Original source · versioned page text
Appendix D - Traffic Impact Assessment
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
23/09/2015 1:40:47 PM
PARKING SCHEDULE LEASE SCHEDULE
DISABLED (5.4m x 2.4m) 1 PETROL SITE 2444m² N
-with 5.4m x 2.4m shared bay between VACANT LAND 2574m²
STANDARD (5.4m x 2.6m) 9 (ACCESS EASEMENT 467m²) 4 0 5 10 15 20m
MOTORCYCLE (3.0m x 1.5m) 2
TOTAL 5018m²
Metres
PETROL SITE COVERAGE
LANDSCAPING 739m² 30.2% D04 RPD
BUILDING 254m² 10.4%
CANOPY 319m² 13.1% LOT 30 on SP 170751
7000
PAVEMENT 1132m² 46.3% 1 LAND TOTAL SITE AREA: 5018m²
SCAP
TOTAL LEASE AREA 2444m² 100% ING
WALTE
10000
ENT
BUILDING AREAS EASEM
R HAY
SERVICE STATION 194.7m²
REFUSE & SERVICES YARD 56.2m²
TOTAL 253.6m²
ING
DRIVE
LOAD
10
FUEL STORAGE D04
2
UNLEADED 91 60,000L 6
UNLEADED 95 30,000L VACANT LAND 5
7500
UNLEADED 98 30,000L
DIESEL 60,000L 3750
TOTAL FUEL STORAGE 180,000L 3500 1
REMOTE FUEL M1 M2
FILL POINTS 9200
AIR & WATER
7200
** FUEL TYPES ARE INDICATIVE ONLY & UNDERGROUND STORMWATER 3500
1000
MAY BE SUBJECT TO CHANGE DURING DETENTION TANK WITH 4
DETAIL DESIGN STAGE. TOTAL FUEL FILTRATION SYSTEM TO COMPLY D04
STORAGE WILL NOT EXCEED 500,000L WITH DIVISION 20 WATER
SENSITIVE DESIGN CODE
(INDICATIVE ONLY)
THE SITE WILL BE PROVISIONED WITH
S
ALL NECESSARY UNDERGROUND PIPE
TANK
30
WORK FOR VR2 00
AGE
10
13
STOR
5
GENERAL NOTES
UEL
ACCESS
U/G F
EASEMENT FUEL VENTS
CARPARKING AND ROAD AISLES TO BE IN
ACCORDANCE WITH AS2890.1 & AS2890.6.
CARPARKING AREAS TO BE MIN. 5.4m(L) x 2.6m(W)
A 16.09.15 BHL D.A. APPROVAL
FOR STANDARD PARKS & MIN. 5.4m(L) x 2.4m(W) revision date by description checked
8400
FOR DISABLED PARKS.
DIRECTIONAL SIGN LANDSCAPING Figured dimensions to be taken in preference to scale readings
PROJECT MANAGERS
|
DESIGNERS |
ENTRY EXIT PLANNERS |
ENGINEERS |
PED. REFUGE DIRECTIONAL PRIME SIGN Head office - 17 Dover Street
PP Albion QLD 4010 Australia
SIGN Email: [email protected]
PP Ph. 61 7 3854 2900
COLOURS & SELECTED BUILDING Fax. 61 7 3854 2999
MATERIALS SHOWN ARE INDICATIVE & MAY 3 Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
BE SUBJECT TO VARIATIONS DURING C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
FINAL DETAIL DOCUMENTATION This document may not be copied, reproduced, retained or disclosed to any unauthorised
EUMUNDI NOOSA ROAD D04
project
person, either wholly or in part, without prior consent in writing from Tam Faragher &
Associates.
ACN 054 486 743
PROPOSED SERVICE STATION for SYNERGY
ALL SIGNAGE SHOWN FOR INDICATIVE
PURPOSES ONLY AND SUBJECT TO THE PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
APPROVAL OF A SEPARATE OPERATIONAL WALTER HAY DRIVE) NOOSAVILLE, QLD
WORKS PERMIT (WHERE REQUIRED)
title
PROPOSED SITE LAYOUT
drawn approved date created scale
BHL ROB SEP 2015 1 : 400
status drawing no. rev.
D.A. ISSUE 15193 D02 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.