Skip to the record
Search everything, all in one place.

Council archive · source document

SPA Decision Notice - 010.2010.00000100.001 [As Published] · MCU11/0053

of 12

Text shows just the words. Original shows the document exactly as it was published.

                                                                                        2010/100




Car Parking
20.   Carparking shall be provided within the site generally as shown on drawing titled Sheet 1 of 5
      drawn by Eco Cottages dated 8 July 2010, except as modified herein.
21.   The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
      for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and
      with a minimum head clearance (headroom) at any point of 2.2m.
22.   The proposed reversing bay shall be clearly marked/signposted to indicate the area is a
      “Turning Area Only” and that “No Parking is Permitted”.
23.   All carparking shall be kept and maintained in a condition fit for use.
Frontage Works
24.   Kerb and Channel shall be constructed along the entire School Street frontage of Lot 12
      RP35096. The kerb and channel shall be designed and constructed in accordance with
      Council’s Planning Scheme Policy PSP5 Engineering Design Standards – Roads, Drainage
      and Earthworks and to an alignment to be advised by Council at the time of construction. All
      associated and ancillary work including pavement correction to the existing pavement,
      drainage works, modification of the footpath, and adjustments to the existing infrastructure
      shall be undertaken to complete the works.
      In this regard specifications and plans detailing this work shall be prepared and submitted to
      Council for approval prior to obtaining a Development Permit for Operational Works.
      OR
      In lieu of providing the kerb and channel along the School Street frontage of the site in
      accordance with Council’s design standards, the applicant shall pay a monetary contribution of
      $890 (equivalent to the full cost of providing this infrastructure, including design costs). This
      amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from
      March 2010 until the date of payment. The contribution shall be paid to Council prior to
      obtaining a Development Permit for Operational Works.
25.   A new 1.5m wide concrete path shall be constructed along the entire School Street frontage of
      Lot 12 RP35096. The path shall be designed and constructed in accordance with Council’s
      Planning Scheme Policy PSP5 Engineering Design Standards – Roads, Drainage and
      Earthworks and to an alignment that protects any significant vegetation or any underground
      services.
      OR
      In lieu of providing a 1.5m wide concrete path along the School Street frontage of the site in
      accordance with Council’s design standards, the applicant shall pay a monetary contribution of
      $2,311 (equivalent to the full cost of providing this infrastructure, including design costs
      calculated at $135 per linear metre). This amount will be subject to variations in the
      Consumer Price Index, All Groups Brisbane from March 2010 until the date of payment. The
      contribution shall be paid to Council prior to obtaining a Development permit for Operational
      Works
26.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the
      School Street frontage of the site in accordance with Planning Scheme Policy PSP03
      Landscaping Plants & Guidelines. Grass shall be couch, free of weeds.
27.   All paths, driveways and parking areas shall be designed and constructed to ensure
      pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to
      be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1
      Design for Access & Mobility.
28.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
      footpath paving and landscaping such as trees and grasses in accordance with Council’s
      Standard specifications prior to commencement of the use permitted by this permit.

                                                                                     Page 5 of 12

Used in these records

About this file

File size
79 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SPA Decision Notice - 010.2010.00000100.001 [As Published].pdf · 79 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.