Original source · versioned page text
Appendix D - Traffic Impact Assessment
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
23/09/2015 1:40:54 PM
RPD
LOT 30 on SP 170751
TOTAL SITE AREA: 5018m²
COLOURS & SELECTED BUILDING
MATERIALS SHOWN ARE INDICATIVE & MAY
BE SUBJECT TO VARIATIONS DURING
FINAL DETAIL DOCUMENTATION
ALL SIGNAGE SHOWN FOR INDICATIVE
PURPOSES ONLY AND SUBJECT TO THE
APPROVAL OF A SEPARATE OPERATIONAL
WORKS PERMIT (WHERE REQUIRED)
A 16.09.15 BHL D.A. APPROVAL
revision date by description checked
Figured dimensions to be taken in preference to scale readings
PROJECT MANAGERS
|
DESIGNERS |
PLANNERS |
ENGINEERS |
Head office - 17 Dover Street
Albion QLD 4010 Australia
Email: [email protected]
Ph. 61 7 3854 2900
Fax. 61 7 3854 2999
Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
This document may not be copied, reproduced, retained or disclosed to any unauthorised
person, either wholly or in part, without prior consent in writing from Tam Faragher &
Associates.
ACN 054 486 743
project
PROPOSED SERVICE STATION for SYNERGY
PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
WALTER HAY DRIVE) NOOSAVILLE, QLD
title
PERSPECTIVES
drawn approved date created scale
BHL ROB SEP 2015
status drawing no. rev.
D.A. ISSUE 15193 D05 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.