the Noosa Plan stipulates a minimum parking rate for a service
station of 4 spaces per service bay, with a minimum of 5 spaces to be provided.
The proposed development does not include any service bays, and therefore the minimum parking requirement based upon
the application of this rate is 5 parking spaces.
As shown in the site plans included in Appendix A, a total of 10 car parking spaces are proposed on the site, including
one accessible parking space. Provision is also made for at least 18 queued vehicles in the pump filling area, as well as
two motorcycle parking bays (as required under Table 3.1 of the Noosa Planning Scheme Policy 26 – Motorcycle and
Motor Scooter Parking. The proposed level of on-site parking provision therefore exceeds the minimum requirement
stipulated in the Noosa Plan.
Notwithstanding the above, reference has been made to the parking rate stipulated in the Sunshine Coast Planning Scheme
2014, which is 1 space / 20m2 GFA (when involving sale of goods) + 2 spaces / service bay (min. 4 spaces). The
application of this parking rate to the proposed shop GFA of 195m² suggests a parking requirement of 10 parking spaces.
The proposal therefore meets this requirement.
3.3 Bicycle Parking Provision
The Driveways and Carparking Code (Division 13) in the Noosa Plan requires that secure and convenient parking space
for bicycles be provided on site in accordance with AS2890.3 Bicycle Parking Facilities and Figure 14-1 Minimum
Requirements for Bicycle Parking. However this figure in the Noosa Plan does not stipulate a bicycle parking rate for a
development of the nature of that proposed (Retail Type 5: Vehicle Uses).
The Noosa Plan suggests a bicycle parking rate for various other retail uses (Type 2: Shop & salon, Type 3: Landscape &
rural, Type 6: Hardware Store, Type 7: Garden and Lifestyle Centre) of 1 bicycle parking space per 100m2 or part thereof
of gross floor area. The application of this parking rate to the proposed building area suggests a requirement for two (2)
bicycle parking spaces, or one bicycle parking rail.
Given that there are a number of areas on the site where a bicycle parking rail could be installed, it is assumed that the
detail of the bicycle parking provisions could reasonably be dealt with as a condition of the approval, at detailed design
stage.
Our Ref: 148_SYN08 Page 5 1 October 2015
Page 8
Proposed Service Station, 123 Eumundi – Noosa Road, Noosaville
Traffic Report Rev B
3.4 Parking Layout and Internal Configuration
The car park layout has been designed generally in accordance with the requirements of the Driveways and Carparking
Code (Division 13) in the Noosa Plan, which references AS2890.1 – Parking Facilities Part 1: Off Street Car Parking and
AS2890.2 – Off Street Parking Part 2: Commercial Vehicles, as discussed following:
• Parking spaces are 2.7m wide, which exceeds the requirement for User Class 3A (high turnover) spaces under
AS2890.1, noting that aisle widths are a minimum of 6.6m, providing additional allowance above the minimum
width required for single manoeuvre entry and exit;
• Parking spaces are 5.4m long, which meets the requirement under AS2890.1; and
• The parking space for people with disabilities is located in convenient proximity to the entrance to the building.
The space is 2.4m wide and 5.4m long, with an adjacent shared area, in accordance with the requirements of
AS2890.6:2009.
In summary, the car park layout is efficient and legible, and designed generally in accordance with Council’s
requirements, as well as those stipulated in the relevant Australian Standards (AS2890.1, AS2890.2, and AS2890.6).
3.5 Servicing Arrangements
The site has been designed to accommodate the swept path of a 19m Articulated Vehicle for refuelling, as shown in the
plan included as Appendix B. The vehicle would enter the site via the left-in driveway on Eumundi – Noosa Road,
proceed to the appropriate area for refuelling, and then exit the site via the left-out exit driveway onto Eumundi – Noosa
Road.
The spacing of the pumps, location of the fill points, and internal configuration of the site have been designed based on the
manoeuvring requirements of this vehicle, and provision is made for a height clearance of 4.5 metres under the canopy to
accommodate the fuel tanker.
It should be noted that a fuel tanker in the refuelling position would not impede access to or egress from the site, nor
would it prevent access to four of the six refuelling positions at the bowsers, or the vast majority of parking spaces on the
site.
Swept path analysis has also been carried out for the largest rigid service vehicle anticipated to require access to the site (a
heavy rigid vehicle), with the results showing the vehicle entering the site, manoeuvring into the service bay at the end of
the building, and exiting the site in a forward gear (see Appendix C).
Overall, the servicing arrangements are considered to be efficient and legible, and adequate given the scale and nature of
the proposed development.
Our Ref: 148_SYN08 Page 6 1 October 2015
Page 9
Proposed Service Station, 123 Eumundi – Noosa Road, Noosaville
Traffic Report Rev B
4.0 Traffic Impact Assessment
The Department of Main Roads’ Road Planning and Design Manual (Chapter 3), as well as the RTA Guide to Traffic
Generating Developments, suggest that service stations generate approximately 66 trips / 100m² GFA in the critical (PM)
peak hour.
The application of this rate to the proposed shop GFA of 195m² provides an estimated trip generation of 129 trips (entry
and exit), in the peak hour.
It is important to note however that service stations are primarily convenience-based land uses, for which a large
proportion of the customers are passing motorists. Given the nature and location of the proposed development, undiverted
drop in trips are expected to account for 75% of the traffic generated by the development, and only approximately 25% of
trips are expected to be new trips.
On this basis, the proposed development is predicted to generate in the order of 32 new trip ends (i.e. 16 entry movements
and 16 exit movements) coincident with the critical PM peak hour. To put this into perspective, this is equivalent to
approximately one additional trip every two minutes, on average. This level of traffic generation is low, and once
distributed onto the surrounding road network, would be within the range of typical fluctuations in traffic volumes.
Furthermore, given that access to the proposed development would be via left-in and left-out movements only, the impact
of these turning movements upon traffic on the adjacent road network would be low.
In light of the above, no material impact upon the performance of the surrounding road network is anticipated as a result
of the development. As a consequence, no external roadworks should be imposed upon this development, and any impacts
(however minor) could be mitigated by way of infrastructure charges levied against the development.
Our Ref: 148_SYN08 Page 7 1 October 2015
Page 10
Proposed Service Station, 123 Eumundi – Noosa Road, Noosaville
Traffic Report Rev B
5.0 Recommendation
In light of the information contained within this report, we consider that the proposal is satisfactory from a traffic
operations perspective and recommend that the development application be approved.
5.1 Qualifications
This report has been approved by Richard Quinn | Director | RPEQ 08565
Our Ref: 148_SYN08 Page 8 1 October 2015
Page 11
APPENDIX A Proposed Development Plans
Page 12
23/09/2015 1:40:44 PM
RPD
LOT 30 on SP 170751
TOTAL SITE AREA: 5018m²
OAD
SAR
O O
NB
NDI
UMU
E
SUBJECT SITE VIEW A
(APPROX) A
WA
LT
ER
HA
YD
RIV
E
N
LOCALITY PLAN A
revision
16.09.15 BHL D.A. APPROVAL
date by description checked
Figured dimensions to be taken in preference to scale readings
NTS PROJECT MANAGERS
|
DESIGNERS |
PLANNERS |
ENGINEERS |
Head office - 17 Dover Street
Albion QLD 4010 Australia
Email: [email protected]
Ph. 61 7 3854 2900
Fax. 61 7 3854 2999
Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
This document may not be copied, reproduced, retained or disclosed to any unauthorised
person, either wholly or in part, without prior consent in writing from Tam Faragher &
VIEW B project
Associates.
ACN 054 486 743
PROPOSED SERVICE STATION for SYNERGY
PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
WALTER HAY DRIVE) NOOSAVILLE, QLD
title
SITE LOCALITY PLAN
drawn approved date created scale
BHL ROB SEP 2015 As indicated
status drawing no. rev.
D.A. ISSUE 15193 D01 A
Page 13
23/09/2015 1:40:47 PM
PARKING SCHEDULE LEASE SCHEDULE
DISABLED (5.4m x 2.4m) 1 PETROL SITE 2444m² N
-with 5.4m x 2.4m shared bay between VACANT LAND 2574m²
STANDARD (5.4m x 2.6m) 9 (ACCESS EASEMENT 467m²) 4 0 5 10 15 20m
MOTORCYCLE (3.0m x 1.5m) 2
TOTAL 5018m²
Metres
PETROL SITE COVERAGE
LANDSCAPING 739m² 30.2% D04 RPD
BUILDING 254m² 10.4%
CANOPY 319m² 13.1% LOT 30 on SP 170751
7000
PAVEMENT 1132m² 46.3% 1 LAND TOTAL SITE AREA: 5018m²
SCAP
TOTAL LEASE AREA 2444m² 100% ING
WALTE
10000
ENT
BUILDING AREAS EASEM
R HAY
SERVICE STATION 194.7m²
REFUSE & SERVICES YARD 56.2m²
TOTAL 253.6m²
ING
DRIVE
LOAD
10
FUEL STORAGE D04
2
UNLEADED 91 60,000L 6
UNLEADED 95 30,000L VACANT LAND 5
7500
UNLEADED 98 30,000L
DIESEL 60,000L 3750
TOTAL FUEL STORAGE 180,000L 3500 1
REMOTE FUEL M1 M2
FILL POINTS 9200
AIR & WATER
7200
** FUEL TYPES ARE INDICATIVE ONLY & UNDERGROUND STORMWATER 3500
1000
MAY BE SUBJECT TO CHANGE DURING DETENTION TANK WITH 4
DETAIL DESIGN STAGE. TOTAL FUEL FILTRATION SYSTEM TO COMPLY D04
STORAGE WILL NOT EXCEED 500,000L WITH DIVISION 20 WATER
SENSITIVE DESIGN CODE
(INDICATIVE ONLY)
THE SITE WILL BE PROVISIONED WITH
S
ALL NECESSARY UNDERGROUND PIPE
TANK
30
WORK FOR VR2 00
AGE
10
13
STOR
5
GENERAL NOTES
UEL
ACCESS
U/G F
EASEMENT FUEL VENTS
CARPARKING AND ROAD AISLES TO BE IN
ACCORDANCE WITH AS2890.1 & AS2890.6.
CARPARKING AREAS TO BE MIN. 5.4m(L) x 2.6m(W)
A 16.09.15 BHL D.A. APPROVAL
FOR STANDARD PARKS & MIN. 5.4m(L) x 2.4m(W) revision date by description checked
8400
FOR DISABLED PARKS.
DIRECTIONAL SIGN LANDSCAPING Figured dimensions to be taken in preference to scale readings
PROJECT MANAGERS
|
DESIGNERS |
ENTRY EXIT PLANNERS |
ENGINEERS |
PED. REFUGE DIRECTIONAL PRIME SIGN Head office - 17 Dover Street
PP Albion QLD 4010 Australia
SIGN Email: [email protected]
PP Ph. 61 7 3854 2900
COLOURS & SELECTED BUILDING Fax. 61 7 3854 2999
MATERIALS SHOWN ARE INDICATIVE & MAY 3 Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
BE SUBJECT TO VARIATIONS DURING C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
FINAL DETAIL DOCUMENTATION This document may not be copied, reproduced, retained or disclosed to any unauthorised
EUMUNDI NOOSA ROAD D04
project
person, either wholly or in part, without prior consent in writing from Tam Faragher &
Associates.
ACN 054 486 743
PROPOSED SERVICE STATION for SYNERGY
ALL SIGNAGE SHOWN FOR INDICATIVE
PURPOSES ONLY AND SUBJECT TO THE PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
APPROVAL OF A SEPARATE OPERATIONAL WALTER HAY DRIVE) NOOSAVILLE, QLD
WORKS PERMIT (WHERE REQUIRED)
title
PROPOSED SITE LAYOUT
drawn approved date created scale
BHL ROB SEP 2015 1 : 400
status drawing no. rev.
D.A. ISSUE 15193 D02 A
Page 14
23/09/2015 1:40:48 PM
N
1 0 1 2 3 4 5m
A/C U Metres
NIT
A/C U
NIT
RPD
LOT 30 on SP 170751
TOTAL SITE AREA: 5018m²
BOH
SERV
ICE Y
ARD
COO
LROO
M
FREE
ZER
AME
NITIE
S
NTER
COU
REFU
SE A
REA
OFFIC
E
RETA
IL AR
EA
ICE B
OX
CANO
FIRE PY LIN
LOAD WOO K OV
ING D ER
WALK
GAS WAY ENTR
CAGE Y
AWN
ING O
VER
A 16.09.15 BHL D.A. APPROVAL
revision date by description checked
Figured dimensions to be taken in preference to scale readings
TGSI PROJECT MANAGERS
|
DESIGNERS |
PLANNERS |
ENGINEERS |
Head office - 17 Dover Street
Albion QLD 4010 Australia
Email: [email protected]
Ph. 61 7 3854 2900
Fax. 61 7 3854 2999
Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
This document may not be copied, reproduced, retained or disclosed to any unauthorised
person, either wholly or in part, without prior consent in writing from Tam Faragher &
Associates.
ACN 054 486 743
project
PROPOSED SERVICE STATION for SYNERGY
PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
WALTER HAY DRIVE) NOOSAVILLE, QLD
title
PROPOSED BUILDING FLOOR PLAN
drawn approved date created scale
BHL ROB AUG 2015 1 : 100
status drawing no. rev.
D.A. ISSUE 15193 D03 A
Page 15
23/09/2015 1:40:52 PM
CANOPY LINK TO BUILDING TO CAR CANOPY PRIME SIGN
PROVIDE ALL WEATHER PROTECTION 3 0 5 10 15m
Metres
CANOPY
4600
GROUND RPD
0 LOT 30 on SP 170751
CONCRETE TILT PANEL ROOFED & SCREENED
WALLS TO BE PAINTED BIN & SERVICE YARD TOTAL SITE AREA: 5018m²
1 SOUTH ELEVATION
D02 1 : 300
ROOFED & SCREENED CANOPY LINK TO BUILDING TO CAR CANOPY FUEL VENTS PRIME SIGN
BIN & SERVICE YARD PROVIDE ALL WEATHER PROTECTION
CANOPY
4600
COLOURS & SELECTED BUILDING
GROUND MATERIALS SHOWN ARE INDICATIVE & MAY
0 BE SUBJECT TO VARIATIONS DURING
FINAL DETAIL DOCUMENTATION
2 EAST ELEVATION FUEL DISPENSER
D02 1 : 300
ALL SIGNAGE SHOWN FOR INDICATIVE
PURPOSES ONLY AND SUBJECT TO THE
APPROVAL OF A SEPARATE OPERATIONAL
WORKS PERMIT (WHERE REQUIRED)
PRIME SIGN CONCRETE TILT PANEL CAR CANOPY
WALLS TO BE PAINTED
CANOPY
4600
GROUND
0
ROOFED & SCREENED FUEL VENTS FUEL DISPENSER
BIN & SERVICE YARD
3 NORTH ELEVATION A
revision
16.09.15 BHL D.A. APPROVAL
date by description checked
D02 1 : 300 Figured dimensions to be taken in preference to scale readings
PROJECT MANAGERS
|
DESIGNERS |
PLANNERS |
ENGINEERS |
Head office - 17 Dover Street
Albion QLD 4010 Australia
Email: [email protected]
Ph. 61 7 3854 2900
PRIME SIGN FUEL VENTS CAR CANOPY CANOPY LINK TO BUILDING TO CONCRETE TILT PANEL Fax. 61 7 3854 2999
PROVIDE ALL WEATHER PROTECTION WALLS TO BE PAINTED Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
This document may not be copied, reproduced, retained or disclosed to any unauthorised
person, either wholly or in part, without prior consent in writing from Tam Faragher &
Associates.
CANOPY ACN 054 486 743
4600 project
PROPOSED SERVICE STATION for SYNERGY
PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
GROUND WALTER HAY DRIVE) NOOSAVILLE, QLD
0
title
FUEL DISPENSER SITE & BUILDING ELEVATIONS
4 WEST ELEVATION
D02 1 : 300 drawn approved date created scale
BHL ROB SEP 2015 1 : 300
status drawing no. rev.
D.A. ISSUE 15193 D04 A
Page 16
23/09/2015 1:40:54 PM
RPD
LOT 30 on SP 170751
TOTAL SITE AREA: 5018m²
COLOURS & SELECTED BUILDING
MATERIALS SHOWN ARE INDICATIVE & MAY
BE SUBJECT TO VARIATIONS DURING
FINAL DETAIL DOCUMENTATION
ALL SIGNAGE SHOWN FOR INDICATIVE
PURPOSES ONLY AND SUBJECT TO THE
APPROVAL OF A SEPARATE OPERATIONAL
WORKS PERMIT (WHERE REQUIRED)
A 16.09.15 BHL D.A. APPROVAL
revision date by description checked
Figured dimensions to be taken in preference to scale readings
PROJECT MANAGERS
|
DESIGNERS |
PLANNERS |
ENGINEERS |
Head office - 17 Dover Street
Albion QLD 4010 Australia
Email: [email protected]
Ph. 61 7 3854 2900
Fax. 61 7 3854 2999
Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
This document may not be copied, reproduced, retained or disclosed to any unauthorised
person, either wholly or in part, without prior consent in writing from Tam Faragher &
Associates.
ACN 054 486 743
project
PROPOSED SERVICE STATION for SYNERGY
PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
WALTER HAY DRIVE) NOOSAVILLE, QLD
title
PERSPECTIVES
drawn approved date created scale
BHL ROB SEP 2015
status drawing no. rev.
D.A. ISSUE 15193 D05 A
Page 17
23/09/2015 1:41:07 PM
N
4 0 5 10 15 20m
Metres
RPD
LOT 30 on SP 170751
TOTAL SITE AREA: 5018m²
WALTE
R HAY
DRIVE
QUEUING FOR MIN. 2 CARS
BEHIND DISPENSER
A 16.09.15 BHL D.A. APPROVAL
revision date by description checked
Figured dimensions to be taken in preference to scale readings
PROJECT MANAGERS
|
DESIGNERS |
PLANNERS |
ENGINEERS |
Head office - 17 Dover Street
Albion QLD 4010 Australia
Email: [email protected]
Ph. 61 7 3854 2900
Fax. 61 7 3854 2999
Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
This document may not be copied, reproduced, retained or disclosed to any unauthorised
EUMUNDI NOOSA ROAD
person, either wholly or in part, without prior consent in writing from Tam Faragher &
Associates.
ACN 054 486 743
project
PROPOSED SERVICE STATION for SYNERGY
PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
WALTER HAY DRIVE) NOOSAVILLE, QLD
title
SITE QUEUING PLAN
drawn approved date created scale
BHL ROB SEP 2015 1 : 400
status drawing no. rev.
D.A. ISSUE 15193 D13 A
Page 18
23/09/2015 1:41:09 PM
N
4 0 5 10 15 20m
Metres
RPD
LOT 30 on SP 170751
TOTAL SITE AREA: 5018m²
WALTE
ENT
EASEM
R HAY
USE AREA
605m²
DRIVE
INDUSTRY TYPE1/2 OR
ING
RETAIL TYPE 3/4/5/6
SCAP
LOADING
LAND
5 1
UNDERGROUND STORMWATER DETENTION
TANK WITH FILTRATION SYSTEM TO COMPLY
WITH DIVISION 20 WATER SENSITIVE DESIGN
CODE (INDICATIVE ONLY)
6 10 11 13
14
17
A 16.09.15 BHL D.A. APPROVAL
revision date by description checked
LANDSCAPING Figured dimensions to be taken in preference to scale readings
PROJECT MANAGERS
|
DESIGNERS |
PLANNERS |
ENGINEERS |
Head office - 17 Dover Street
Albion QLD 4010 Australia
Email: [email protected]
Ph. 61 7 3854 2900
Fax. 61 7 3854 2999
Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
EUMUNDI NOOSA ROAD
This document may not be copied, reproduced, retained or disclosed to any unauthorised
person, either wholly or in part, without prior consent in writing from Tam Faragher &
Associates.
ACN 054 486 743
project
PROPOSED SERVICE STATION for SYNERGY
PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
WALTER HAY DRIVE) NOOSAVILLE, QLD
title
POTENTIAL ADJOINING LOT LAYOUT
drawn approved date created scale
BHL ROB SEP 2015 1 : 400
status drawing no. rev.
D.A. ISSUE 15193 D14 A
Page 19
APPENDIX B Swept Path Diagram — Fuel Tanker (19m Articulated Vehicle)
Page 20
23/09/2015 1:41:04 PM
N
4 0 5 10 15 20m
Metres
RPD
WALTE
LOT 30 on SP 170751
TOTAL SITE AREA: 5018m²
R HAY
DRIVE
REMOTE FUEL FILL POINT
A 16.09.15 BHL D.A. APPROVAL
revision date by description checked
Figured dimensions to be taken in preference to scale readings
PROJECT MANAGERS
|
DESIGNERS |
PLANNERS |
ENGINEERS |
Head office - 17 Dover Street
Albion QLD 4010 Australia
EUMUNDI NOOSA ROAD Email: [email protected]
Ph. 61 7 3854 2900
Fax. 61 7 3854 2999
13.7
8.3 Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
This document may not be copied, reproduced, retained or disclosed to any unauthorised
person, either wholly or in part, without prior consent in writing from Tam Faragher &
Associates.
ACN 054 486 743
project
Max 72° Horiz
6.6
Max 6° Vert
PROPOSED SERVICE STATION for SYNERGY
1.6 4.7 1.4
8.1 1.4 1.4 1.5 PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
AV - Articulated Vehicle WALTER HAY DRIVE) NOOSAVILLE, QLD
Overall Length 19.000m
Overall Width 2.500m title
Overall Body Height 4.301m TANKER TURNING PATH
Min Body Ground Clearance 0.418m
Track Width 2.500m
Lock to Lock Time 6.00s
Curb to Curb Turning Radius 12.500m
drawn approved date created scale
BHL ROB SEP 2015 1 : 400
status drawing no. rev.
D.A. ISSUE 15193 D12 A
Page 21
APPENDIX C Swept Path Diagrams Heavy Rigid Vehicle
Page 22
23/09/2015 1:41:02 PM
N
4 0 5 10 15 20m
Metres
WALTE
RPD
LOT 30 on SP 170751
TOTAL SITE AREA: 5018m²
R HAY
DRIVE
SERVICE YARD
A 16.09.15 BHL D.A. APPROVAL
revision date by description checked
Figured dimensions to be taken in preference to scale readings
PROJECT MANAGERS
|
DESIGNERS |
PLANNERS |
ENGINEERS |
EUMUNDI NOOSA ROAD Head office - 17 Dover Street
Albion QLD 4010 Australia
Email: [email protected]
Ph. 61 7 3854 2900
Fax. 61 7 3854 2999
12.5 Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
This document may not be copied, reproduced, retained or disclosed to any unauthorised
person, either wholly or in part, without prior consent in writing from Tam Faragher &
Associates.
ACN 054 486 743
project
2.4 5.9 1.4
PROPOSED SERVICE STATION for SYNERGY
HRV - Heavy Rigid Vehicle
PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
Overall Length 12.500m WALTER HAY DRIVE) NOOSAVILLE, QLD
Overall Width 2.500m
Overall Body Height 4.300m title
Min Body Ground Clearance 0.417m
Track Width 2.500m HRV TURNING PATH
Lock to Lock Time 6.00s
Curb to Curb Turning Radius 12.500m
drawn approved date created scale
BHL ROB SEP 2015 1 : 400
status drawing no. rev.
D.A. ISSUE 15193 D11 A