Original source · versioned page text
2016-09-06 - Planning & Environment Committee Agenda
The original of this document is very large (23.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
AGENDA
Planning & Environment
Committee Meeting
Tuesday, 6 September 2016
commencing at 9.30am
Committee Room, 9 Pelican Street, Tewantin
Committee: Crs Joe Jurisevic (Chair), Ingrid Jackson, Brian Stockwell, Tony Wellington
“Engagement with our community to protect and enhance our lifestyle”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 77 (of 118)
Section 2
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
TABLE OF CONTENTS
ITEM PAGE
ATTENDANCE & APOLOGIES -
PRESENTATIONS -
REPORTS FOR CONSIDERATION OF THE COMMITTEE 3
1 MCU15/0109 - DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF
USE FOR MULTIPLE HOUSING - TYPE 4 CONVENTIONAL (44 UNITS) AT
RESORT DRIVE, NOOSA HEADS 3
2 REC16/0015 - APPLICATION FOR A DEVELOPMENT APPROVAL FOR A
RECONFIGURATION OF A LOT (1 LOT INTO 2 LOTS AND ACCESS EASEMENT)
SITUATED AT 2 DAVID LOW WAY, CASTAWAYS BEACH 36
3 OPW16/0016 - APPLICATION FOR DEVELOPMENT PERMIT FOR
OPERATIONAL WORKS - PRESCRIBED TIDAL WORKS (DECK) 51
4 132003.221152.5 CHANGE TO AN EXISTING APPROVAL FOR MATERIAL
CHANGE OF USE FOR A DWELLING TO INCLUDE AN UNROOFED DECK AND
RETAINING WALL ADDITIONS AT 12 PARK ROAD, NOOSA HEADS 58
5 PROPOSAL TO PREPARE A NEW PLANNING SCHEME 70
6 NOOSA PARKLANDS PARK MANAGEMENT PLAN 86
7 GREEN PAPER ON FISHERIES MANAGEMENT REFORM IN QUEENSLAND 108
CLOSED SESSION -
Page 2 of 118
Section 3
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
REPORTS FOR CONSIDERATION OF THE COMMITTEE
1 MCU15/0109 - DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE
FOR MULTIPLE HOUSING - TYPE 4 CONVENTIONAL (44 UNITS) AT RESORT DRIVE,
NOOSA HEADS
DOCUMENT INFORM AT ION
Author Coordinator Planning, Denis Wallace
Planning & Infrastructure Department
Index ECM/ Application/ MCU15/0109
Attachments 1. Proposal Plans (23 page A3 sized attachment provided separately to this report;
2 hard copies available in the Councillors’ room)
APPLICATION DETAILS
Applicant Altum Constructions
Proposal Development Permit for Material Change of Use of Premises -
Multiple housing Type 4 - Conventional (44 units)
Properly Made Date 23 November 2015
Information Request Date 21 December 2015
Information Response Date 04 May 2016
Decision Due Date 15 September 2016 (Extended by Agreement)
Number of Submissions 3
PROPERTY DETAILS
Property Address Resort Drive, Noosa Heads
RP Description Lot 6 SP 178340
Land Area 11,800m2
Existing Use of Land Vacant
STATUTORY DETAILS
SEQRP Designation Urban Footprint
Locality Noosa Heads
Zone Semi-Attached Housing
Overlays Environmental Enhancement Area
Bushfire Hazard Area
Landslide Hazard Area
Low Potential Acid Sulphate Soils
Assessment Type Impact
Page 3 of 118
Section 4
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Environment
Committee Meeting dated 6 September 2016 regarding Application No. MCU15/0109 for a
Development Permit for a Material Change of Use for Multiple housing Type 4 - Conventional (44
units) situated at Resort Drive, Noosa Heads and:
A. Approve the application in accordance with the following conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the
use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table, and may be further amended by the conditions of this approval.
Plan No. Rev. Plan/Document Name Date
DA01 06 LOCATION PLAN & PROJECT SUMMARY by 14/7/16
Blackburne Jackson Design
DA02 10 SITE PLAN by Blackburne Jackson Design 14/7/16
DA03 11 SITE PLAN by Blackburne Jackson Design 14/7/16
DA04 05 SITE PLAN by Blackburne Jackson Design 14/7/16
DA05 05 SITE SECTIONS by Blackburne Jackson Design 14/7/16
DA06 05 BUILDING A: PLANS ELEVS & SECTION by 14/7/16
Blackburne Jackson Design
DA07 05 BUILDING B: : PLANS by Blackburne Jackson Design 14/7/16
DA08 05 BUILDING B: ELEVATIONS & SECTION by Blackburne 14/7/16
Jackson Design
DA09 05 BUILDING C: PLANS 14/7/16
DA10 05 BUILDING C: ELEVATIONS & SECTION by Blackburne 14/7/16
Jackson Design
DA11 06 BUILDING D: BASEMENT by Blackburne Jackson 14/7/16
Design
DA12 06 BUILDING D: LEVELS 1 & 2 14/7/16
DA13 05 BUILDING D: ELEVATIONS & SECTION by Blackburne 14/7/16
Jackson Design
DA14 05 BUILDING E: BASEMENT by Blackburne Jackson 14/7/16
Design
DA15 05 BUILDING E: LEVEL 1 by Blackburne Jackson Design 14/7/16
DA16 05 BUILDING E: LEVEL 2 by Blackburne Jackson Design 14/7/16
DA17 05 BUILDING E: ELEVATIONS by Blackburne Jackson 14/7/16
Design
DA18 05 BUILDING E: SECTION by Blackburne Jackson Design 14/7/16
DA19 06 BUILDING F & G: BASEMENT by Blackburne Jackson 14/7/16
Design
Page 4 of 118
Section 5
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
DA20 05 BUILDING F & G: LEVEL 1 by Blackburne Jackson 14/7/16
Design
DA21 05 BUILDING F & G: LEVEL 2 by Blackburne Jackson 14/7/16
Design
DA22 05 BUILDING F: ELEVATIONS by Blackburne Jackson 14/7/16
Design
DA23 05 BUILDING F: ELEVATION & SECTIONS by Blackburne 14/7/16
Jackson Design
DA24 05 BUILDING G: ELEVATIONS by Blackburne Jackson 14/7/16
Design
DA25 05 BUILDING G: ELEVATIONS & SECTION by Blackburne 14/7/16
Jackson Design
DA26 02 FINISHES PALETTE & SCHEDULE by Blackburne 14/7/16
Jackson Design
DA28 02 FIRE & EVACUATION MANAGEMENT PLAN by 14/7/16
Blackburne Jackson Design
DA30 02 HEIGHT PLANE PROJECTIONS by Blackburne 14/7/16
Jackson Design
DA31 02 HEIGHT PLANE PROJECTIONS by Blackburne 14/7/16
Jackson Design
DA101 05 LANDSCAPING LOWER POOL prepared by Blackburne 14/7/16
Jackson Design
DA102 05 LANDSCAPING UPPER POOL prepared by Blackburne 14/7/16
Jackson Design
DA103 05 BUILDING D LANDSCAPING prepared by Blackburne 14/7/16
Jackson Design
DA104 05 BUILDING E LANDSCAPING prepared by Blackburne 14/7/16
Jackson Design
DA105 05 BUILDING G & F LANDSCAPING prepared by 14/7/16
Blackburne Jackson Design
DA106 05 BUILDING F & CORNER LANDSCAPING prepared by 14/7/16
Blackburne Jackson Design
DA107 05 PLANT SPECIES PALETTE & HARDSCAPE 14/7/16
MATERIALS prepared by Blackburne Jackson Design
15128/SK10 A2 Concept Siteworks and Drainage Layout Plan, prepared 19/04/16
by Morgan Consulting Engineers
15128/SK11 A2 Concept Siteworks and Drainage Layout Plan –Sheet 1, 19/04/16
prepared by Morgan Consulting Engineers
15128/SK12 A2 Concept Siteworks and Drainage Layout Plan – Sheet 2, 19/04/16
prepared by Morgan Consulting Engineers
15128/SK13 A2 Concept Road 1 Longitudinal Section, prepared by 19/04/16
Morgan Consulting Engineers
15128/SK14 A2 Concept Road 2 Longitudinal Section, prepared by 19/04/16
Morgan Consulting Engineers
Page 5 of 118
Section 6
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Nature and Extent of Approved Use
3. The approved development comprises 4 x 1 bedroom, 22 x 2 bedroom and 18 x 3+
bedroom units, subject to compliance with the further requirements of Condition 4.
4. Prior to the issue of a development permit for Operational Works associated with this
approval, amended plans shall be submitted demonstrating compliance with The
Noosa Plan’s limits for population density and gross floor area by reducing those
aspects by a minimum of 1 person and 38m2 respectively.
Building Height
5. The maximum height of the development must not exceed the reduced levels shown
on the approved plans.
6. Certification must be submitted to Council from a Licensed Surveyor confirming the
constructed buildings do not exceed the maximum height requirement of this
Decision Notice.
Performance Bond
7. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the site pre-start meeting. The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs incurred
by Council in respect of enforcing performance of this permit. Council reserves the
right to call upon the bond or guaranteed sum to effect compliance with conditions.
Street Identification
8. The street address of the development must be clearly visible and discernible from
the primary frontage of the site by the provision of a street number and, where
appropriate, the building name.
Water & Sewer Connections
9. An underground connection to reticulated water and sewerage must be provided to
the development site in accordance with the standards and requirements of Northern
SEQ Distributor–Retailer Authority (Unitywater).
10. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
Building Appearance
11. All air conditioning units or other mechanical equipment must be fully enclosed or
screened such that they are not visible from the street frontages or adjoining
properties.
12. All deck and balcony areas above ground floor must not be enclosed by permanent
fixtures such as shutters, louvers, glass panelling or the like.
13. External colours and finishes of the building must comprise of muted environmental
tones that blend with the natural environment, as indicated on approved plan DA26
“Finishes Palette / Schedule” by Blackburne Jackson Design. Broad areas of light
coloured walls (which appear white) shown on building elevations to Buildings D, E, F
& G on the approved plans are not approved.
Page 6 of 118
Section 7
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Fencing
14. Any new boundary fencing must be constructed to allow for the movement of fauna.
Such fencing must:
a. allow adequate clearance at ground level for local macropods
b. not include use of barbed wire or similar materials
c. provide regular opportunities for passage over and through for fauna
Storage
15. Each dwelling unit must be provided with an allocated secure storage area(s) within
the basement carpark.
Outdoor Lighting Devices
16. Lighting associated with the use must be designed, sited, installed and tested to
comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the
obtrusive effects of outdoor lighting” using a control level of 1.
17. Certification must be submitted to council from a suitably qualified person* prior to
commissioning the operation of the development which certifies that all outdoor
lighting devices comply with AS4282-1997 and the requirements of this Decision
Notice.
Community Management Statement
18. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the Building
Format Plan (or similar) to Council for compliance assessment.
19. All clauses and by-laws of the proposed Community Management Statement must
accord with the requirements of this Decision Notice.
Landscaping Works
20. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and Planning Scheme Policy 3
Landscaping Plants and Guidelines and must include in particular:
a. the works shown on the Approved Plans
b. the use of large tree species to provide visual screening of the bulk of the
buildings.
c. compliance with the approved bushfire management plan for the development.
d. vegetated screening of any electrical transformers, bin storage areas, and the
like, from the road frontage and the southern pathway.
e. retention of the existing vegetation along the Resort Drive road reserve
frontage.
f. the provision of street furniture, specifically a public bench situated
approximately half way up the path in the southern road reserve.
g. control of all weeds species listed in the following standards and legislation:
declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003.
Undesirable species as listed in Planning Scheme Policy 3 Landscaping
Plants and Guidelines
Page 7 of 118
Section 8
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
21. All entry statements, fences, batters, retaining walls and buffer/screen plantings must
be located entirely within private land and not within the public road reserve.
22. The existing vegetation along the Resort Drive frontage road reserve, eastern road
reserve and located outside of the 6m zone in the southern road reserve must be
retained in accordance with an Arborist Report prepared by a qualified person* and
endorsed through an Operational Works approval.*(Refer to Advisory Note)
Fauna Management
23. Vegetation must only be removed or disturbed in accordance with a Fauna
Management Plan prepared by a qualified person* and endorsed through an
Operational Works approval.
*(Refer to Advisory Note)
24. Any domestic cats kept on the property must be permanently confined within
buildings and/or cat enclosures for the purpose of protecting proximate wildlife. All
and successive community management statements must include a provision to
enable the enforcement of this requirement.
Bushfire Management
25. The development must be carried out in accordance with section 7.0 of the Bushfire
Hazard Assessment and Management Plan (document ref. AA1345BFIRE Rev.3)
dated prepared by Duke Environmental listed within this Decision Notice.
26. A copy of the Bushfire Hazard Assessment and Management Plan listed within this
Decision Notice must be provided to the nearest fire authority.
27. Certification must be submitted to Council from a qualified person* which certifies that
the development has been constructed in accordance with the bushfire management
conditions of this Decision Notice, prior to the commencement of use. *(Refer to
Advisory Note)
ENGINEERING
External Works
28. External works, pathways, must be provided in accordance with an Operational
Works approval, unless already constructed, and must include in particular:
a. A new 2.0 metre wide concrete pathway must be constructed along the full
length of the eastern boundary lines for Lot 6 SP178340 (this property) and Lot
3 SP 221524 (the adjoining site) generally within the created pathway reserve
and to alignment protects existing trees.
b. A new concrete pathway must be constructed within the unformed road reserve
south to the site. This pathway shall be constructed at meandering alignment
to negotiate the steepness of the terrain and the natural vegetation. This
pathway must connect to the pathway along the eastern boundary and connect
to the existing cul-de-sac end of Resort Drive, and shall be 2.0m wide and
reduced to a minimum width of 1.5 meter where necessary to protect existing
vegetation.
The pathways must be designed and constructed in accordance with relevant
standards and best engineering practice using method/s of construction that
minimising impact on natural flora and fauna and maintenance needs also ensuring
pedestrian safety.
This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
being non-trunk infrastructure.
Page 8 of 118
Section 9
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Site Access and Driveways
29. A sealed access driveway must be provided from the existing cul-de-sac of Resort
Drive to all parking and manoeuvring areas of the development generally in
accordance with approved plans and must be undertaken in compliance with an
Operational Works approval and include in particular:
a. Driveway crossover in accordance with IPWEAQ standard drawing RS-051.
b. Compliant grades within the road verge to match any existing or future
pathway.
c. The relocation or modification to any existing services affected by the driveway
construction.
d. Suitable safety or traffic control measures, including warning signage, to
improve driver awareness of pedestrians and enhance pedestrian and traffic
safety.
30. Two temporary cul-de-sac ends with a turning circle 9.0m in radius minimum must be
constructed at both of the termination ends of the proposed driveway. The turning
circles must be constructed of stable sealed surface, compacted gravel or an
approved material to allow for vehicles, particularly refuse collection trucks, to turn
around in forward gear. The works must include any required batters and/or retaining
walls and be undertaken in accordance with an Operational Works approval.
Car Parking
31. A minimum of 80 car parking spaces must be provided and marked on the site
generally in accordance with the approved plans. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. 15 visitor parking spaces within the total, which are clearly marked for that
purpose and accessible at all times for visitor use.
b. Crossfalls, gradients and vehicle headroom in accordance with Australian
Standard AS2890: Parking Facilities.
32. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and maneuvering and kept in a tidy and safe condition at all times.
33. All car and bicycle parking areas must be line marked in accordance with approved
plans, no dividing walls be constructed unless a further application for amendment is
approved by Council.
34. Directional signage must be provided to direct visitors and customers to building
blocks and the car parking spaces provided on site.
Service Vehicles
35. Service vehicle parking, manoeuvring and standing spaces must be provided on the
site. The works must be undertaken in accordance with an Operational Works
approval and must provide suitable parking locations for emergency service vehicles.
Internal Pedestrian Pathway
36. Internal pedestrian pathways networks must be provided for the development
generally in accordance with the approved plans. The works must be undertaken in
compliance with an Operational Works approval and include:
a. Footpath and steps 1.5m wide minimum of concrete or other approved
materials throughout the development taking into consideration accessibility for
people with disabilities.
b. Signage and lighting at strategic locations to direct people to building entries
and other facilities as may be required.
Page 9 of 118
Section 10
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Stormwater Drainage
37. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in compliance with a development
permit for operational works and must include in particular:
a. Stormwater collection and pipe system in accordance with the requirements of
latest Queensland Urban Drainage Manual (QUDM) and related guidelines.
b. Stormwater retention and/or detention systems must be provided within the
property to ensure all stormwater runoffs from the site are maintained to its
predevelopment rates for all storm events up and including 1% AEP.
Electricity and Telecommunication Services
38. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
39. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements
40. Prior to issue any Development Permit for Operation works the applicant must
provide confirmation of a registered access easement has been created over the
adjoining site, Lot 3 SP221524, to accommodate the proposed temporary turning
circles of 9.0 metre in radius and 4.0 metre wide road shoulder for batter and
retaining works generally in accordance the approved plans.
41. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property. All easements must be designed in
accordance with the planning scheme and granted at no cost to the Grantee. Where
the Grantee is Council or a service authority, the easement documentation must be in
accordance with the Grantee’s standard easement terms.
42. Draft easement documentation must be submitted to Council for endorsement.
43. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
44. All excavation and fill and associated batters and retaining works must be undertaken
in accordance with an Operational Works approval and contained entirely within the
subject site unless written permission from the respective landowner(s) is provided to
Council.
45. All works must be carried out in accordance with a site-specific geotechnical
investigation report prepared by a qualified person* and submitted for endorsement
by Council as part of the Development Application for Operational Works. The
geotechnical investigation must be undertaken in accordance with the relevant
provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential
Development and address all stability issues concerning the development site.
*(Refer to Advisory Note)
Page 10 of 118
Section 11
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Acid Sulfate Soils
46. Where excavations of non-imported soils below the elevation of 5m AHD are
necessary for construction, the application for Operational Works for Bulk
Earthworks, Stormwater and /or Landscaping must demonstrate and include
certification from a suitably experienced and qualified geotechnical engineer of
methods necessary to ensure construction and operation of the development:
a. is consistent with Queensland Acid Sulfate Soil Technical Manual: Soil
Management Guidelines; and
b. will not result in the release of acid or associated metals; and
c. will not cause localised lowering of groundwater.
Erosion and Sediment Control
47. Prior to the completion of the development, all site surfaces must be effectively
stabilised. For the purpose of this condition, an effectively stabilised surface is
defined as one that does not, or is not likely to result in visible evidence of soil loss
caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water
contamination.
WATER QUALITY
Noosa Springs Lake Management
48. The application for operational works approval must demonstrate, through water
balance calculations prepared by a hydraulic engineer, that the hydraulic residence
time of the Noosa Springs Lake System will not be reduced as a result of stormwater
management on the site.
49. Where stormwater runoff from the site will enter the Noosa Springs Lake System,
Quarterly monitoring of stormwaters directed from the development to the Noosa
Springs Lake System. Monitoring must be undertaken by a suitably qualified person
using NATA accredited methods for the following parameters.
Nitrite plus Nitrate as N (NOx)
Total Kjeldahl Nitrogen (TKN)
Total Nitrogen as N (TKN + NOx)
Total Nitrogen as N
Total Phosphorus as P
Reactive Phosphorus as P (Dissolved)
Reactive Phosphorus – Filtered
Water quality monitoring results must be retained in electronic form by the property
owner for a minimum of 5 years and must be made available to Noosa Council on
request. This monitoring must continue until notified by Noosa Council that it is no
longer needed.
50. During the first 5 years of operation, for a minimum of 5 rainfall events per year,
stormwater at the following locations and times must be collected and sampled for
Total Nitrogen, Total Phosphorous and Total Suspended Solids using NATA
accredited methods.:
50.1. The release point from Precinct E2 for all waters directed to the Noosa Springs
lake system.
50.2. At monitoring point W6 shown on Plan A – Water Quality Monitoring Locations
Noosa Springs by Jelliffe Environmental (Qld) Pty Ltd.
Page 11 of 118
Section 12
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
The time for collection of water samples for monitoring must be quantified by the
applicant’s hydraulic engineer within the Operational Works application for
stormwater. The time for water quality monitoring shall be a minimum of the time of
concentration for all waters from Precinct E2 destined for the Noosa Springs Lake
System to reach the release point from Precinct E2, and within a maximum of 24
hours of commencement of rainfall events that generate runoff from Precinct E2.
51. The 90th percentile concentrations of Total Nitrogen, Total Phosphorus and Total
Suspended Solids measured within runoff from Precinct E2 must not be higher than
the 90th percentile concentrations of those parameters measured within the receiving
Noosa Springs Lake System. The applicant must notify Noosa Council within 24
hours of becoming aware of non-compliance with this condition.
52. The application for Operational Works Approval must include:
52.1. A monitoring strategy prepared by a suitably qualified person to demonstrate
how the water monitoring obligations of this development approval will be met.
52.2. A stormwater infrastructure design that incorporates a facility suitable for
obtaining the water samples needed to fulfil the obligations of this development
approval;
Stormwater Quality Management
53. All stormwater runoff from hardstand and fertilised landscaped areas of the
development, including runoff destined for groundwater infiltration must be treated to
achieve pollution reduction targets to achieve an 80% reduction in Total Suspended
Solids, 60% reduction in Total Phosphorus and 45% reduction in Total Nitrogen
compared to an untreated scenario.
54. Where proprietary devices are proposed, maintenance must be in accordance with
the manufacturer’s specifications. For vegetated stormwater assets, maintenance
must be in accordance with the Water by Design Maintaining Vegetated Stormwater
Assets, Version 1 Manual (2009).
55. Material extracted from stormwater quality treatment devices during servicing and
cleaning is to be removed from the site and disposed of by either a licensed waste
removal contractor or by other lawful means
56. Prior to issue of Operational Works approval, a 10 year maintenance contract
including expected cost forecast, must be entered into for maintenance of any on site
water quality treatment device. Records of maintenance activities undertaken are to
be kept and made available to council officers upon request.
57. Ongoing maintenance of stormwater quality treatment devices in accordance with this
development approval must be detailed within any community management
statement applicable to operation of the development.
58. The Operational Works application for landscaping must demonstrate the
landscaping design incorporates locally endemic vegetation adapted to grow on the
sites indigenous soil, and requires no fertiliser or other external nutrient requirements
after the first 3 years of establishment
WASTE MANAGEMENT
Waste Storage
59. The development must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy 9, Waste Management, including an external
imperviously paved area correctly sized for all refuse and recycling containers and
suitably screened from public places and neighbouring properties.
Page 12 of 118
Section 13
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
60. The site must be provided with a bin wash area with a cold-water tap, hose and drain
outlet connected to sewer, via a bucket trap. The drain outlet is to be designed to
prevent storm water entry to the sewerage system which can be achieved by a
bunded area, with a nib wall height of 100mm maximum, enclosing a wash area of
700mm x 700mm minimum (max 0.7m²). Alternatively, the waste area can be roofed,
or another appropriate design approved by Council.
61. A Waste Management Plan (Operational) in accordance with Planning Scheme
Policy No. 9 Waste Management and Planning Scheme Policy 11, Waste
Management Plans* must be submitted for the day-to-day operation of the
development and approved by Council’s Waste and Environmental Health Section,
prior to issue of development permit for operational works.
The Plan must include the following information: -
a. types of wastes that will be generated from the activities approved within the
development.
b. estimated volumes or tonnage of both recyclables and waste generated.
c. methods to be used for dealing with garden waste.
d. initiatives to minimize waste either by waste prevention, reduction, re-use or
recycling.
e. description of procedures for getting all waste to the bins; the storage of bins
and the collection of bins by the contractor.
f. description of the design details of waste storage and recycling areas including
size, location, elevation and floor plan, methods of bin washing and system to
prevent storm water getting into sewer via the bin wash.
g. description of types and volume of waste storage containers to be used.
h. waste and recycling storage area shall include the provision of containers for all
waste and recycling materials including putrescible matter, non-recycling waste,
paper/ cardboard, glass, aluminium/steel cans, waste oil, styrofoam boxes, etc,
and bin washing facilities connected to sewer.
i. detailed description of vehicular access routes to collect waste. Where
collection is off street, access must allow vehicles to enter and leave the site in
a forward direction.
ENVIRONMENTAL HEALTH
Noise
62. Written certification from a suitably qualified person must be submitted to Council
confirming that sound pressure levels from all mechanical plant and equipment
comply with the following :
Air-conditioning and Refrigeration:
7am to 10pm: Maximum level allowable = background + 5dB(A)
10pm to 7am: Maximum level allowable = background + 3dB(A)
Pumps:
7am to 7pm: Maximum level allowable = background + 5dB(A)
7pm to 10pm: Maximum level allowable = background + 3dB(A)
10pm to 7am: No audible noise.
Assessment and certification is required immediately after installation of the
equipment and prior to any occupation of the building. All equipment should be
operating at the same time to test the overall noise level created, with the
measurement location at either the residential boundary or outside the most exposed
part of an affected building - whichever is the closest to the plant/equipment.
Page 13 of 118
Section 14
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
The certification must be submitted to Council, which certifies that operational noise
from any fixed plant and equipment complies with the requirements of this Decision
Notice.
B. Authorise Council’s Chief Executive Officer to Execute the Voluntary Vegetation Offset
Agreement.
REPORT
1. PROPOSAL
The application seeks a development permit for a Material Change of Use for Multiple Housing –
Type 4 Conventional for 44 residential units on the site. The units are proposed within 7
freestanding buildings and include:
4 x 1 bedroom units
22 x 2 bedroom units
14 x 3 bedroom units
4 x 4 bedroom units
The buildings are concrete framed structures externally clad with a mix of FC sheeting,
weatherboard, colorbond cladding, rendered masonry and metal roofing. Architectural features
include skillion roofs, battened fc joints, aluminium screens and “picture frame” nib walls and
eaves. The skillion roofs extend over the main building elevations to provide eaves but side
elevations avoid eaves and provide window sunshades instead. Common facilities include a pool
and BBQ area adjacent to the site’s main entrance.
All buildings include 2 levels of residential units and most include a basement parking level. A
total of 80 resident car spaces and 15 visitor spaces are proposed. Building heights are
predominantly 2 storeys and 8 metres but the application seeks height relaxations for a number
of portions extending beyond those limits for the site.
Vehicle access is via a driveway off the cul-de-sac head on the site’s Resort Drive frontage, with
an internal road extending through the site to northeast and northwest corners of the lot and
extending into the neighbouring resort site, known as Precinct F on the Noosa Springs estate
masterplan. The applicant has an existing development approval for 155 dwellings over that site
and the current proposal presents as a residential extension to that site, being similar in built form
and layout.
Extensive earthworks will be required to construct retaining works, garden beds, roads and
pedestrian pathways for the development.
Extracts of the proposal plans are shown below and full plans are included as Attachment 1.
The application is before Council due to the scale of the development and a number of
assessment issues raised.
Page 14 of 118
Section 15
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 1 – Site Plan Extract
Figure 2 - Long-Section Plan Extract
Page 15 of 118
Section 16
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 3 – Elevations Plan Extracts
Page 16 of 118
Section 17
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 4 – Elevation Plan Extracts
2. SITE DETAILS
2.1. Background
The site is located within Precinct E2 of the Noosa Springs development at Links Drive, Noosa
Heads. Noosa Springs is a master planned residential golf estate, with most development on the
site completed. The subject site and the adjoining resort site to the north (Precinct F) have
remained undeveloped and were recently purchased by the applicant.
A development approval for Multiple Dwellings (31 Units) was previously issued over the site
(22848DA) in February 2003 but has since lapsed. An extract of the previously approved layout
plan is shown below.
Page 17 of 118
Section 18
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 5 – Previous Development Approval Layout
A pre-lodgement meeting was held with the applicant to discuss the current proposal on 17
September 2015. Issues discussed included built form, bushfire, vegetation, slope stability,
vehicle access and stormwater management.
2.2. Site Description
The site is a 1.18ha irregularly shaped allotment located on the western slopes of a high dune on
the eastern side of the Noosa Springs development. The lot has frontage to Resort Drive of
approximately 290 metres though resort drive ends at a cul-de-sac head halfway along the
frontage and the eastern half is unformed/vegetated. Part of the site was used as a sand quarry
in the past, with most of the quarry area located on the adjoining Precinct F site to the north. The
land falls from a ridgeline on the eastern boundary sloping down to the Resort Drive along the
western boundary. Most of the site slopes moderately to the southwest at around 15% but there
are very steep slopes on the excavated quarry batters near the northern property boundary.
Most of the site has been previously cleared of vegetation. Some scattered mature White
Cypress Pines (Callitris columellaris) and Brush box (Lophostemon confertus) are located near
the southern boundary and rear of the site. The road reserve to the south of the site contains
remnant vegetation with mature White Cypress Pines, Bloodwoods (Corymbia intermedia) and
Brush box, a shrub layer of Banksia, Alyxia, Acacia, Persoonia and a sparse ground of
Austromyrtus dulcis and Lomandra. There are occasional occurrences of weed species including
asparagus fern, umbrella trees and lantana, mainly along the forest edges.
Page 18 of 118
Section 19
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
The majority of the development site is mapped as containing “Non-remnant” vegetation and
does not contain any mapped regrowth vegetation, according to the Vegetation Management Act
1999. A minor portion of the site towards the south eastern ridge line, contains mapped remnant
vegetation (approximately an area of 300m2). The road reserve to the south (unformed) contains
remnant vegetation.
Aerial photographs of the site and its surrounds are shown in Figures 6 & 7 below and site
photographs in Figures 8, 9 & 10.
Figure 6 –Locality Plan
Page 19 of 118
Section 20
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 7 – Aerial Photograph of Site
Figure 8 – View East across the Site to Ridgeline at Rear
Page 20 of 118
Section 21
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 9 – View West across the Site to Lake Web
Figure 10 – View North Along Resort Drive Frontage
Page 21 of 118
Section 22
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
2.3. Surrounding Land Uses
The site is adjacent to Girraween Nature Reserve to the east, Noosa National Park to the south,
Noosa Springs Residential Precinct E1 to the west and Resort Precinct F to the North. Precinct
E1 has been developed for 42 multiple dwelling units and Precinct F has a current approval for
an integrated resort of 155 multiple dwellings. The Noosa Springs golf clubhouse, restaurant,
health spa and common facilities are approximately 200m to the northwest and the Noosa Heads
sewerage treatment plant is roughly 600m to the north of the site. Noosa Springs golf course is
west of the site and Lake Weyba is 400m to the southwest.
A 3 metre wide footpath reserve runs along the eastern boundary and is the subject of a current
Operational Works application to complete a new pathway required by the Council subdivision
approval that created the subject lot.
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each
statutory planning instrument relevant to the development, including:
State Planning Policies;
the South East Queensland Regional Plan;
State Planning Regulatory Provisions;
the Planning Scheme for the local government area; and
any Temporary Local Planning Instrument in place for the local government area.
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
State Planning Policies
The following State Planning Policies are applicable to this application:
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the urban footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
State Planning Regulatory Provisions
The following State Planning Regulatory Provisions apply to the application:
SEQ Regional Plan Regulatory Provisions
The proposal is for an urban activity within the Urban Footprint and is consistent with the SEQ
Regional Plan Regulatory Provisions.
3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Noosa Heads Locality and is zoned Semi-Attached Housing.
The Noosa Plan identifies the proposed use as consistent within the zone and requires an impact
assessable application process.
Page 22 of 118
Section 23
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
3.3.1. Locality Provisions
The Noosa Heads Locality Code seeks the following overall outcomes for development on the
site:
9.8.2 a) New uses and works are located, designed and managed to—
i be compatible with other uses and works;
ii maintain the safety of people and works;
iii avoid significant adverse impacts on the amenity enjoyed by users of other
premises, including acoustic and visual qualities; and
iv avoid significant adverse effects on the natural environment;
k) Areas of native remnant and regrowth vegetation, including their biodiversity and
habitat values are protected;
l) Land that has natural environmental values and cultural heritage values is protected
and maintained for future generations, including the following—
i Noosa National Park and Keyser Island and Weyba Creek conservation parks;
ii the vegetated hills which frame Noosa Heads, Laguna Bay, Noosa Inlet and
Hastings Street;
iii Noosa Spit and the beaches;
iv the foreshore areas of the Noosa River, Lake Weyba, Weyba Creek and their
associated riparian communities;
v the koala corridor between the various parts of the Noosa National Park and
vegetation stands around Lake Weyba;
vi the vegetated drainage lines through residential estates; and
vii private land with native vegetation communities;
o) For the Semi-Attached Housing Zone—residents are accommodated in detached
housing or semi-attached housing forms that—
i offer a high level of residential amenity, design quality and safety; and
ii respect the domestic scale of surrounding detached housing;
The development proposes a multiple dwelling use consistent with the planning intent of the
Noosa Springs Master Plan and The Noosa Plan. The previous multiple dwelling approval for the
site was for terracotta rooved, Mediterranean-style rendered masonry buildings of the style
broadly developed across the Noosa Springs estate. The current proposal updates the design to
a more contemporary building designs with greater mix of materials and more consistent with
Noosa’s design principles.
The development is as would be generally anticipated by existing Noosa Springs residents and is
of a similar scale and layout to the previous unit development approved over the site. The main
assessment issues arising from assessment against the locality plan relate to vegetation, habitat
and edge effects, and visual amenity. These are discussed in detail in the primary assessment
issues section of this report.
The Locality Code includes built form provisions for new development. The table below indicates
the development’s level of compliance with the applicable built form limits.
Page 23 of 118
Section 24
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Criteria Planning Scheme Proposal Complies
Site Area 11,800m²
Population density 118 persons max 119 persons X
(100persons/ha) (100.8persons/ha)
Gross floor area 4,720m² max 4,758m² X
(=max. population x 40m2)
Site cover 40% max 31%
Landscaped open space 4,720m2 5,937m²
> min 60% of total
> 60% of total
6m to frontage
Landscaping Setbacks 6m to Resort Drive
2m Internal Road and X
pool setbacks to
unformed road reserve
Building height
storeys 2 storeys max 3 storeys X
metres 8 metres 9.14 metres X
Boundary setbacks
Frontage 6 metres min 6 metres
Side 4 metres min 2.6 metres (north) X
Rear 8 metres min 12 metres
Max. Wall Length 15 metres 13 metres
Carparking 59 spaces 95 spaces
Roof Form 5 degree slope min 5 degree +skillion roof
600mm+ eaves to a min of Eaves to front and rear X
75% of perimeter elevations only (60% of
perimeter), with window
sunshades to side
elevations
Page 24 of 118
Section 25
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
The development involves a number of built form and density relaxations, discussed below.
Population Density & Gross Floor Area
The proposal exceeds the population density by 1 person (about 2 bedrooms or 1%).
Discussions with the applicant suggest it is a rounding error in its calculation. The gross floor
area limit has been based erroneously on that population density and also slightly exceeds the
limit. Condition 4 is recommended to address these issues.
Height in metres
The buildings largely comply with the site’s 8m height limit but portions of roofs on the downslope
side of the four buildings at the rear of the site are higher. The plan extracts below show the
extent of roofs above 8m shaded grey.
Figure 11 – Height Relaxation Plan Extract
Page 25 of 118
Section 26
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 12 – Height Envelope Plan Extract
The highest structure, Building G, is 9.14m above natural ground level. The heights are
predominantly due to the site’s slope and the relaxations sought are considered relatively minor.
The non-complying roof areas sit below the upper ridgelines at the rear of the skillion roofs. The
proposal plans indicate building heights will be less than 8m above finished ground levels, due to
retained garden beds at the front of the buildings. Given the isolated location of the buildings, the
minor height relaxations will not have a significant impact on visual amenity of the area, views of
the site from the west, or impact on existing residents in Resort Drive and are supported.
Building Height in Storeys
Most buildings include parking within a basement level. Due to the site slopes, the basements sit
well below natural ground level at the rear and project through that level at the front of the
buildings to the west – see indicative building cross sections below.
Figure 13 – Section through Buildings D & E
Page 26 of 118
Section 27
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
The Noosa Plan’s definition for a basement requires they protrude no more than 1m above
natural and finished ground levels. Front portions of the carpark levels therefore are not
basements and constitute a storey. Most of the proposed buildings therefore including some 3-
storey portions. The proposal plans show retained garden beds around these areas, so they are
less than 1m above finished ground level and will not be visually prominent. The non-complying
building height portions are predominantly a function of the site’s slope. Proposed garden bed
areas should adequately screen these portions, such that they will not present as 3-storeys. The
relaxation is supported, with conditions recommended to address landscaping.
Roof Form
The Locality Code seeks roofs with a minimum pitch of 5degrees and eaves to 75% of the
perimeter. The proposed skillion roofs are pitched at 6degrees+ but eaves are only provided to
the front and rear of the buildings, including deep verandah roofs, and equate to approximately
60% of the roof perimeter. Window sunshades are proposed to the side elevations in lieu of
eaves. The relaxation sought is supported because the primary building presentations provide
eaves and appropriate roof forms, and due to the isolated location, the non-complying side
elevations will not significantly impact on visual amenity. Notably, the previously approved
Noosa Springs architectural style was predominately Mediterranean-style villas without eaves.
The architecture proposed is generally consistent with the Noosa vernacular sought by the
Locality Code.
3.4. Land Use & Works Provisions
The following codes which regulate land use and design are most applicable to this application:
Residential Uses Code
Landscaping Code
Driveways & Carparking Code
Engineering Works Codes
The application has been assessed against each of the above applicable codes. The pertinent
issues arising out of the assessment against the codes are discussed below:
Code Discussion
Residential The development meets the provisions of the Code, providing suitable
Uses Code surveillance opportunities, pathway networks, open space and utility areas,
emergency vehicle routes, visitor parking and various built form requirements.
Conditions are recommended to address issues such as mechanical
equipment.
Landscaping The previous approval over the site required the provision of Glossy Black food
Code trees (Allocasuarina) and koala food trees in the provision of landscaping within
the site. With the consideration of contemporary knowledge regarding bushfire
hazards and risks, the predominant use of highly flammable species such as
Eucalypts and She-Oaks, in the landscaping plantings is not advisable. The
applicant’s bushfire report recommends eucalypts and other “flammable
species” be avoided. Landscaping with mainly local rainforest or wet sclerophyll
species will provide visual screening of the development and sufficient amenity
landscaping to the grounds. Conditions are recommended to ensure
landscaping meets the code intent, while also complying with the bushfire
management plan.
The landscaping code seeks to retain existing mature trees where practicable.
The site is predominantly cleared. Tree retention can occur along the frontage
to Resort Drive but clearing along the southern site boundary is recommended
for a number of reasons discussed in the primary issues later in this report.
Page 27 of 118
Section 28
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Code Discussion
Water Master planning for the Noosa Springs estate included the constructed lake
Sensitive system to treat water to the standard acceptable at the time of that approval.
Design Code That standard was for stormwater runoff to not worsen the water quality in Lake
Weyba. Provided the development is consistent with the master plan approval,
this proposed development will not affect the quality of Lake Weyba.
The approved masterplan design assumed waters from Precinct E2 would flow
to that lake system for treatment. Since the time of the master planning,
constructed lake systems are now known to have high risk of algal and
cyanobacterial outbreaks if not managed correctly. Management of
cyanobacterial outbreaks can be costly to the asset owner (for example Elysium
estate spent over $20,000 to remove a cyanobacteria outbreak from its lake
system). Given the constructed lakes are now in separate ownership to Precinct
E2, it is important that this development can demonstrate that it is unlikely to be
responsible for increasing the risk of any algal or cyanobacterial outbreak in the
receiving constructed lake. Factors that affect cyanobacterial or algal blooms in
constructed lakes are nutrient concentrations as well as appropriate
management of hydraulic residence times (flow through of water).
The applicant has provided an RPEQ certified Stormwater Management Plan
for Precinct E2, which also addresses Precinct F. The Stormwater
Management Plan proposes for runoff from Precinct E2 to enter the Noosa
Springs constructed lake untreated. Despite absence of treatment, the
Stormwater Management Plan suggests that stormwater runoff from Precinct
E2 is unlikely to increase algal and cyanobacterial risks in the receiving lake
system for the following reasons:
the modelled 90th %ile nutrient concentrations in stormwater runoff from
precinct E2 and Precinct F combined as well as E2 in isolation are less than
the measured 90th %ile nutrient concentrations measured over the previous
8 years.
the proposed development is unlikely to have a significant negative impact
on the hydraulic residence times of the lake.
Assessment against The Noosa Plan’s Water Sensitive Design Code and the
State Planning Policy is applicable.
By proposing no onsite treatment of stormwater quality, Precinct E2 would not
meet the following Specific Outcomes of the Water Sensitive Design Code of
the Noosa Plan:
O1 Development uses a combination of detention and retention systems to
capture run-off from areas on the site
O9 Natural treatment strategies, including grass swales and bio-retention
systems, vegetated filtration strips and gross pollutant traps, are used wherever
practicable
Additionally, the State Planning Policy requires stormwater polishing on
developments greater than 2500m2 with >25% impervious surface. The
polishing targets are 80% reduction in Total Suspended Solids, 60% reduction
in Total Phosphorous and 45% reduction in Total Nitrogen. The development
application for Precinct E2 has not demonstrated this outcome can be achieved.
In addition MUSIC modelling for the development assumes filtration of
stormwater to groundwater (instead of the constructed lake) will not contribute
any pollutants to the system.
Page 28 of 118
Section 29
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Code Discussion
There has been a history of high nitrogen within ground waters entering the
Lake Weyba catchment. This site is located on silica soils adjacent to Lake
Weyba. Due to their high permeability, silica soils are considered inadequate
for polishing of nutrients from this type of development prior to groundwater
recharge. Treatment for removal of nutrients from stormwaters from any
fertilised landscaped and hardstand areas prior to release from the site,
including via groundwater is necessary to meet the State Planning Policy and
Noosa Plan objectives.
Whilst not preferable due to maintenance costs, compliance checking
commitments, and negative water quality impacts if not maintained, it is
possible for Precinct E2 to incorporate a propitiatory water quality treatment
device to achieve the outcomes of the Noosa Plan and State Planning Policy
without affecting their development footprint.
Conditions are therefore recommended to facilitate approval, ensure the water
quality objectives can be met and ensure suitable information is obtained in the
event of any dispute between Noosa Springs and precinct E2 regarding
financial responsibilities for any water quality management issues within the
Noosa Springs Constructed Lake System.
Driveways The development includes car parking in excess of minimum planning scheme
and requirements. The internal road layout is relatively simple and legible.
Carparking Conditions are recommended addressing parking layout, visitor allocation,
Code waste management and easements over turning arrangements on the adjoining
site.
Engineering The development requires extensive earthworks and retaining structures.
Works Codes Conditions are recommended addressing geotechnical and design
requirements for an Operational Works application.
3.5. Overlay Provisions
The following overlay codes are applicable to this application:
Biodiversity Overlay Code
Natural Hazards Overlay Code
Assessment against these codes raises some significant assessment issues discussed below.
3.6. Primary Assessment Issues
Bushfire
The planning scheme identifies the site within a Medium Bushfire Hazard area. The Natural
Hazards Overlay Code seeks to ensure that new uses in bushfire hazard areas do not
compromise the safety of people or property from bushfire.
Assessment has been undertaken in accordance with the State Planning Policy provisions to
ensure the development is compliant with the current planning requirements for bushfire. The
associated hazard mapping identifies the site as containing Bushfire Hazard Areas with Very
High Potential Bushfire Intensity over the majority of the site with the rest of the site identified as
potential impact buffer to western portion and High Potential Bushfire Intensity to the east (see
Figure 14 below).
Page 29 of 118
Section 30
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 14 – State Bushfire Hazard Mapping Extract (SARA DA Mapping)
The main landscape features that contribute to the bushfire hazard ratings are vegetated lands
located to the east and south of the site. East of the site’s ridgeline is the Girraween Nature
Reserve which connects to Noosa National Park, bounded in the east by Ben Lexcen Drive.
South of the site is a large tract of Noosa National Park. These tracts of land, managed for
biodiversity values, influence the bushfire hazard rating.
The applicant provided a Bushfire Management Plan documenting the procedures and methods
to reduce the risk of bushfire attack on the development. Council engaged a bushfire consultant,
Friend & Associates, to review the bushfire management plan and their assessment has been
included in the development assessment.
The Bushfire Management Plan requires buildings to be setback 1.5 times the dominant height of
the hazardous vegetation. This requirement is met by siting the buildings 19.5 m from the
vegetation to the south and 15 metres from the vegetation to the east.
A 2 metre wide concrete pathway is required by the master plan for Noosa Springs to be
constructed in the road reserve that borders the southern boundary of the site. The construction
of this pathway in the road reserve will result in vegetation clearing. Previous advice from natural
land managers within Council has recommended buffers be provided to hazardous vegetation
situated on development lot boundaries. The pathway is recommended to be located along the
southern boundary of the site (see Figure 15 below) to achieve appropriate setbacks to
hazardous vegetation, being both flammable and from limb/tree fall. This also provides a benefit
of reducing the maintenance burden on Council resources, results in less clearing of remnant
vegetation and further reduces future conflicts between overgrowing vegetation and the
development.
Page 30 of 118
Section 31
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 15 – Site Plan Extract Showing Proposed Clear Zone and Pathway Location in Southern
Road Reserve
The location of the pathway concentrates the impacts on the vegetation along the forest edge,
rather than distributing the impacts throughout the road reserve. The pathway construction
activity, along with the ongoing use and maintenance requirements, is better positioned along the
edge of the forest rather than within the forest, in terms of ecosystem health and tree
management. The overall formation of the pathway will be 2m wide gravel shoulders and a 2m
wide concrete pathway.
While the development and pathway area is outside the mapped regulatory Koala Assessable
Development Area, the road reserve is mapped as containing koala habitat by the Noosa Koala
Conservation Plan. The applicant has agreed to enter into an Infrastructure Agreement to offset
the required clearing via a financial contribution. The value of $18,400 has been determined by
using the State Government’s environmental offsets calculator. The payment will be used to
implement the actions of the Noosa Koala Conservation Plan. The financial settlement is not
required by legislation but is provided to allow the construction of the pathway along the southern
boundary, which provides an additional overall 6m setback to the hazardous vegetation.
Page 31 of 118
Section 32
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
The Bushfire Management Plan is assessed as complying with the State Planning Policy 2014
and the Noosa Plan. The development provides the required setbacks to hazardous vegetation
and a suitable Emergency Response Plan has been prepared. The Emergency Response Plan
has been reviewed and endorsed by Queensland Fire and Emergency Services. Based on the
application material received, the development can be conditioned to ensure new uses in
bushfire hazard areas do not compromise the safety of people or property from bushfire.
Koala Habitat
The site is adjacent to mapped Koala habitat, being Girraween Nature Reserve and Noosa
National Park. The mapped Koala habitat consists of Regional Ecosystem 12.2.5 which is
described as Open forest to low closed forest. Species can include Corymbia intermedia,
Lophostemon confertus, Banksia integrifolia subsp. integrifolia, B. aemula, Callitris columellaris,
Acacia spp., Livistona spp. and Endiandra sieberi. Melaleuca quinquenervia in swales.
Understorey generally shrubby and can include vine forest species. Occurs on Quaternary
coastal dunes, beach ridges and sandy banks of coastal streams.
Residents have reported koalas moving and calling along Resort Drive, which borders the
western portion of the site. Planted trees (Eucalyptus propinqua) along the road verge provide
forage for koalas. Site investigation confirms these trees are used by koalas. Within the
proposed clearing footprint for the pathway 3 secondary koala food trees (Bloodwoods) will be
required to be removed. The removal of these trees is not likely to significantly impact on the
koala populations in the area. The financial contribution to implement the Noosa Koala
Conservation Plan, including the provision of koala habitat on adjacent lands will, in time, provide
substantially more koala habitat and is considered an acceptable outcome.
The main impacts on koalas and their habitat are considered to be initial construction activities,
clearing for pathway, the use of the development and increased human activities in the vicinity.
The Noosa Springs master plan designates the site for development and includes the provision
of pedestrian pathways in the road reserves to the east and south of the site. Advice from
Council’s Infrastructure Planning section requires the pathway to provide pedestrian access and
it is desirable to have a cleared access for bushland maintenance purposes. The east of the site
already has a cleared area suitable for a pathway, however, the south of the site will require
vegetation clearing to support a pathway. As stated previously, the advantages of providing a
pathway along the boundary of the site are the co-location of a bushfire buffer, reduced demand
on Council resources for on-going boundary vegetation maintenance, better access for
maintenance and reduced interference with vegetation due to the pathway location.
Statutory Koala Requirements
The koala is listed as a ‘Vulnerable’ species under the Commonwealth Environment Protection &
Biodiversity Conservation Act 1999 (EPBC Act). Development that has a significant impact on
koalas requires referral to the Australian Government Minister for the Environment. Under the
EPBC Koala Referral Guidelines impacts on ‘habitat critical to the survival of the species’ and
impacts that ‘substantially interfere with the recovery of the species’ are a ‘significant impact’.
Due to the limited clearing associated with the development, it is considered the development will
not have a significant impact on koalas and referral to the Australian Government is not required.
The development site and the southern pathway are located outside the State’s mapped Koala
Assessable Development Area and therefore the application is not subject to the provisions of
the South East Queensland Koala Conservation State Planning Regulatory Provisions.
The Noosa Plan maps Koala Habitat to the southern half road reserve to the south of the
development site. The proposed location of the 6m formation pathway is outside the mapped
Koala Habitat area and therefore the application is not subject to the koala provisions of the
Noosa Plan.
Page 32 of 118
Section 33
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Non-statutory Koala Requirements
The Noosa Koala Policy, adopted, in 2015, provides a structure and coordinated framework to
help conserve and protect koala populations within the Noosa Shire. The Policy states
development is to be assessed in accordance with statutory requirements and lead to the
formulation and adoption of Noosa’s Koala Conservation Plan.
The Noosa Koala Conservation Plan 2016 koala habitat mapping identifies road reserve to the
south of the site as containing koala habitat and designated the habitat “Remnant Habitat
Known”. The mapping is based on State mapping of Regional Ecosystem 12.2.5. This
ecosystem is strongly correlated with koala sightings. It is considered the removal of 3 food trees
and the required clearing of the pedestrian footpath will not significantly impact on koalas in the
area and the provision of a financial payment for koala habitat restoration will enhance koala
survival in the area and provide net benefit.
Proposed Vegetation Offset via an Infrastructure Agreement
As noted previously, the applicant has agreed to provide a vegetation offset contribution of
$18,400 secured through an Infrastructure Agreement with Council. An Agreement has been
signed by the applicant and is awaiting execution by Council. The offset contribution would be
directed to works that implement the Noosa Koala Conservation Plan, which include a
programme of koala habitat plantings in the adjacent Girraween Nature Refuge. This land is
managed by Council and has received previous financial contributions from developments to
restore and maintain koala habitat. Girraween Nature Refuge provides koala habitat areas and is
adjacent to Noosa National Park. It is recommended Council agree to the offset arrangement
and the Infrastructure Agreement be executed accordingly.
Visual & Scenic Amenity
The site is elevated, rising to around to around 35m AHD to the ridgeline at the rear, has western
aspects and is visible from parts of Noosaville, Weyba Creek, Lake Weyba and beyond. The
applicant was advised it is important the development incorporates finishes and landscaping to
ensure it blends with the natural hillside setting and make it visually unobtrusive. The submitted
architectural plans include a proposed a suitable colour palette, as shown below.
Figure 16 – Proposed Colour Palette Extract
However, areas of the front elevations of the higher buildings (D, E, F & G) appear to include
substantial areas of white. A condition is recommended to ensure the colours are muted
environmental tones consistent with the above palette and use of white is generally avoided. A
condition is also recommended to ensure outdoor lighting complies with the relevant Australian
Standard to avoid obtrusive light emissions.
Page 33 of 118
Section 34
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
4. CONSULTATION
4.1. IDAS Referral Agencies
Nil.
4.2. Other Referrals
The application was forwarded to the following internal Council specialists:
Senior Ecologist
Development Engineer
Environment Officer
Waste Management Officer
Their assessments form part of this report.
4.3. Public Notification
The application was publicly notified for 15 business days in accordance with the Sustainable
Planning Act 2009. 3 properly made submissions were received, with 2 objecting to the
development and 1 neutral. The following table provides a summary and assessment of the
issues raised.
Issues Comments
Concerned with the increased overall The development is consistent with the original
quantity of people to reside in Noosa adopted masterplan for Noosa Springs and the
Springs (holiday makers or residents) - ongoing provisions under The Noosa Plan.
particularly the capacity of Resort Drive to
cater for the additional construction and
ongoing traffic.
Impacts on road reserve from construction The developer is required to make good any
traffic. construction damage to public infrastructure.
Potential impacts on koalas from Resort Drive is a low speed environment and
construction traffic construction traffic to the site is not considered to
pose a significant risk to koalas.
Vegetation along Resort Drive should be Conditions are recommended to retain the trees
retained to buffer the development and for along the Resort Drive frontage.
food and refuge for koalas.
Vegetation is recommended for clearing to the
south to minimise edge effects, allow the co-
location of the pedestrian pathway and buffer from
bushfire risk to the south. The clearing in this area
is supported on the basis of an offset contribution
secured by an Infrastructure Agreement.
Koala trees on the site should be retained. The site is mostly cleared and does not contain
any primary koala food trees. Given the level of
bushfire risk on the site, retention or reinstatement
of flammable species is not supported. Three
secondary koala food trees (Bloodwoods) are
proposed to be removed along the southern
boundary, with the recommended offset
arrangement considered to provide a net
environmental benefit.
Page 34 of 118
Section 35
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
5. CONCLUSION
The proposed unit development is broadly consistent with the planning intent of master planning
undertaken for the Noosa Springs estate and The Noosa Plan’s ongoing provisions for the site.
The medium density dwelling precinct was established in a location subject to some major
constraints in the form of site slope, adjacent significant habitat and conservation lands, and
bushfire hazard. The primary assessment issues arise from those constraints.
Contemporary understanding of the bushfire risks means historic approaches to vegetation
retention and habitat reinstatement (of flammable native species) are not achievable on this site.
In addition, the lot’s interface with hazardous tree canopies along the southern boundary would
be likely to result in ongoing vegetation management issues with future residents and bodies
corporate if not appropriately addressed by this assessment. Given the requirement for a
connecting pathway in the unformed road reserve to the south, a 6m cleared corridor is proposed
along the property boundary to address the development interface and provide a no-fuel zone
incorporating the pathway. Vegetation removal will occur in this area but will be limited to three
secondary koala food tress (bloodwoods). It is considered a financial offset, proposed via a
voluntary infrastructure agreement, will deliver a net environmental benefit.
The proposed buildings require a number of height relaxations relaxation but these are
predominantly due to the site’s slope and are supportable. The development is otherwise able to
meet the provisions of The Noosa, subject to conditions, and is recommended for approval.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer to the Mayor & CEO Community Facilities Financial Services
Executive Support Community Development ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property & Facilities
X Waste & Environmental Health Revenue Services
Executive Office X Planning & Infrastructure
Community Engagement Building & Plumbing Services
Customer Service Civil Operations
Economic Development Infrastructure Planning & Design
Governance X Planning & Environment
Human Resources Strategic Land Use Planning
Sustainability
Page 35 of 118
Section 36
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
2 REC16/0015 - APPLICATION FOR A DEVELOPMENT APPROVAL FOR A
RECONFIGURATION OF A LOT (1 LOT INTO 2 LOTS AND ACCESS EASEMENT)
SITUATED AT 2 DAVID LOW WAY, CASTAWAYS BEACH
DOCUMENT INFORM AT ION
Author Development Planner, Wilhelm Koschade
Planning & Infrastructure Department
Index ECM / Application / REC16/0015
Attachments 1. Riparian Buffer Mapping
2. Bushfire Hazard Mapping
APPLICATION DETAILS
Applicant Kenlynn Pty Ltd
Proposal Development Permit to Reconfigure a Lot - 1 Lot into 2 Lots and Access
easement
Properly Made Date 13 June 2016
Information Request Date 8 July 2016
Information Response Date 25 July 2016
Decision Due Date 17 September 2016
Number of Submissions Not Applicable
PROPERTY DETAILS
Property Address 2 David Low Way Castaways Beach
RP Description Lot 71 MCH 2854
Land Area 9677m²
Existing Use of Land Duplex
STATUTORY DETAILS
SEQRP Designation Urban Footprint
Locality Eastern Beaches Locality
Zone Detached Housing Zone
Overlays Biodiversity Overlay:
Environmental Protection Area
Riparian Buffer Area)
Natural Resources Overlay:
Coastal Protection Area
Natural Hazards Overlay:
Acid Sulfate Soils
Slide Hazard
Bushfire Hazard
Assessment Type Code
Page 36 of 118
Section 37
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 6 September 2016 regarding Application No. REC16/0015 for a
Development Permit for Reconfiguring a Lot (1 lot into 2 lots and Access Easement) situated at 2
David Low Way, Castaways Beach and issue a Preliminary Approval in accordance with the
following conditions:
PLANNING
Preliminary Approval
1. Prior the issue of a Development Permit, the following documentation must be submitted to
Council for review and approval:
a. A site specific Bushfire Hazard Assessment prepared by a suitably qualified person
which either determines the site as a low bushfire risk or provides recommendations
of how bushfire risk can be managed. The hazard assessment must avoid
interference with vegetation in proposed covenant areas and must comply with The
Noosa Plan’s Natural Hazards Overlay Code.
b. An Effluent Disposal Report prepared by a suitably qualified person which provides
comment on the following:
i. The capacity of existing systems to operate as intended without causing
environmental harm; and
ii. Evidence existing systems operate wholly within the lot they intend to serve and
accord with proposed covenant areas.
When Conditions Must Be Complied With
2. Unless otherwise stated, all works required by the conditions of this permit must be
completed prior to submission of the subdivision plan to Council for compliance
assessment.
Approved Plans
3. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and
may be further amended by these conditions.
Plan No. Rev. Plan, prepared by Date
M2683E 01 B Reconfiguration Plan, prepared by JFOP 14/07/2016
Consultants
M2683E DR01 A Engineering Concept – Site Distance & 09/06/2016
Driveway Plan, prepared by JFOP Consultants
4. All lot numbering on the subdivision plan submitted to Council for compliance assessment
must remain as shown on the Approved Plans.
5. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting nuisance or other emissions.
Land Rehabilitation
6. The cleared land area of 750m2, south east of the southern residence, on public land must
be rehabilitated to restore the area to the local variant of Regional Ecosystem 12.2.14. The
works must be undertaken in accordance with an Operational Works approval.
Page 37 of 118
Section 38
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Vegetation Covenant
7. A vegetation protection covenant must be registered against the titles of the properties over
the area Vegetation Covenant on the Plan M2683-01B-RP.dwg pursuant to Section 97A of
the Land Title Act 1994. The covenant document and a survey plan must be submitted to
Council for endorsement prior to lodgement with the relevant titles authority for registration
of title. The covenant document must:
a. incorporate the requirements of this Decision Notice
b. include Noosa Council as Covenantee.
c. reference Queensland Land Title Registry Standard Terms Document No.
715597513
8. If a provision included in the covenant document is requisitioned or refused registration by
the relevant titles authority, a substitute provision must be included in the document which
as nearly as practicable addresses the objective sought by the requisitioned or refused
provision. The wording of the substitute provision must be agreed by Council.
ENGINEERING
Site Access and Driveways
9. A sealed access driveway must be provided from David Low Way to all lots. The works
must be undertaken in accordance with an Operational Works approval and be generally in
accordance with drawing number M2683E DR01 Revision A and must include in particular:
a. a driveway crossover generally in accordance with Council’s standard drawing
b. a driveway width of 5.5 metres extending from the edge of the road formation to the
property boundary
c. a passing opportunity (minimum 5.5 metres wide) between the front property
boundary and the access to Lot 2
d. a sealed driveway minimum 3.0 metres wide for the remainder of the access handle,
e. underground service conduits for all utility services.
f. the works (benching and clearing) required within the David Low Way road reserve to
construct a complying access
10. Vehicle access to Lots 1 & 2 is limited to the constructed driveway only. A clause must be
included in the contract of sale for Lots 1 & 2 which requires vehicle access to be from the
constructed driveway only, and which prohibits the driveway from being relocated without
Council agreement.
Stormwater Drainage
11. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Electricity and Telecommunication Services
12. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with an approval for Operational Works and the standards and requirements of
the relevant service provider.
13. Unless otherwise stipulated by telecommunications legislation at the time of construction,
the development must be provided with all necessary conduits, pits and pipes to
accommodate the future connection of optic fibre technology telecommunications.
14. Certification must be submitted to Council from all relevant service providers which certifies
that the development has met the requirements of this Decision Notice and all applicable
legislation at the time of construction.
Page 38 of 118
Section 39
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Water Connections
15. An underground connection to reticulated water must be provided to each lot in accordance
with the standards and requirements of Northern SEQ Distributor–Retailer Authority
(Unitywater).
16. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water has been provided to each lot.
Easements
17. An easement for access and services must be registered in favour of Lot 2 against the title
of Lot 1. The easement must extend for the full extent of the easement shown on the
approved plan.
18. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
19. All easements must be designed in accordance with the planning scheme and granted at
no cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
20. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Dedication
21. The applicant must dedicate as “Road” that part of the site along the David Low Way
frontage that is occupied by Council’s existing footpath. The alignment of the new boundary
must be a minimum of 500mm from the eastern side of the existing footpath with as few
bends as practicable.
Damage to Services and Assets
22. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
REPORT
1. PROPOSAL
The application seeks approval for a Reconfiguration of a Lot (1 lot into 2 lots) in order to create
an additional residential lot. The development will establish separate tenure for two existing
dwellings on the site. The application proposes a common driveway with an associated access
easement which provides both lots direct access to David Low Way. A large portion of proposed
lot 1 and 2 is to be designated as environmental covenant for environmental protection purposes.
The application also proposes to dedicate a portion of the site along the south-western boundary
to rectify an existing Council footpath encroachment.
Page 39 of 118
Section 40
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
The reconfiguration proposes lot sizes as follows:
Lot 1 – 5,737m2
Lot 2 – 3,940m2
A locality plan, registered plan extract and proposal plan is included below as Figure 1, 2 and 3.
Given the significance of the site in relation to location and natural features, this report has been
put forward to Council for decision.
Figure 1 – Locality Plan
Page 40 of 118
Section 41
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 2 – Registered Plan Extract
Page 41 of 118
Section 42
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 3 – Proposal Plan
2. SITE DETAILS
2.1. Background
A Town Planning Consent (TPC 2566) for a Duplex Dwelling was issued over the site on 22
December 1993.
A pre-lodgement took place on 17 February 2014 regarding the potential for a Reconfiguration of
a Lot (1 lot into 3 lots). Officers advised that new lot boundaries should not intersect significant
vegetation, vegetation retention is maximised and the overall visual amenity of the area and
beach front should be protected. It was further advised that the site is serviced by existing onsite
effluent disposal systems and any future subdivision beyond 2 lots would require a reticulated
sewerage connection. The existing standard of vehicle access would also require significant
improvement to achieve compliance with current standards (sufficient site lines etc).
A subsequent pre-lodgement took place on 15 December 2015 where Council officers
acknowledged the sites existing development rights for a duplex and reiterated that a subdivision
into 2 parcels may be supported. It was further advised that a subdivision beyond 2 lots would
require connection to the sewerage network and vegetation protection on the site is required.
Improvement works to the existing access were also discussed.
2.2. Site Description
The site has an area of 9,677m2 and a road frontage to David Low Way of approximately 254m.
There is an existing detached duplex on the site with driveways leading to both dwellings from a
common access to David Low Way.
The site ranges in elevation from 4m – 24m AHD and generally slopes down from the southern
property corner to the northern most dwelling. Further north, the site has a steep decline of
approximately 38% to the northern boundary which meets the Burgess Creek riparian area.
Dunal vegetation is located throughout the site and generally consists of Spinifex grassland,
Black Wattle, Coastal Sheoak, Acacia, Banksia, Pandanus, Carrotwood and Coastal Aspin. The
vegetation is wholly located within a riparian buffer area and is critical in maintaining the
ecological integrity of Burgess Creek. The vegetation is also important in maintaining soil and
coastal bank stability with the site having direct frontage to a coastal foreshore.
Page 42 of 118
Section 43
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
2.3. Surrounding Land Uses
The site abuts a 92.8ha reserve to the east (Castaways Beach Park) and Burgess Creek to the
north which are zoned Open Space Conservation. Adjoining the site to the west is David Low
Way and further south-west across the road reserve are detached dwellings off Driftwood Drive
and Caribbean Court.
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of the
following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy 2014;
the South East Queensland Regional Plan;
State Planning Regulatory Provisions;
any Structure Plan or Master Plan in place for declared areas;
any Preliminary Approval Overriding the Planning Scheme for the land;
the Planning Scheme for the local government area; and
Any Temporary Local Planning Instrument in place for the local government area.
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
State Planning Policy 2016
The site is located within a Coastal Hazard Area under the 2014 State Planning Policy mapping.
The Noosa Plan’s coastal hazard provisions do not appropriately reflect the State Planning Policy
2014 and therefore the proposed development requires assessment against the Interim
Development Assessment Provisions. The proposed development aligns with the provisions of
the State Planning Policy 2014.
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint area of the SEQ Regional Plan and is consistent
with the Plan’s regional policies and Regulatory Provisions.
3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Eastern Beaches Locality and is zoned Detached Housing. The
proposed development is identified as code assessable development within the zone and is
required to follow a code assessable application process, assessable against the following
codes:
Eastern Beaches Locality Code;
Reconfiguring a Lot Code;
Landscaping Works Code;
Engineering Works Codes;
Biodiversity Overlay Code (Environmental Protection & Riparian Buffer Area); and
Natural Hazard Overlay Code (Landslide Hazard & Bushfire Hazard).
The application has been assessed against each of the above applicable codes. The pertinent
issues arising out of the assessment against the codes are discussed below:
Page 43 of 118
Section 44
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Reconfiguration of a Lot Code
The proposed subdivision broadly conforms to the provisions of The Noosa Plan’s Reconfiguring
a Lot Code. The application proposes two new residential lots with proposed lot 1 having a lot
size of 5,737m2 and proposed lot 2 with an area of 3,940m2. The proposed lots have an area and
dimension which aligns with the minimum lot sizes of the code and which are suitable to
accommodate the intended use. Providing the application can demonstrate compliance regarding
effluent disposal areas and natural hazards associated to the site, the proposed reconfiguration
would be consistent with this code.
Biodiversity Overlay
The site is broadly affected by the Biodiversity Overlay and has both Environmental Protection
Areas and a Riparian Buffer Area over a vast majority of the site.
The mapped Environmental Protection Area seeks to protect vegetation from fragmentation and
edging effects while maintaining it in manageable and viable configurations. The Biodiversity
Overlay Code intends to achieve these outcomes by ensuring new lot boundaries do not transect
existing vegetation and new lots are only created where suitable house areas are available (e.g.
existing cleared areas). Where vegetation interference is unavoidable, development must be
carried out in a way that maximises vegetation retention.
Similarly, the Riparian Buffer Area under the Biodiversity Overlay Code seeks to exclude all
development from riparian areas to maintain the ecological and environmental significance of the
subject riparian. The code seeks to exclude all development from riparian areas in order to
maintain bank stability, water quality, wildlife corridors and terrestrial habitat.
The application proposes to create tenure for the two existing dwellings by reconfiguring the lot (1
lot into 2 lots) and with the provision of a common access. In order to minimise vegetation
clearing, the proposed common boundary generally follows the bearing of the existing driveway
of proposed lot 1 and only intersects vegetation along the final section where meeting the rear
boundary. The proposed alignment of the boundary is depicted in Figure 4 and 5 below. The
proposed alignment of the common boundary demonstrates compliance with the Specific
Outcomes of the Biodiversity Overlay Code by minimising fragmentation and maximising
retention of existing vegetation. Additionally, the application proposes a covenant area for
environmental purposes over a substantial area of the site securing vegetation to the north with
proximity to the Burgess Creek riparian area. The covenant area also secures a 5m – 6m
vegetation strip along the rear property boundary which aligns with The Noosa Plan’s coastal
hazard provisions where revegetation is sought within a 6.0m setback from seaward boundaries.
The proposed covenant area secures the most significant vegetation over the site and restricts
building and development to existing cleared areas.
The proposed subdivision does not create additional development opportunity or intensification
over the site. Accordingly, the proposed reconfiguration will not significantly increase the scale
and density of development onsite and does not intensify development within the riparian buffer
area.
The proposed reconfiguration layout aligns with the outcomes of the Biodiversity Overlay Code.
Council’s Environment Officer considers the subdivision design is an appropriate response to the
site’s ecological constraints overall, with the registration of a significant covenant area for
environmental purposes adjacent to the waterway ensuring a suitable riparian buffer consistent
with the Overall Outcomes of the Overlay Code.
Page 44 of 118
Section 45
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 4 – Boundary to follow existing driveway
Figure 5 – Red arrow indicative of proposed boundary
Effluent Disposal
The existing duplex development was approved by Council in December 1993 (TPC 2566). As
the site was not within a sewerage service area, an onsite effluent disposal system was approved
which has serviced the development since the commencement of the use.
Council’s Plumbing and Building Section have advised that no records or information is available
regarding the nature of the existing system and its capacity to operate as intended. Moreover, the
application has not provided sufficient information or evidence to suggest that the existing
systems are operating at a reasonable standard and are wholly located within the lots they intend
to serve.
Page 45 of 118
Section 46
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Accordingly, Specific Outcome O1 of the Reconfiguring a Lot Code remains unaddressed as the
applicant has not demonstrated the proposed lots have the appropriate area and dimension to
accommodate the existing effluent disposal system. Furthermore, no information has been
provided to demonstrate the existing systems are appropriately sited and designed to minimise
impacts on water quality and biodiversity.
Third party advice was sought from Unitywater regarding any sewerage connection
requirements. Unitywater advised it does not have any requirements for either proposed lots to
connect to reticulated sewerage as the site is outside Unitywater’s sewerage connection area. A
connection to water supply is however warranted with each proposed lot to be metered
separately.
It is recommended only a Preliminary Approval be granted at this stage. Conditions are
recommended requiring a further code assessable application to be submitted to Council with the
provision of an effluent disposal report prior to the issue of a full approval. The report must
comment on the nature of existing systems and whether they have the capacity to continue
servicing the development without causing harm to the receiving environment. The report must
also provide evidence both proposed lots have an appropriate area and dimension to
accommodate existing systems and do not conflict with the proposed covenant area.
Bushfire Hazard
A large portion of the site to the north and smaller portion to the south is affected by a medium
bushfire hazard area under the Natural Hazards Overlay mapping. Where increasing lots within a
bushfire hazard area assessment is triggered against the bushfire provisions of the Natural
Hazards Overlay Code.
Specific Outcome O10 of the Natural Hazards Overlay Code seeks to maintain the safety of
people and property by avoiding subdivision of sites having a medium or high bushfire hazard.
Alternatively, a site specific bushfire hazard assessment must be provided. To address bushfire
hazard, the hazard assessment must either determine the site as having a low bushfire hazard
rating or provide recommendations as to how bushfire hazard can be appropriately addressed.
The application has not provided the necessary bushfire hazard and management assessment
and, therefore, does not satisfy Specific Outcome O10 of the Natural Hazards Overlay Code. The
applicant maintains that the proposed reconfiguration to create one additional lot does not further
endanger people or property, as two existing dwellings are situated onsite. However, the
proposed subdivision will create two new titles with the potential to introduce two unrelated
owners or parties residing on both proposed lots. A significant covenant area is also proposed
which is within close proximity to both existing dwellings onsite. The intent of the covenant is to
protect vegetation in its current state and evidence is required to ensure bushfire hazard is
acceptable before the proposed subdivision can be supported.
Access & Cross Over
Both dwellings on the site are currently serviced by an existing driveway and cross over which
provides direct access to David Low Way. The existing access was approved under the original
town planning consent for the duplex on the 22nd December 1993.
The standard of the existing access formed a critical component of the engineering assessment
for the proposed reconfiguration. The existing access is substandard and does not provide
sufficient sight lines to conform to the design speed of David Low Way and does not meet
minimum engineering safety standards.
The access is located on a section in David Low Way where sight lines are impeded to the north
by a bend in the road and a natural embankment with vegetation in the road reserve.
Additionally, David Low Way forms a crest to the south which also reduces sight lines for users of
the crossover.
Page 46 of 118
Section 47
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
The application proposes to undertake vegetation clearing and embankment works within the
road reserve to the north and south of the existing cross over in conjunction with improvement
works to the existing driveway and cross over. The application also proposes to provide
approach signage which will alert road users on northern approach. The application has not
provided precise specifications and details of the proposed sight line and driveway works
(including vegetation clearing) and it is therefore recommended that a condition of approval be
included requiring a further operational works application to be lodged.
Council Footpath Encroachment
A section of an existing Council footpath network encroaches onto the site for an approximate
length of 89m. The encroachment generally follows the bearing of the lot boundary along the
south-western section of the site. The applicant has agreed to dedicate a portion of the land as
road reserve where the infrastructure encroaches.
A condition of approval will be included to facilitate the land dedication in order to rectify the
footpath encroachment.
4. CONSULTATION
4.1. IDAS Referral Agencies
The application was referred to the State Assessment and Referral Agency in relation to the
following referral matters:
Concurrence
Department of Environment and Heritage Protection
The Department is a concurrence agency for Reconfiguring a Lot within a Coastal Management
District. On 27 July 2016, the Department advised the development is supported and must be
undertaken in accordance with the approved plans.
4.2. Other Referrals
The application was forwarded to Unitywater and the following internal Council specialists:
Development Engineer;
Environmental Officer; and
Plumbing Inspector.
4.3. Public Notification
Not applicable.
5. CONCLUSION
The application seeks to subdivide the 9,677m2 block into two lots with associated easement for
access and covenant area for environmental purposes. The site is located within the Detached
Housing Zone in the Eastern Beaches Locality.
The site is broadly affected by the Biodiversity Overlay and is located within a Riparian Buffer
Area and Environmental Protection Area. The proposed lot layout appropriately responds to the
sites environmental constraints by nominating a significant covenant area to protect the
ecological values of the Burgess Creek riparian and dunal vegetation located throughout the site.
A 5m – 6m dunal covenant area is also proposed along the rear seaward boundary which aligns
with The Noosa Plan’s coastal hazard area provisions.
The existing access arrangement off David Low Way is substandard and a critical engineering
consideration. The proposed upgrades to the existing access are appropriate and align with
minimum standards.
Page 47 of 118
Section 48
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
The application has not provided sufficient information in order to address bushfire hazard which
affects a large portion of the site to the north and a small portion to the south. Additionally, no
information has been provided regarding the capacity of two existing onsite effluent disposal
systems and their ability to continue servicing the development without causing environmental
harm. A Preliminary Approval only is recommended, with conditions requiring a further code
assessable application to be submitted to address the outstanding bushfire hazard and effluent
disposal issues.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer to the Mayor & CEO Community Facilities Financial Services
Executive Support Community Development ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property & Facilities
Waste & Environmental Health Revenue Services
Executive Office x Planning & Infrastructure
Community Engagement x Building & Plumbing Services
Customer Service Civil Operations
Economic Development Infrastructure Planning & Design
Governance x Planning & Environment
Human Resources Strategic Land Use Planning
Sustainability
Page 48 of 118
Section 49
ATTACHMENT 1 -Riparian Buffer Mapping
Page 49 of 118
2 ATTACHMENT 1 -Riparian Buffer Mapping
° j — - y i fi , ve ms ———— }
ad
5 1 1 1 3 2 1115 382 10 24 66 y
5 1 1 1 3 3 1136 378 6 13 37 y
5 1 1 1 3 4 1183 376 14 33 63 jj
5 1 1 1 3 5 1247 399 6 11 0 }
5 1 1 1 3 6 1576 379 3 3 0 -
5 1 1 1 3 7 2616 378 6 31 38 }
4 1 1 1 4 0 796 440 1811 82 -1
5 1 1 1 4 1 796 440 154 64 33 ie
5 1 1 1 4 2 1122 473 24 33 23 |
5 1 1 1 4 3 1150 464 86 58 28 LS
5 1 1 1 4 4 1251 474 118 33 14 aap
5 1 1 1 4 5 1686 485 1 3 92 |
4 1 1 1 5 0 796 497 889 40 -1
5 1 1 1 5 1 796 498 13 30 70 i,
5 1 1 1 5 2 840 497 36 40 51 fa
5 1 1 1 5 3 908 515 5 6 0 -
5 1 1 1 5 4 1092 506 1 3 32 -
5 1 1 1 5 5 1136 509 16 27 68 if
5 1 1 1 5 6 1201 514 49 19 20 Ps
5 1 1 1 5 7 1683 505 2 4 55 4
4 1 1 1 6 0 611 527 1987 46 -1
5 1 1 1 6 1 611 527 45 44 10 zene
5 1 1 1 6 2 814 531 30 25 58 vA
5 1 1 1 6 3 939 529 11 44 19 Ke
5 1 1 1 6 4 1126 533 111 40 25 ree
5 1 1 1 6 5 1675 540 4 24 0 f
5 1 1 1 6 6 2594 533 4 36 0 :
4 1 1 1 7 0 657 565 559 29 -1
5 1 1 1 7 1 657 567 53 24 20 ae
5 1 1 1 7 2 940 566 113 28 15 awe
5 1 1 1 7 3 1082 572 3 4 0 S|)
5 1 1 1 7 4 1197 565 19 23 14 es
4 1 1 1 8 0 710 548 1883 116 -1
5 1 1 1 8 1 710 591 72 31 0 me
5 1 1 1 8 2 946 591 47 38 20 oo
5 1 1 1 8 3 1039 548 58 116 0 ,
5 1 1 1 8 4 1111 584 24 47 0 p
5 1 1 1 8 5 1133 570 47 64 47 ta
5 1 1 1 8 6 1669 596 1 5 38 |
5 1 1 1 8 7 2586 572 7 45 70 |
4 1 1 1 9 0 942 628 1642 44 -1
5 1 1 1 9 1 960 628 42 31 16 nt
5 1 1 1 9 2 1101 633 20 39 0 hi
5 1 1 1 9 3 1141 634 33 18 23 ak
5 1 1 1 9 4 1660 649 1 3 34 :
5 1 1 1 9 5 2579 632 5 37 90 }
4 1 1 1 10 0 549 661 1161 69 -1
5 1 1 1 10 1 549 669 124 51 28 Pec
5 1 1 1 10 2 685 686 27 25 0 <e
5 1 1 1 10 3 972 661 13 51 2 y
5 1 1 1 10 4 1001 662 37 52 77 a
5 1 1 1 10 5 1092 668 24 62 20 4
5 1 1 1 10 6 1114 661 26 50 15 ha
5 1 1 1 10 7 1709 720 1 4 83 |
4 1 1 1 11 0 494 709 2076 57 -1
5 1 1 1 11 1 494 720 40 23 38 Pe
5 1 1 1 11 2 885 740 3 2 46 :
5 1 1 1 11 3 979 712 6 48 0 e
5 1 1 1 11 4 1079 731 32 34 22 i
5 1 1 1 11 5 1123 709 21 46 90 4
5 1 1 1 11 6 2565 741 5 25 56 |
4 1 1 1 12 0 981 761 1583 33 -1
5 1 1 1 12 1 981 764 2 3 0 ;
5 1 1 1 12 2 1001 761 20 33 0 i
5 1 1 1 12 3 1050 765 31 24 39 a
5 1 1 1 12 4 1742 769 2 3 0 %
5 1 1 1 12 5 2562 768 2 18 49 |
4 1 1 1 13 0 922 771 1900 64 -1
5 1 1 1 13 1 922 822 6 3 0 p
5 1 1 1 13 2 979 771 14 64 0 :
5 1 1 1 13 3 1045 789 24 46 43 gi
5 1 1 1 13 4 2556 807 2 17 36 |
5 1 1 1 13 5 2819 811 3 2 38 ,
4 1 1 1 14 0 1073 828 1483 15 -1
5 1 1 1 14 1 1105 835 1 4 17 a
5 1 1 1 14 2 2553 828 3 15 51 |
4 1 1 1 15 0 748 846 2075 39 -1
5 1 1 1 15 1 748 855 3 4 54 q
5 1 1 1 15 2 993 846 13 39 0 ,
5 1 1 1 15 3 1071 849 3 9 0 /
5 1 1 1 15 4 1749 860 1 3 0 r
5 1 1 1 15 5 2512 852 4 2 0 ,
5 1 1 1 15 6 2548 846 5 38 0 }
5 1 1 1 15 7 2808 863 15 20 30 a
4 1 1 1 16 0 321 883 2493 67 -1
5 1 1 1 16 1 321 911 17 15 35 °
5 1 1 1 16 2 977 892 14 42 14 5
5 1 1 1 16 3 1001 905 31 45 25 1
5 1 1 1 16 4 1057 885 8 44 42 hi
5 1 1 1 16 5 1734 888 10 50 0 }
5 1 1 1 16 6 2809 883 5 28 60 {
4 1 1 1 17 0 906 934 1942 51 -1
5 1 1 1 17 1 906 934 16 31 0 Pe
5 1 1 1 17 2 975 960 92 25 23 art.
5 1 1 1 17 3 2533 944 6 24 71 }
5 1 1 1 17 4 2844 957 4 15 0 :
4 1 1 1 18 0 886 1028 2035 24 -1
5 1 1 1 18 1 886 1032 36 9 29 ee
5 1 1 1 18 2 2525 1031 15 21 10 Pa
5 1 1 1 18 3 2863 1028 58 20 13 a)
4 1 1 1 19 0 240 1076 2278 63 -1
5 1 1 1 19 1 240 1116 50 16 15 SRP
5 1 1 1 19 2 289 1100 37 43 42 ge
5 1 1 1 19 3 753 1096 24 29 0 i
5 1 1 1 19 4 808 1124 5 9 0 r
5 1 1 1 19 5 854 1101 3 2 74 7
5 1 1 1 19 6 896 1097 30 33 47 re
5 1 1 1 19 7 961 1076 41 45 31 +a
5 1 1 1 19 8 1088 1108 13 15 6 a
5 1 1 1 19 9 1700 1102 4 18 28 i
5 1 1 1 19 10 2510 1090 8 47 69 }
4 1 1 1 20 0 259 1128 2201 23 -1
5 1 1 1 20 1 259 1128 28 23 36 ‘3
5 1 1 1 20 2 353 1131 9 4 16 a
5 1 1 1 20 3 755 1135 16 6 10 7
5 1 1 1 20 4 827 1132 4 3 0 G
5 1 1 1 20 5 890 1134 17 10 29 a
5 1 1 1 20 6 962 1129 32 15 27 A
5 1 1 1 20 7 1041 1145 1 4 23 7
5 1 1 1 20 8 1087 1130 6 12 0 n
5 1 1 1 20 9 1694 1147 2 4 0 ;
5 1 1 1 20 10 2457 1130 3 7 0 ;
4 1 1 1 21 0 259 1132 2517 64 -1
5 1 1 1 21 1 259 1147 20 32 35 ie
5 1 1 1 21 2 335 1167 13 8 44 +
5 1 1 1 21 3 363 1138 56 44 33 wn
5 1 1 1 21 4 685 1157 11 16 10 Ry
5 1 1 1 21 5 787 1152 35 31 16 fy.
5 1 1 1 21 6 952 1132 38 64 33 fy
5 1 1 1 21 7 1002 1139 4 32 0 ’
5 1 1 1 21 8 1046 1138 14 51 24 |
5 1 1 1 21 9 1090 1146 14 36 10 Fy
5 1 1 1 21 10 1692 1161 1 4 40 1
5 1 1 1 21 11 2505 1138 5 37 38 }
5 1 1 1 21 12 2775 1155 1 3 0 :
4 1 1 1 22 0 232 1180 2239 44 -1
5 1 1 1 22 1 232 1184 20 29 11 rm,
5 1 1 1 22 2 460 1197 55 14 15 et
5 1 1 1 22 3 887 1199 3 2 35 .
5 1 1 1 22 4 945 1182 2 3 10 ,
5 1 1 1 22 5 1024 1189 2 5 25 ee
5 1 1 1 22 6 1090 1192 21 23 13 K
5 1 1 1 22 7 1685 1191 2 4 0 r
5 1 1 1 22 8 2415 1180 56 44 35 fo
4 1 1 1 23 0 521 1216 1976 69 -1
5 1 1 1 23 1 547 1246 2 20 45 |
5 1 1 1 23 2 821 1254 12 9 48 a
5 1 1 1 23 3 1031 1249 7 18 33 NY
5 1 1 1 23 4 1082 1242 17 26 31 Stl
5 1 1 1 23 5 1675 1252 1 4 0 j
5 1 1 1 23 6 2407 1216 36 69 51 [
5 1 1 1 23 7 2490 1237 7 36 58 }
4 1 1 1 24 0 304 1263 2201 29 -1
5 1 1 1 24 1 334 1283 8 2 21 ae
5 1 1 1 24 2 784 1285 4 3 39 7
5 1 1 1 24 3 845 1263 38 25 4 >e
5 1 1 1 24 4 1033 1271 6 16 0 aR
5 1 1 1 24 5 1068 1278 17 12 18 Was
5 1 1 1 24 6 2501 1288 4 4 12 ‘
4 1 1 1 25 0 243 1232 2290 122 -1
5 1 1 1 25 1 243 1232 28 122 56 i
5 1 1 1 25 2 358 1266 74 48 10 oes.
5 1 1 1 25 3 524 1262 16 38 8 Pn
5 1 1 1 25 4 639 1315 1 5 61 |
5 1 1 1 25 5 701 1303 56 25 42 a
5 1 1 1 25 6 840 1288 42 19 36 ee
5 1 1 1 25 7 998 1289 45 37 0 yo
5 1 1 1 25 8 1068 1266 18 58 58 4
5 1 1 1 25 9 2471 1273 24 58 61 |
5 1 1 1 25 10 2528 1303 5 3 56 7
4 1 1 1 26 0 236 1348 2222 43 -1
5 1 1 1 26 1 236 1361 10 26 69 \
5 1 1 1 26 2 757 1362 4 5 0 :
5 1 1 1 26 3 875 1374 68 14 45 aw
5 1 1 1 26 4 1026 1348 55 42 0 @
5 1 1 1 26 5 1121 1354 33 43 55 ee
5 1 1 1 26 6 2457 1383 1 4 28 :
4 1 1 1 27 0 249 1379 2258 55 -1
5 1 1 1 27 1 249 1389 22 45 54 “4
5 1 1 1 27 2 520 1387 46 32 74 a
5 1 1 1 27 3 742 1402 87 31 38 Sin
5 1 1 1 27 4 909 1385 154 44 45 tO
5 1 1 1 27 5 2411 1399 30 6 50 We
4 1 1 1 28 0 265 1432 2258 28 -1
5 1 1 1 28 1 265 1440 15 20 42 i
5 1 1 1 28 2 550 1454 16 6 33 a
5 1 1 1 28 3 645 1452 3 6 29 i
5 1 1 1 28 4 829 1432 9 10 7 ae
5 1 1 1 28 5 884 1448 17 10 46 ee
5 1 1 1 28 6 1039 1440 37 20 28 RAY
5 1 1 1 28 7 2402 1433 5 24 12 f
5 1 1 1 28 8 2503 1439 20 16 58 a
4 1 1 1 29 0 258 1468 2234 59 -1
5 1 1 1 29 1 258 1491 16 30 28 ‘
5 1 1 1 29 2 448 1501 3 7 14 |
5 1 1 1 29 3 651 1489 288 34 23 Becerra
5 1 1 1 29 4 1043 1468 46 59 58 |
5 1 1 1 29 5 2405 1492 2 2 16 [an
4 1 1 1 30 0 256 1509 2206 54 -1
5 1 1 1 30 1 256 1528 7 17 10 ;
5 1 1 1 30 2 500 1509 35 41 30 me
5 1 1 1 30 3 744 1523 84 27 6 Pe
5 1 1 1 30 4 826 1502 40 52 18 aa
5 1 1 1 30 5 1030 1531 55 19 19 Poa
5 1 1 1 30 6 1195 1524 25 20 15 ees
5 1 1 1 30 7 2454 1537 8 26 0 .
4 1 1 1 31 0 264 1548 2244 38 -1
5 1 1 1 31 1 264 1558 86 20 3 —
5 1 1 1 31 2 537 1551 46 35 68 =),
5 1 1 1 31 3 742 1548 63 33 11 Sa
5 1 1 1 31 4 920 1564 11 14 29 oe
5 1 1 1 31 5 1077 1552 29 27 15 ON)
5 1 1 1 31 6 1182 1551 49 21 43 ae
5 1 1 1 31 7 1503 1578 2 2 29 |
5 1 1 1 31 8 2446 1549 5 27 35 ge
5 1 1 1 31 9 2482 1549 26 24 32 Be
4 1 1 1 32 0 319 1579 2155 38 -1
5 1 1 1 32 1 344 1587 103 25 20 ee
5 1 1 1 32 2 571 1579 18 26 0 s
5 1 1 1 32 3 665 1612 3 5 22 }
5 1 1 1 32 4 748 1584 17 27 51 Nh
5 1 1 1 32 5 805 1587 108 30 5 See
5 1 1 1 32 6 968 1596 10 13 0 e
5 1 1 1 32 7 1077 1583 76 33 0 Beat
5 1 1 1 32 8 1191 1599 10 16 36 a
5 1 1 1 32 9 1501 1590 1 4 29 !
5 1 1 1 32 10 2421 1578 53 32 2 a
4 1 1 1 33 0 262 1563 2226 104 -1
5 1 1 1 33 1 262 1571 71 48 28 ey
5 1 1 1 33 2 370 1627 7 6 0 d
5 1 1 1 33 3 393 1563 175 90 0 =
5 1 1 1 33 4 599 1584 62 81 10 oe
5 1 1 1 33 5 754 1613 70 29 11 See,
5 1 1 1 33 6 1101 1598 46 61 0 S
5 1 1 1 33 7 1155 1617 40 50 24 A
5 1 1 1 33 8 2433 1566 55 97 8 I
4 1 1 1 34 0 236 1647 2271 56 -1
5 1 1 1 34 1 236 1655 39 37 0 y
5 1 1 1 34 2 366 1658 127 43 39 Swe
5 1 1 1 34 3 591 1662 7 37 18 Be
5 1 1 1 34 4 696 1651 197 50 23 eee,
5 1 1 1 34 5 1114 1647 101 56 0 Vey
5 1 1 1 34 6 1486 1667 2 4 52 3
5 1 1 1 34 7 2428 1652 79 50 20 bly.
4 1 1 1 35 0 262 1691 2205 50 -1
5 1 1 1 35 1 294 1700 8 15 24 a
5 1 1 1 35 2 331 1711 10 5 25 eee
5 1 1 1 35 3 492 1714 12 11 28 i
5 1 1 1 35 4 708 1687 31 46 0 SF
5 1 1 1 35 5 738 1687 108 46 20 Wad
5 1 1 1 35 6 1102 1698 5 5 27 »
5 1 1 1 35 7 1148 1693 21 34 44 Be
5 1 1 1 35 8 2422 1694 45 47 30 £3
4 1 1 1 36 0 324 1718 2144 38 -1
5 1 1 1 36 1 324 1723 19 33 23 2
5 1 1 1 36 2 428 1723 103 20 26 Sane
5 1 1 1 36 3 605 1727 69 19 42 en
eS 3 ah cee eS aed
ay ye aes ‘s oe p } Ws
\/ Jt ae, SS “Sy mar! i ; , i *
ASSO. |e en ee | ag
Cm hae Ga: Me ind = 5 1 1 1 40 8 1216 1829 24 15 36 ear
5 1 1 1 40 9 1454 1836 2 2 22 ;
5 1 1 1 40 10 2368 1836 1 3 35 er
5 1 1 1 40 11 2388 1815 78 30 19 aes
4 1 1 1 41 0 292 1834 2203 39 -1
5 1 1 1 41 1 292 1842 15 11 0 ™
5 1 1 1 41 2 420 1842 52 29 12 Besa
5 1 1 1 41 3 574 1836 51 36 0 1=%
5 1 1 1 41 4 693 1844 5 20 34 i
5 1 1 1 41 5 838 1854 16 13 0 ie
5 1 1 1 41 6 1026 1840 51 26 42 A
5 1 1 1 41 7 1143 1850 3 10 42 3
5 1 1 1 41 8 1171 1834 10 33 58 \
5 1 1 1 41 9 1202 1843 55 24 0 WAN
5 1 1 1 41 10 1452 1850 2 3 29 '
5 1 1 1 41 11 2404 1840 42 26 11 NG
4 1 1 1 42 0 288 1854 2210 47 -1
5 1 1 1 42 1 288 1863 281 20 26 WAS’
5 1 1 1 42 2 590 1861 118 22 20 oI
5 1 1 1 42 3 783 1854 52 29 0 0S
5 1 1 1 42 4 907 1869 6 15 0 eaean
5 1 1 1 42 5 1156 1863 36 21 23 Vn
5 1 1 1 42 6 1215 1857 15 20 16 eh
5 1 1 1 42 7 1245 1856 30 45 5 |)
5 1 1 1 42 8 2318 1873 38 12 11 rami
5 1 1 1 42 9 2431 1862 67 14 0 ss
4 1 1 1 43 0 249 1890 2235 72 -1
5 1 1 1 43 1 249 1935 45 11 16 aed
5 1 1 1 43 2 312 1916 21 42 2 (/;
5 1 1 1 43 3 346 1915 40 19 30 ae
5 1 1 1 43 4 467 1914 23 36 36 sf
5 1 1 1 43 5 507 1948 2 2 69 3
5 1 1 1 43 6 513 1920 36 21 42 ip
5 1 1 1 43 7 581 1934 15 20 0 >
5 1 1 1 43 8 611 1916 37 33 29 2
5 1 1 1 43 9 753 1942 4 2 28 ee
5 1 1 1 43 10 771 1918 24 29 39 te
5 1 1 1 43 11 938 1922 34 30 25 eT
5 1 1 1 43 12 974 1926 43 25 20 ai
5 1 1 1 43 13 1056 1920 17 33 0 R
5 1 1 1 43 14 1162 1920 10 42 0 Mf
5 1 1 1 43 15 1187 1914 23 38 29 i
5 1 1 1 43 16 1232 1890 33 65 16 Vi
5 1 1 1 43 17 1390 1927 65 27 38 ees
5 1 1 1 43 18 1431 1920 22 43 18 |
5 1 1 1 43 19 2153 1923 32 31 0 a
5 1 1 1 43 20 2196 1918 6 2 18 :
5 1 1 1 43 21 2344 1917 5 27 81 |
5 1 1 1 43 22 2395 1915 43 32 37 Fr
5 1 1 1 43 23 2466 1926 18 21 32 3
ee: Pee ae. Te. oad ot e ‘4 1) cn ee Hy
ma ot , % ro oe ; ah A : s . bi = ae | \ q a) i J i ag
faa? vase <a Pla ae a . i i i, BY i ay “|
beat, | LO Orc | Bie ers
4 = fh z ! ee eae x \ ! > Fg. ve
ie ee aS, “want ene | | opts
ote em ae ons. «ae ” Se < fare ‘
awe see ALE : She ae yoy
Page 49 of 118Section 50
ATTACHMENT 2- Bushfire Hazard Mapping
Page 50 of 118
SLL 40 OS ebed
< a 4 FREE eas } oe a oes
baie ie at pee coe ve ; Po ne ; » ear
ee = ti sO Sr Raa aee Fs hey ° { _ “a Re
Pr * 2b et On arta a ae a, r es
& oad a Rox g a * ¥ re ae / -™ < einer, NE
a eae oy ae <Not af wee eo BP es
. ie ee Sa oe ee H a ee | € ea a
ie ; Ce ee pe. - Saag : + 4 ee ae sg
fe - figs ia 7 : . ay : r . so Pd w t aN F - 6s wt a : cA
ef ° 1: 8 Acie giles Miami Sa Wiles peerage te.”
& « aa “ : a rs Y Pe « ee 4 , \' bs ~ i e “f \ y 3 iS Rey .
j - US Ma Bei Pe «4 We ar a hae Al 22 e/a
j tse i la ° BAR BR a a a bi 5" ee eee
f r e8 rae a i 5 er fe , i - i i NN - 1 i" , :y O Se fa 4
4 eee ‘~ ; < 2 3 Be eG B ie “< yen 4 , v = ts *< ee al be)
i “ees ; Ny RS ee i . ‘eS \s oh aa eal fo Md IAL & :
28 GES od eae. <P ae {aie Se iF cies ee a en
- Aaa a. a ae eee che ae [=
i + ee —_
a an ; se a Laat, i ld 5 1 1 1 21 10 2359 930 20 32 29 a
5 1 1 1 21 11 2431 931 33 50 0 : <j ay nt
% 1 ee a , yi ae 8 x e bi ot if]
~ a ke eos ow \
a ie ee so Sout | ©)
. ee ; e
: a : ;
re i > ; x
; 4 Era % 7 ; ; c: hed
Ag? pe SS ae = oo ig Ae
Z . oe he: juinioned a ws & » o
- “ o , F < of
re § CR te
gS 3
: Spat : *
Coe ’
f + Ws i
3 a
ee mS 4
i
buiddew; paezey ajysng -2 LNSNHOVLLVSection 51
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
3 OPW16/0016 - APPLICATION FOR DEVELOPMENT PERMIT FOR OPERATIONAL
WORKS - PRESCRIBED TIDAL WORKS (DECK)
DOCUMENT INFORM AT ION
Author Coordinator Engineering, Mark Lewis
Planning & Infrastructure Department
Index ECM/Application/OPW16/0016
Attachments 1. Existing aerial photo
2. Proposal plan
3. Existing elevation photo
APPLICATION DETAILS
Applicant Quadrant Holdings Pty Ltd C/- Project Urban
Proposal Operational Works - Prescribed Tidal Works (deck)
Properly Made Date 18 May 2016
Information Request Date 3 June 2016
Information Response Date 12 July 2016
Decision Due Date 19 September 2016
Number of Submissions Not applicable
PROPERTY DETAILS
Property Address 2 Parkyn Court, Tewantin
RP Description Lots 388 & 400 MCH 839039 & Lot 178 MCH 5169
Land Area 1.451 Ha
Existing Use of Land Noosa Marina
STATUTORY DETAILS
SEQRP Designation N/A
Locality Tewantin
Zone Open Space Recreation
Overlays Acid Sulfate Soils, Flood Hazard
Assessment Type Code
Page 51 of 118
Section 52
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
RECOMMENDATION
That Council note the report by the Coordinator Engineering to the Planning & Environment
Committee Meeting dated 6 September 2016 regarding application OPW16/0016 for a
Development Permit Operational Works – Prescribed Tidal Works (Deck) and refuse the
application for the following reasons:
1. The proposed deck does not comply with Overall Outcome and Specific Outcomes of the
Noosa Plan’s Watercourses Works Code;
2. The proposed deck is contrary to the “Purpose of Code” of the IDAS Code of the Coastal
Protection and Management Regulation 2003 and does not comply with Specific Outcomes
of the IDAS Code of the Coastal Protection and Regulation 2003;
3. The proposed development will reduce the marine uses of the site and intensify the
commercial uses by increasing the available deck areas within the marina; and
4. The proposed deck adds a substantial area and additional built form on the Noosa River, is
likely to increase traffic volumes on adjoining lands and there are insufficient parking
facilities available in the area.
REPORT
1. PROPOSAL
This application seeks approval to construct a deck at the Noosa Marina. The proposed works
consist of removing the existing floating structure adjacent to the northern side of Noosa Marina
and replacing it with a deck structure that extends from the existing buildings across to the
boundary of the lease area. The existing floating structure is approximately 2m wide x 45m long
and its purpose is to provide access to moored vessels (refer Attachment 1). The proposed
structure ranges from 6m up to 7.8m in width and is 58.87m long overall (refer Attachment 2).
The applicant in their application material states “The proposed works will provide improved
facilities for existing site uses” and in their response to an item in Council’s information request
states “Approval of the deck as prescribed tidal works does not convey any additional
commercial use rights or activity. While it is agreed that the deck will replace an existing pontoon,
the pontoon does not get used as the area is in need of constant dredging and is unviable as a
mooring as the flow of water from Doonella Lake and the bend in the river leads to continual
deposits of sand. The water is just too shallow to moor boats during all tide levels. That being
said the deck is consistent with the existing use rights for marine facility purposes and will
complement the existing and permitted site activities, irrespective of Council’s perception that it
reduces the amount of ‘marine’ activity.”
The proposed structure has been designed by a marina consultant (International Marina
Consultants) and has been certified by an RPEQ (Registered Professional Engineer of
Queensland). The design is in accordance with the relevant structural requirements for both the
Noosa Plan Watercourses Works Code and the IDAS Code of the Coastal Protection and
Management Regulation 2003.
Council’s concerns relate to the scale of the proposed deck and the potential use of the proposed
deck area.
In regard to the IDAS Code of the Coastal Protection and Management Regulation 2003
Purpose of the Code
The purpose of the code is to ensure prescribed tidal work for which it applies –
(a) Is compatible with the character and amenity of its surrounding area
...and...
(d) Is adequately serviced with infrastructure, including, for example, infrastructure for the
supply of water or the discharge of sewage;
Page 52 of 118
Section 53
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
The code sets out a number of specific outcomes and probable solutions for the works. The
following specific outcomes are of most relevance for the assessment.
O2.2 Prescribed tidal work not in a canal and for a non-private purpose is compatible with its
location, having regard to the following-
(a) The character and amenity of the work’s immediate surroundings and the locality within
which the work is located;
(b) If the relevant planning scheme states the desired character or amenity for the work’s
immediate surroundings or the locality within which the work is located – the stated desired
character or amenity
O3.1 Prescribed tidal work is of a height, scale and size to ensure the work is compatible with the
character and amenity of its location, having regard to the following:
(a) The height, scale and size of the natural features of the work’s immediate surroundings and
the locality within which the work is located,
(b) The height, scale and size of the existing buildings or other structures in the work’s
immediate surroundings and the locality within which the work is located,
(c) If the relevant planning scheme states the desired height, scale or size of buildings or other
structures in the work’s immediate surroundings or the locality within which the work is
located – the stated desired height, scale or size.
O11.1 Prescribed tidal works has appropriate infrastructure, including, in particular, road access,
parking facilities, sewerage services and water services, having regard to –
(a) The nature and scale of the work; and
(b) The number of people that may be on or at the work at any time; and
(c) The number of vehicles that may be on or moored at the work at any time; and
(d) The protection of any foreshores near the work and the vegetation and marine plants on
the foreshores
The following comments were provided by Council’s Coordinator Planning in regard to the
Watercourses Works Code of the Noosa Plan:
O4 Prescribed tidal work does not include extensions of on-site recreational areas unless there is
a clear demonstrated public benefit and public support.
The works are clearly designed to provide an extension of the on-site recreational, commercial
and public spaces on the site. The applicant submits existing outdoor dining areas will be
“transferred” to the new deck area but there is no mechanism under this approval for that to
occur. Overall the development will increase the amount of recreational, commercial and public
deck space on the site and the development does not serve any marine purpose. Instead, the
raised extension removes an existing docking facility on the northern side of the marina and
reduces the amount of “marine” activity on the site, replacing it potentially with further commercial
activity.
The increased deck area is likely to result in increased commercial activity on the site but the
development is unable to provide additional car parking to service additional activity. Car parking
demand at the existing development is regularly observed to significantly exceed the available
spaces at the development.
O5 Prescribed tidal works are designed and sited to ensure—
a) they are contained within the prolongation of boundaries of the lot;
b) that when a vessel is berthed it does not encroach over the prolongation of boundaries of
the lot;
Page 53 of 118
Section 54
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
c) a high level of visual amenity is maintained when viewed from the watercourse and
adjoining lands;
d) they avoid conflicts with uses in the water and on the foreshore and adjoining lands;
e) cluttering of watercourses is avoided;
f) excessive traffic volumes within foreshore areas and adjoining lands are avoided;
g) materials blend with the natural surrounds; and
h) they reflect the character and setting of the immediate surrounds or the locality.
The deck extension removes the existing docking facility for vessels and extends a raised deck to
the lot boundary. Boats at the new deck would be unable to dock within the lot.
O8 Large jetties, pontoons and wharves that are capable of serving other uses, such as for
private recreational purposes, are not permitted.
O9 Prescribed tidal works are designed and constructed for the sole purpose of providing access
to vessels and are sited and designed to avoid—
a) cluttering of watercourses;
b) excessive traffic volumes within foreshore areas and adjoining lands; and
c) conflicts with uses on the foreshore and adjoining lands;
d) unacceptable risks to personal and public safety.
The proposal is for a very large deck designed to provide for outdoor dining and commercial
areas. The deck is not for marine purposes and reduces the overall marine functions of the
development.
The deck adds a substantial area of additional built form on the Noosa River and adds additional
bulk and visual clutter.
The deck is likely to increase traffic volumes on adjoining lands already subject to intensive
activity and parking demand. The development is unable to cater for additional traffic or parking
demand within the site.
The deck extends toward the public jetty directly to the north and would appear to restrict the
utility of that public jetty somewhat. The works would also result in the removal of an existing
table and chairs located in the foreshore area adjacent to the entrance/carparking.
2. CONSULTATION
2.1. IDAS Referral Agencies
The application was referred to the Department of Infrastructure, Local Government and Planning
(SARA) as a concurrence agency. The Department’s response was issued on the 25 July 2016.
The response was an approval with conditions.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer to the Mayor & CEO Community Facilities Financial Services
Executive Support Community Development ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property & Facilities
Waste & Environmental Health Revenue Services
Executive Office x Planning & Infrastructure
Community Engagement Building & Plumbing Services
Customer Service Civil Operations
Economic Development Infrastructure Planning & Design
Governance Planning & Environment
Human Resources Strategic Land Use Planning
Sustainability
Page 54 of 118
Section 55
Page 55 of 118
ATTACHMENT 1
ris AS a es q =
yas . ~ was os aa
Pail Pa mies
its all 5
Tr ‘ on |
ne j <
8 a
‘es ad
es
: ; if ; —rii : by a -G ate in A
roa De en a * Site ay 4
¢ ae ee By “t j Rn | be &
a nae : . ay THEY ; Pe a is
: iS BAU eo ae yf i ol
ae oe 2 i <$
eh EL my é F id a
ae ; Ages fe
| fa o>
Sot a pee a5
— CUCU aay 5
~<a ail ad @ y eh:
re ane a te i So fox . y- “ i 1
os ee Ne my es
ye 5 oe AE 1 y ro , 94 a
os as >. re =
ie A VB 3
4 a fe es wi : ? pe mo
| = a a , . nf ./ Fe = i en y*
aA 8 ak OO air os
. ics, e Se 4 ys tM ss -
.7 —— a oy | Pe Sa)
ces Sa se m x ma sue
TERS NRA es UN, ;
© ON Tl Se VY . Se TE
Page 55 of 118Section 56
Page 56 of 118
ATTACHMENT 2
5 e| | 8
ui Zo Bi ay Sy =| el .
e328 fF gall 2} |e Fle
gaye ge agai] jft. le lz ds
g ies ae we Zul l2 |i is 2 2 [8
2888 } ws a 8 5 ja [5 |6 |<
ay als oN ae a
re He a \ze2 Bs
a Be ge AY ; = 25 ay
g eg Se a yo, ty g2 gis®
go By ee Ug / 7B Peet
. a ae gs sh aa = as segs
id sue Bs oe a [5 Be ta
g oa wi ee / Oy / ae
a i Cy ‘ > esis
“ } CY / > ©
C ISY // e
\ a AY i <x
| INA &
=| i N f Te
IN AY P
\ Ne \y ; v
AS Ni ° Fe
t y v4 3 us
Ro RY :
a iy LSA s&
1 ale le 2 =
fe f 7 s | 85
Bs : © cf 2m
a, Ay oll = | #2
' j Ay Hi 2O sae
\ f OY ; 29 «FSS
RSBES / )
wii de AO Bas ez
ge fiSP ia ak i
tak Nig a2 Los eile
; SOV! “a ; zB Aue
preset / $2 22
( y ' a <= 5= ota
ge eeby / eS in
/ je EF Seye ene
. a 7H / & $32
le - “Oo i i — 3 BEE
‘Ie f / Ss 232
z
. g
Page 56 of 118Section 57
Page 57 of 118
oD
- .
= co
=
LL °
= :
es rs
®
O :
= g
< 8
* Ze:
ee ae
a c ———e
Qs — —_
i ee . 6 Pra
ee
—— —_ E ae - = —LZAZZEZZ 5
a == ae eo Ee 5A
tae: - = —— == SS oS
PS va — a = See oi
_= 7 —
= Se F So ee <P
a — = aa
- aus a, == ma
os == Pe = i eee
7 ie - . — . ~ > a
- 2 = =
h SSS SS —— ee = nS, ze ‘ =
ae ~ = es —_ — ee Ra es ——
=< a SS = = a =
J | Bat See S SS Se as res eae == — —
= ie ee ee = Sa ee % ae == &
| Sei! =
tt piety) =a a aS = ae =
| ih | ee oon
samme iT) ileal ESS .
‘ _=- eet _—
a ae
» ee ai a —
ee Ce a a we C =
eg A oe qt 4
SA gee = 8 :Section 58
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
4 132003.221152.5 CHANGE TO AN EXISTING APPROVAL FOR MATERIAL CHANGE
OF USE FOR A DWELLING TO INCLUDE AN UNROOFED DECK AND RETAINING
WALL ADDITIONS AT 12 PARK ROAD, NOOSA HEADS
DOCUMENT INFORM AT ION
Author Development Planner, Glen Conforti
Planning & Infrastructure Department
Index ECM / Application / 132003.221152.5
Attachments 1. Proposal Plans
APPLICATION DETAILS
Applicant G. Woolley C/ Martoo Consulting
Proposal Change to an Existing Approval
Properly Made Date 20 May 2016
Information Request Date 1 June 2016
Information Response Date 15 July 2016
Decision Due Date 15 September 2016
Number of Submissions Not Applicable
PROPERTY DETAILS
Property Address 12 Park Road, Noosa Heads
RP Description Lot 54 RP 52918
Land Area 794m²
Existing Use of Land Dwelling
STATUTORY DETAILS
SEQRP Designation Urban Footprint
Locality Noosa Heads
Zone Detached Housing
Overlays Natural Hazards Overlay – Landslide Hazard
Natural Hazards Overlay – Medium Bushfire Hazard
Assessment Type Change to Approval
Page 58 of 118
Section 59
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
RECOMMENDATION
That Council note the report by the Development Planner to the Planning and Environment
Committee dated 6 September 2016 regarding Application No. 132003.221152.5 for a request to
change a Development Permit for Material Change of Use for a dwelling house to include a
retaining wall and unroofed deck, situated at 12 Park Road, Noosa Heads and:
A. Approve the change with additional Conditions 47, 48, 49, 50, 51 and 52 being included as
follows:
Additional Conditions September 2016
47. Development undertaken in accordance with this approval must comply with the
approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
MB_12PR_01 F Cover Sheet, prepared by Myles Baldwin Design 08.07.16
MB_12PR_02 F Landscape Plan, prepared by Myles Baldwin Design 08.07.16
MB_12PR_03 D Elevation / Section, prepared by Myles Baldwin 08.07.16
Design
MB_12PR_08 B Sewer Setback Detail, prepared by Myles Baldwin 08.07.16
Design
MB_12PR_09 B Existing Plants, prepared by Myles Baldwin Design 08.07.16
48. The Approved Plans must be amended to incorporate a minimum 2 metre setback for
all structures to the Park Road boundary. The amended plans must be submitted to
Council prior to the issue of any Development Permit for Operational Works*. *(Refer
to Advisory Note)
49. The 2 metre setback must be densely landscaped in accordance with Planning
Scheme Policy PSP3 Landscaping Plants and Guidelines and an Operational Works
Approval and must in particular include:
a. existing native trees including but not limited to trees 61, 62, 181, 171 and 175
retained in accordance with an Arborist Report prepared by a suitably qualified
person.
b. under storey plants that grow to a minimum height of 4m
c. four (4) 100lt endemic native trees planted at equal spacing along the length of
the structure.
50. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Operational Works. The cash
bond or trading bank guarantee will be returned on performance of the conditions of
approval less any costs incurred by Council in respect of enforcing performance of
this permit. Council reserves the right to call upon the bond or guaranteed sum to
effect compliance with conditions.
51. The works must comply with the terms of Easement B on RP 177551.
52. The works must be carried out generally in accordance with the Construction
Management Plan, prepared by TOD Engineers and Project Managers, dated July
2016 and the Slope Stability Assessment – Proposed Deck, Project No. 16072-001-
Rev0, prepared by Tectonic Geotechnical & Environmental Engineers, dated 14 April
2016.
B. Advise the applicant to cease pruning the trees in the road reserve in front of the subject
site.
Page 59 of 118
Section 60
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
REPORT
1. PROPOSAL
The proposal seeks changes to the development approval for a detached house to include a
retaining wall and an unroofed deck with a zero boundary setback to Park Road. The height of
the new deck is up to 4.5m above the natural ground level and extends from an existing level
turfed pad to the Park Road boundary. The deck addition is approximately 78m² and is a
suspended concrete structure supported by concrete columns set back approximately 2m from
the edge of the structure. Soil and turf is proposed on top of the concrete structure and an ‘up-
stand’ edge, which supports the glass balustrade, is proposed to be stone clad. Figure 1 below
shows the structures location and Figures 2 and 3 show construction details of the proposal.
Figure 4 shows the existing turfed area.
Figure 1 – Deck location
Page 60 of 118
Section 61
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 2 – Cross section
Figure 3 – Detail of up-stand beam, soil structure and drainage.
Page 61 of 118
Section 62
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 4 – The existing level turfed area and deck location
2. SITE DETAILS
2.1. Background
The Planning Scheme limits dwelling houses on 6 – 14 Park Road to a maximum gross floor area
of 150m². This maximises the retention of vegetation on Noosa Hill and maintains a green back
drop to Noosa Main Beach.
On 29 October 2004 Council issued an approval for a dwelling. The following changes to the
approval have been issued:
9 October 2006 - allowed a tree to be removed
9 August 2006 - permitted the sewer and stormwater lines to discharge to Park Road rather
than to Allambi Rise
27 September 2007 - approved a 50m² extension to the dwelling.
2.2. Site Description
The site contains an existing dwelling nestled amongst the vegetated steeply sloping lot (approx.
30% slope). Vehicle access is from 9 Allambi Rise via an access easement. Figure 5 shows an
aerial view of the subject site.
Page 62 of 118
Section 63
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Figure 5 – Aerial view
2.3. Surrounding Land Uses
Immediately to the north is a detached dwelling accessed from Allambi Rise. Further to the north
with frontage to Park Road are units that are considerably elevated above Park Road and
accessed from an Allambi Rise ‘service’ road.
Immediately to the south is a detached dwelling owned by the applicant. This dwelling has direct
vehicle access to Park Road from a basement garage which is within the Park Road setback
area. Further to the south are detached dwellings, unit blocks and mixed uses fronting Hastings
Street.
To the west across Park Road is Noosa Main Beach and units fronting the beach.
Page 63 of 118
Section 64
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
The proposed change to the development approval requested by the applicant is considered to
constitute a permissible change because:
The change would not result in a substantially different development as there is no change
to the approved use onsite;
The change would not trigger a new referral to the State Assessment and Referral Agency;
The changes do not involve prohibited development.
On this basis, the applicant is considered to be following the lawful process in making the
request.
3.2. State and Other Statutory Instruments
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
State Planning Regulatory Provisions
The following State Planning Regulatory Provisions apply to the application:
SEQ Regional Plan Regulatory Provisions
The proposal is for an urban activity within the Urban Footprint and is consistent with the SEQ
Regional Plan Regulatory Provisions
3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Noosa Heads Locality and is zoned Detached Housing. The
dwelling and associated buildings and structures are identified as a consistent use within the
zone.
Land Use & Works Provisions
The proposal is subject to the Building Works Code. The proposal generally complies with the
provisions of the Code except for setbacks. The applicant seeks a zero boundary alignment for
approximately 13m and therefore does not comply with the required 6m setback set out by
Probable Solution S1.1 of the Code.
Therefore the proposal must be assessed against the corresponding Specific Outcome O1 which
reads:
O1 Buildings and other structures are appropriately designed and sited to—
a) provide amenity for users of the premises as well as preserve the visual and
acoustic privacy of adjoining and nearby land uses;
b preserve any existing vegetation that will buffer the proposed building from
adjoining uses;
c) allow for landscaping to be provided between buildings;
d) maintain the visual continuity and pattern of buildings and landscape elements
within the street;
e) for class 10a structures, do not visually dominate the street;
f) avoid any significant adverse impacts on the natural values of watercourses and
their foreshores, including those of the Noosa River and its lakes; and
g) do not interrupt the natural cycles of erosion and accretion of watercourses and
foreshore areas
Page 64 of 118
Section 65
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
A 0.72m stone clad up-stand faces Park Road at a height varying from 1m to 4.5m above the
natural ground level. Exotic dwarf palm species and 2 small immature native trees (Acema
hemilampra and Endiandra sieberi) are proposed to be removed for the construction of the
structure. Figure 6 below shows the elevation presenting to Park Road and Figure 7 shows the
proposals approximate level.
Figure 6 – Elevation facing Park Road
Figure 7 – The red line is the approximate height and location of the deck. The photo is taken from
Noosa Main Beach.
Page 65 of 118
Section 66
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
The proposal does not retain any vegetation that would sufficiently screen the structure and does
not allow for landscaping (being built to the boundary) between the development and the
boundary. Landscaping is proposed beneath the structure which is unlikely to do well, and will
not provide visual screening. Without adequate screening there is potential to negatively impact
on the visual amenity of the area. The road reserve is well vegetated and would provide some
visual buffer, but it is not appropriate to rely upon road reserve vegetation to buffer development,
as this vegetation may need to be cleared for future works. The proposal for a zero setback to
Park Road is considered to conflict with Specific Outcome O1 and is not supported.
Given structures are located within the 6m setback adjoining at 10 Park Road and nearby at 6
and 8 Park Road and 81 Hasting Street, it is recommended the structure be setback a minimum
of 2 metres, generally consistent with these existing structures. This will provide sufficient area
for landscaping within the site, retain some small native trees, maintain the established pattern of
built form setbacks in Park Road and protect Noosa Hill’s green back drop.
The structure is proposed partially within an easement which runs along the northern boundary of
the site and of 9 Allambi Rise and is for ‘right of way’. A condition is recommended to ensure the
works are permitted under the terms of the easement.
Overlay Provisions
Natural Hazards Overlay Code – Landslide Hazard is applicable to this application.
The applicant has provided a geotechnical report, engineering design and a construction
management plan that demonstrates the site is safe from landslide during and after construction
and can be constructed with minimal impediment to traffic on Park Road.
Other Planning Matters
The applicant has pruned the canopy of trees in the road reserve for views to Laguna Bay (as
seen in Figure 7 above). It is recommended the applicant be advised to stop pruning the
vegetation in the future.
4. CONSULTATION
4.1. Other Referrals
The application was forwarded to Unitywater and the following internal Council specialists:
Engineering Officer
Their assessment forms part of this report.
5. CONCLUSION
The proposal is considered not to meet Specific Outcome O1 of the Building Works Code as the
proposed zero setback to Park Road does not allow landscaping within the site to sufficiently
screen the class 10a structure. The under floor landscaping proposed, will not provide screening
to effectively maintain the green back drop of Noosa Hill that The Noosa Plan seeks to protect.
However, should the proposal be setback a minimum of 2m, this would be consistent with the
established setbacks nearby and provide sufficient space for landscaping within the site to
provide screening. A condition is therefore recommended to setback the structure 2m from the
Park Road boundary and the application is recommended for approval on that basis.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Office X Planning & Infrastructure
Community Engagement Building & Plumbing Services
Customer Service Civil Operations
Economic Development Infrastructure Planning & Design
Governance Planning & Environment
Human Resources Strategic Land Use Planning
Page 66 of 118
Section 67
ATTACHMENT 1
Page 67 of 118
=
= +
2 r
<= # >
2 2 i =
Oo 8 Oo 2h. °
ze.)
6 < g
< 5 é ai 5
E 8 Z| 23a?
<x 5 5 é é Seaa > 5 Do
2 2 2 2 BeeR § fs ry
5 5 \ 5 5 Sere < i —! 38s ou
2 Ee E 2 | RPeEEEE 2232 2 we gu z%
SEhEEELESESEE) FeegggER Fe FSESS4 3558 8 wf gs g los,
2 zz wd = ws 3s
BSSSRrs<Sesresss BSRSESERER 38 8 BRR ERS BPP F & § 84 85% 2 6 Qo
= 2 ge
9 5 £o gee ge 8
BSeNcc we aw Ben BERS ots BRe Beaesse SaFR¥ 5 2 §¢ §25 83 :
z = 2 z oO B23. 8 ¢
é Ss o8 Sa 2°
: 3 egic G28 3§ 8 o
: Z seoe £85 Bz 8
2 3 3 gee & 5 990 &
e 2 g > 8 a Seto £52 <2 §
353 8 8 Zoo B88 E Z| g 258 g 2352 £28 =: §&
z 22 EE Zz s329802 SE = = <8 z 628 2598 Ye
232365 28 ec 2223935 £5 28 & Zg5 4 85O28 fg8% SR
z $ ea 6 3 Zz 6 z|5 z 3 zee Qo 9
pose & 8o8 522 s ofé& @ zee2 2s 82 =
Se2SsEssRe2E38 Oe 23 O33 952288 9 3 zees S526 #2
zeegbeeegis2s sec biaed 25 3273522 2fiG z gessuseh BS
Ses aye? 26 3 $i 2 5 $5 2 S5Oze°6H SH 3S
SessSSEsTESSE GEZ5S5F22 BEF 8SF825 BES F egageses 88 2
§ 9 Seog88egzoe Fy
5 z¢ ggueOreesue es
w 3 § § E 8 BZ So<¢gt#egagu038 326 w
5 2 205 38 2 elz 3 g g §8 Segseesezig 8s Oo
2 e Bobo LTE E 2 Eas BS 528 23 25 229232 8e528 e583
E B20 gg 52 €_ :] DS ozree2e? 3 bE 5 . ak ao ze Ore <
OQ yeeeeeeesishs xs legis gil ghiaee gee, 38 EZR OCREO TSR Bee =
= SEgPE geese e SERERESE 528 SegEhh s288 Es BOSSEH2 E282 un 088 ~
02/8233 ges oe 8252 222 E BR 825 a: 2% soe seo OB a5 UE wi
O PFegasagehegs eoesestes Qo 5 3 Q g82 2923 Bo 625822582208 22 o>
o gF523 26 ¢8 22825 z2is855s 28 2b bR S28 se Fo Z2ESEF OEE B ES 26
5 2288 ess FSF 22 BESPESSF BFS oQFFRES BQEES EE oSeesSEoR E2838 £0
= ay ay es zy zy ae 5 22i889s22 225 22
= $3 9 26 9 23 Boo » 23 —e o® °
afOezeae SSR2@2F2F - FUSseFeanst FEHLS5 FALSE BSs2, FK2HF5 F Ze. . . eee
3
3
z
z 5
a 28
3 ges
w SS z E23
2 a0 = Zo
2228 8
> oz: ge ge
O,e8GG bE gik
w Belg, ss A
TeSECoCE EES 23
oegeseeb ees BES
og eseeoa8s ae
o CSF 2285 HG a
z a
5583583333 235
Eee ci cc ag gar
<RSSRRREERSK gge
e oeesddeda 8
OoFfFSLSLLIEIE gas
238
ges
233
ce I a oe :
in’ 4 =
8 eR
: a 3 a Hu
hy ee oy, ¢ € 3 LHRH
. : zee 2 2. 8 Webs
o2 2 § E28 gules
# § 8&6 rrr
Se £€ € 28s go.)
2a
—~ ' | |
( ) '
zt hes
4 88
n”
: Cy Pe
a | < 1B
: EF 6 9D
bY y aa QO He
ti 5 1 1 1 95 3 586 2399 11 8 29 wr
5 1 1 1 95 4 645 2403 37 24 44 Oe
5 1 1 1 95 5 1317 2381 59 50 44 (lnm
5 1 1 1 95 6 1396 2408 2 2 0 tj
5 1 1 1 95 7 2175 2395 19 36 32 9
5 1 1 1 95 8 2232 2400 42 25 30 Bz
4 1 1 1 96 0 159 2444 2115 31 -1
5 1 1 1 96 1 159 2450 11 9 0 .
5 1 1 1 96 2 230 2456 20 13 0 7
5 1 1 1 96 3 585 2450 9 8 17 <
5 1 1 1 96 4 645 2445 37 21 79 Of
5 1 1 1 96 5 1295 2444 86 29 10 MA
5 1 1 1 96 6 1383 2465 73 3 32 ay
5 1 1 1 96 7 2176 2447 18 16 55 QO
5 1 1 1 96 8 2232 2446 42 29 38 ee
4 1 1 1 97 0 261 2464 2013 35 -1
5 1 1 1 97 1 261 2464 45 25 27 ae
5 1 1 1 97 2 645 2467 14 26 41 238
5 1 1 1 97 3 1283 2466 220 31 45 MH
5 1 1 1 97 4 2176 2466 18 33 0 2
5 1 1 1 97 5 2199 2462 21 41 0 |
5 1 1 1 97 6 2232 2471 42 26 4 8S
4 1 1 1 98 0 187 2489 2087 33 -1
5 1 1 1 98 1 187 2496 17 20 0 .
5 1 1 1 98 2 264 2493 88 24 18 Pees
5 1 1 1 98 3 646 2495 36 27 59 a8
5 1 1 1 98 4 1266 2495 12 19 9 LTT
5 1 1 1 98 5 1358 2489 63 32 37 THT
5 1 1 1 98 6 1422 2489 182 31 32 THT]
5 1 1 1 98 7 1578 2485 28 40 67 hes
5 1 1 1 98 8 1713 2504 26 9 68 =
5 1 1 1 98 9 2176 2502 18 11 78 a
5 1 1 1 98 10 2232 2492 42 20 41 Z2<
4 1 1 1 99 0 208 2497 2043 38 -1
5 1 1 1 99 1 208 2517 65 7 34 a”
5 1 1 1 99 2 560 2497 19 38 17 rm
5 1 1 1 99 3 1258 2512 345 20 21 LTT
5 1 1 1 99 4 1450 2501 64 38 50 TTT
5 1 1 1 99 5 1554 2501 52 38 55 IR
5 1 1 1 99 6 1757 2515 14 15 0 sS
5 1 1 1 99 7 2176 2517 18 16 84 <
5 1 1 1 99 8 2232 2509 19 20 79 O
4 1 1 1 100 0 237 2502 2014 42 -1
5 1 1 1 100 1 237 2532 2 3 56 =
5 1 1 1 100 2 360 2502 22 42 38 sd
5 1 1 1 100 3 646 2524 36 12 52 <0
5 1 1 1 100 4 1326 2520 160 18 17 ST
5 1 1 1 100 5 1552 2521 47 17 47 HIB
5 1 1 1 100 6 1782 2531 15 5 56 =
5 1 1 1 100 7 2232 2531 19 2 22 Oo
4 1 1 1 101 0 580 2522 1694 30 -1
5 1 1 1 101 1 580 2524 20 16 27 pom
5 1 1 1 101 2 1216 2534 2 12 39 ]
5 1 1 1 101 3 1291 2526 285 26 21 BUT
5 1 1 1 101 4 1583 2532 15 9 28 AS
5 1 1 1 101 5 1790 2536 17 8 5 sS
5 1 1 1 101 6 2176 2532 18 12 72 a
5 1 1 1 101 7 2232 2522 42 25 39 eS
4 1 1 1 102 0 371 2539 1903 50 -1
5 1 1 1 102 1 371 2545 62 44 22 eS
5 1 1 1 102 2 448 2543 211 38 12 RAF:
5 1 1 1 102 3 1185 2541 148 56 34 PT
5 1 1 1 102 4 1344 2539 251 38 42 feel
5 1 1 1 102 5 1691 2544 11 7 8 7h
5 1 1 1 102 6 1798 2539 14 27 36 OR
5 1 1 1 102 7 2175 2554 19 11 53 s
5 1 1 1 102 8 2232 2546 42 19 79 53
4 1 1 1 103 0 277 2564 1997 22 -1
5 1 1 1 103 1 277 2565 95 19 24 are,
5 1 1 1 103 2 645 2566 37 16 69 we
5 1 1 1 103 3 1180 2565 27 19 33 fi
5 1 1 1 103 4 1338 2566 62 16 49 fen
5 1 1 1 103 5 1499 2564 23 13 22 ML
5 1 1 1 103 6 1565 2579 92 3 24 fe)
5 1 1 1 103 7 1817 2564 129 20 10 Sr
5 1 1 1 103 8 2176 2571 18 5 55 =
5 1 1 1 103 9 2232 2566 42 17 46 28
4 1 1 1 104 0 310 2552 1964 56 -1
5 1 1 1 104 1 310 2582 130 12 56 —
5 1 1 1 104 2 646 2582 36 12 49 <=
5 1 1 1 104 3 1175 2584 110 18 38 eT
5 1 1 1 104 4 1304 2552 48 50 51 Wy
5 1 1 1 104 5 1358 2580 114 26 6 Whi,
5 1 1 1 104 6 1550 2575 34 27 25 Oy
5 1 1 1 104 7 1651 2584 3 5 16 f
5 1 1 1 104 8 1850 2581 20 27 6 <
5 1 1 1 104 9 1968 2593 18 7 76 >
5 1 1 1 104 10 2176 2587 18 10 0 qe
5 1 1 1 104 11 2233 2579 41 19 64 <Z
4 1 1 1 105 0 1168 2595 1106 34 -1
5 1 1 1 105 1 1168 2598 52 21 29 Bee
5 1 1 1 105 2 1227 2600 51 28 30 |)
5 1 1 1 105 3 1319 2602 22 24 30 RY
5 1 1 1 105 4 1355 2597 61 23 19 MMH
5 1 1 1 105 5 1508 2595 40 33 40 a
5 1 1 1 105 6 1635 2613 2 2 63 /
5 1 1 1 105 7 1994 2602 43 16 68 =~
5 1 1 1 105 8 2177 2597 17 15 87 <
5 1 1 1 105 9 2232 2602 42 17 0 am
4 1 1 1 106 0 1169 2617 890 15 -1
5 1 1 1 106 1 1144 2624 16 5 33 wee
5 1 1 1 106 2 1169 2617 32 14 24 S/S
5 1 1 1 106 3 1222 2617 135 15 37 BT
5 1 1 1 106 4 1356 2617 184 15 32 TTT
5 1 1 1 106 5 1636 2620 13 10 0 S
5 1 1 1 106 6 1895 2617 6 9 0 /
5 1 1 1 106 7 2041 2620 18 7 33 a
4 1 1 1 107 0 222 2619 2052 57 -1
5 1 1 1 107 1 222 2636 12 5 0 -
5 1 1 1 107 2 407 2644 1 3 13 j
5 1 1 1 107 3 511 2642 1 5 8 \
5 1 1 1 107 4 1167 2628 29 17 42 ie
5 1 1 1 107 5 1217 2621 65 38 25 Phi)
5 1 1 1 107 6 1287 2621 171 39 42 Winn
5 1 1 1 107 7 1464 2620 69 56 25 Hl
5 1 1 1 107 8 1845 2633 31 15 62 KS
5 1 1 1 107 9 2070 2631 6 8 36 7
5 1 1 1 107 10 2175 2620 19 31 40 Oo
5 1 1 1 107 11 2232 2619 42 29 68 Sa
4 1 1 1 108 0 1214 2645 421 19 -1
5 1 1 1 108 1 1130 2647 45 16 7 ee
5 1 1 1 108 2 1214 2647 21 16 25 |
5 1 1 1 108 3 1244 2645 307 19 31 Pg
5 1 1 1 108 4 1632 2649 3 2 10 Y
5 1 1 1 108 5 1877 2649 23 15 38 Ay.
4 1 1 1 109 0 514 2649 1760 41 -1
5 1 1 1 109 1 514 2654 1 22 27 i
5 1 1 1 109 2 1163 2661 22 6 32 ee
5 1 1 1 109 3 1209 2650 152 40 47 TTT
5 1 1 1 109 4 1511 2649 25 39 29 ees
5 1 1 1 109 5 1578 2673 3 3 62 \
5 1 1 1 109 6 1600 2673 11 5 1 xs
5 1 1 1 109 7 1888 2668 4 6 43 ?
5 1 1 1 109 8 2052 2666 2 3 88 /
5 1 1 1 109 9 2176 2654 18 27 81 4
5 1 1 1 109 10 2232 2651 42 29 6 3
4 1 1 1 110 0 154 2672 2120 37 -1
5 1 1 1 110 1 125 2695 32 5 13 =e
5 1 1 1 110 2 214 2692 61 4 0 —_
5 1 1 1 110 3 500 2684 12 15 0 y
5 1 1 1 110 4 1164 2679 103 21 23 TT
5 1 1 1 110 5 1276 2674 201 31 43 TT
5 1 1 1 110 6 1486 2672 39 29 0 poT)
5 1 1 1 110 7 1587 2679 98 30 19 BL~
5 1 1 1 110 8 2040 2687 3 3 92 /
5 1 1 1 110 9 2176 2684 18 15 50 Qo
5 1 1 1 110 10 2232 2680 42 19 41 Ze
4 1 1 1 111 0 133 2694 2141 29 -1
5 1 1 1 111 1 133 2699 71 17 1 Se
5 1 1 1 111 2 376 2695 1 8 6 :
5 1 1 1 111 3 478 2714 1 4 37 ;
5 1 1 1 111 4 1089 2701 62 14 26 Oey
5 1 1 1 111 5 1261 2695 15 27 42 DS
5 1 1 1 111 6 1277 2694 198 29 24 RHE
5 1 1 1 111 7 1427 2690 48 37 24 HHH]
5 1 1 1 111 8 1482 2695 35 18 59 Pe
5 1 1 1 111 9 1606 2698 28 22 0 <4
5 1 1 1 111 10 1696 2702 10 6 0 hy
5 1 1 1 111 11 1852 2698 12 14 13 3
5 1 1 1 111 12 2024 2714 3 4 56 j
5 1 1 1 111 13 2162 2700 32 18 63 Lm
5 1 1 1 111 14 2232 2700 42 17 0 =Z%
4 1 1 1 112 0 132 2712 2142 33 -1
5 1 1 1 112 1 132 2725 3 18 31 yy
5 1 1 1 112 2 291 2718 4 1 12 —
5 1 1 1 112 3 350 2727 1 5 62 |
5 1 1 1 112 4 477 2720 1 3 76 f
5 1 1 1 112 5 1131 2736 4 7 16 Sy
5 1 1 1 112 6 1237 2718 156 22 31 RE
5 1 1 1 112 7 1407 2714 64 26 0 HT///////
5 1 1 1 112 8 1636 2720 25 17 39 OO
5 1 1 1 112 9 1839 2724 11 12 0 R
5 1 1 1 112 10 2019 2722 2 2 92 /
5 1 1 1 112 11 2162 2719 32 26 34 ew
5 1 1 1 112 12 2219 2712 55 24 18 50
4 1 1 1 113 0 231 2734 2043 12 -1
5 1 1 1 113 1 231 2738 34 4 18 me!
5 1 1 1 113 2 347 2740 1 3 0 /
5 1 1 1 113 3 1292 2740 73 6 17 =
5 1 1 1 113 4 1414 2740 23 6 36 =
5 1 1 1 113 5 1463 2741 1 3 35 L
5 1 1 1 113 6 1669 2740 37 6 43 ASE
5 1 1 1 113 7 2007 2743 2 3 39 /
5 1 1 1 113 8 2162 2740 9 5 0 e
5 1 1 1 113 9 2219 2734 55 11 75 caw
4 1 1 1 114 0 120 2736 1722 25 -1
5 1 1 1 114 1 120 2756 4 1 7 “
5 1 1 1 114 2 343 2744 4 15 3 Hl
5 1 1 1 114 3 1311 2745 3 7 56 x
5 1 1 1 114 4 1367 2744 16 6 21 Lf
5 1 1 1 114 5 1400 2747 62 9 43 [SE
5 1 1 1 114 6 1661 2740 54 21 66 Qs
5 1 1 1 114 7 1830 2736 12 17 0 S
4 1 1 1 115 0 1377 2758 460 10 -1
5 1 1 1 115 1 1377 2758 19 9 0 wt
5 1 1 1 115 2 1677 2758 57 9 81 OS
5 1 1 1 115 3 1834 2763 3 5 0 :
4 1 1 1 116 0 126 2753 1868 38 -1
5 1 1 1 116 1 126 2779 2 2 21 :
5 1 1 1 116 2 1035 2774 8 7 16 8
5 1 1 1 116 3 1100 2753 20 38 42 ie
5 1 1 1 116 4 1378 2767 19 13 44 5
5 1 1 1 116 5 1679 2766 79 15 66 Qos
5 1 1 1 116 6 1827 2770 6 10 86 /
5 1 1 1 116 7 1991 2770 3 3 87 /
4 1 1 1 117 0 129 2768 1705 32 -1
5 1 1 1 117 1 129 2781 103 14 24 ee
5 1 1 1 117 2 308 2781 3 13 48 :
5 1 1 1 117 3 1037 2779 93 19 15 ES
5 1 1 1 117 4 1368 2769 28 31 52 8
5 1 1 1 117 5 1688 2768 146 32 23 ANG
4 1 1 1 118 0 189 2792 1681 48 -1
5 1 1 1 118 1 189 2797 11 26 0 t
5 1 1 1 118 2 326 2801 15 13 24 ae
5 1 1 1 118 3 611 2814 2 3 0 .
5 1 1 1 118 4 989 2810 23 10 43 fs
5 1 1 1 118 5 1076 2804 103 24 41 NSA
5 1 1 1 118 6 1286 2818 2 2 59 ‘
5 1 1 1 118 7 1359 2798 29 33 70 8
5 1 1 1 118 8 1693 2798 24 42 24 5
5 1 1 1 118 9 1798 2792 72 29 84 VS
4 1 1 1 119 0 1058 2819 1018 12 -1
5 1 1 1 119 1 1058 2824 2 2 30 ~
5 1 1 1 119 2 1094 2820 73 11 6 ee
5 1 1 1 119 3 1200 2821 35 9 36 ee
5 1 1 1 119 4 1292 2819 6 6 0 Z
5 1 1 1 119 5 1364 2819 17 12 20 J
5 1 1 1 119 6 1699 2828 8 1 11 =
5 1 1 1 119 7 1839 2819 27 9 25 By.
5 1 1 1 119 8 1958 2820 6 9 39 /
5 1 1 1 119 9 2071 2824 5 3 66 r
4 1 1 1 120 0 235 2818 1842 32 -1
5 1 1 1 120 1 235 2839 2 2 60 .
5 1 1 1 120 2 293 2840 2 5 43 ;
5 1 1 1 120 3 502 2835 2 2 34 7
5 1 1 1 120 4 975 2827 161 19 15 fT
5 1 1 1 120 5 1263 2836 6 5 18 6
5 1 1 1 120 6 1280 2828 67 15 24 ee
5 1 1 1 120 7 1439 2818 23 32 38 oe
5 1 1 1 120 8 1714 2842 1 4 67 1
5 1 1 1 120 9 1827 2826 28 17 89 S
5 1 1 1 120 10 2070 2829 7 14 0 r
4 1 1 1 121 0 292 2806 1783 68 -1
5 1 1 1 121 1 241 2844 54 18 30 ‘|
5 1 1 1 121 2 982 2806 65 63 36 foe
5 1 1 1 121 3 1099 2851 20 6 38 SS
5 1 1 1 121 4 1345 2837 55 36 29 a
5 1 1 1 121 5 1407 2842 40 14 51 ==
5 1 1 1 121 6 1467 2844 9 9 56 2
5 1 1 1 121 7 1648 2859 9 11 36 io
5 1 1 1 121 8 1787 2824 72 45 69 LS
5 1 1 1 121 9 1947 2846 2 4 93 /
5 1 1 1 121 10 2071 2858 4 3 0 :
4 1 1 1 122 0 276 2853 1800 41 -1
5 1 1 1 122 1 276 2865 88 25 37 Free
5 1 1 1 122 2 998 2861 232 33 35 SS
5 1 1 1 122 3 1243 2862 50 26 52 EE
5 1 1 1 122 4 1310 2853 140 41 35 IO
5 1 1 1 122 5 1648 2868 52 26 54 QR
5 1 1 1 122 6 1713 2863 110 28 27 MT
5 1 1 1 122 7 1929 2876 2 4 17 /
5 1 1 1 122 8 2072 2884 4 4 39 :
4 1 1 1 123 0 283 2877 1632 41 -1
5 1 1 1 123 1 283 2892 4 11 85 i
5 1 1 1 123 2 934 2889 48 20 30 pe
5 1 1 1 123 3 995 2877 466 41 38 SLRS
5 1 1 1 123 4 1673 2888 92 20 26 [one
4 1 1 1 124 0 882 2896 819 60 -1
5 1 1 1 124 1 882 2916 15 13 28 a
5 1 1 1 124 2 1030 2901 141 55 24 at
5 1 1 1 124 3 1195 2908 157 22 13 Oe
5 1 1 1 124 4 1361 2900 126 29 33 SOS
5 1 1 1 124 5 1671 2896 30 34 68 (*
4 1 1 1 125 0 282 2927 1616 22 -1
5 1 1 1 125 1 282 2939 2 2 14 :
5 1 1 1 125 2 481 2942 2 2 14 RZ
5 1 1 1 125 3 886 2931 10 12 66 :
5 1 1 1 125 4 927 2935 1 5 48 4
5 1 1 1 125 5 1014 2927 69 21 21 Clee
5 1 1 1 125 6 1101 2928 86 19 29 eos
5 1 1 1 125 7 1202 2929 54 20 19 ec
5 1 1 1 125 8 1425 2928 97 20 46 WSS
5 1 1 1 125 9 1672 2933 2 4 87 \
5 1 1 1 125 10 1693 2928 1 4 80 |
5 1 1 1 125 11 1896 2933 2 3 89 /
4 1 1 1 126 0 352 2924 1530 78 -1
5 1 1 1 126 1 352 2951 5 21 95 i
5 1 1 1 126 2 882 2924 133 78 32 “Sky
5 1 1 1 126 3 1028 2941 120 49 30 Fe
5 1 1 1 126 4 1173 2946 30 35 12 Se
5 1 1 1 126 5 1221 2941 129 34 25 eae
5 1 1 1 126 6 1386 2955 12 17 21 wy
5 1 1 1 126 7 1460 2957 9 15 61 /
5 1 1 1 126 8 1545 2936 151 36 8 YY
5 1 1 1 126 9 1873 2960 9 8 25 /
4 1 1 1 127 0 335 2973 1532 32 -1
5 1 1 1 127 1 335 2973 22 17 68 =
5 1 1 1 127 2 455 2991 13 9 0 *
5 1 1 1 127 3 1056 2976 51 24 22 Ni
5 1 1 1 127 4 1250 2974 47 18 28 RS
5 1 1 1 127 5 1649 2973 31 26 62 Y
5 1 1 1 127 6 1700 2979 40 18 50 fx
5 1 1 1 127 7 1824 2978 43 27 56 Kf
4 1 1 1 128 0 418 2993 1786 32 -1
5 1 1 1 128 1 418 2998 5 15 7 i)
5 1 1 1 128 2 953 2999 62 17 49 SRS
5 1 1 1 128 3 1039 2988 26 41 43 SS
5 1 1 1 128 4 1227 2993 155 32 29 pn
5 1 1 1 128 5 1638 2993 34 26 47 WY
5 1 1 1 128 6 1685 2997 72 23 0 £8
5 1 1 1 128 7 1823 3002 28 17 4 BY
5 1 1 1 128 8 2188 3007 16 18 73 Z
4 1 1 1 129 0 378 3009 1826 35 -1
5 1 1 1 129 1 419 3019 83 21 0 Pos
5 1 1 1 129 2 882 3018 71 20 28 SS
5 1 1 1 129 3 1065 3024 65 18 28 a
5 1 1 1 129 4 1168 3021 52 16 36 Sr
5 1 1 1 129 5 1253 3014 133 28 28 ae
5 1 1 1 129 6 1668 3021 55 23 31 a
5 1 1 1 129 7 1753 3009 94 29 35 We
5 1 1 1 129 8 2188 3027 16 15 69 G
4 1 1 1 130 0 371 3029 1832 30 -1
5 1 1 1 130 1 371 3033 52 26 63 nil
5 1 1 1 130 2 535 3044 24 5 37 =
5 1 1 1 130 3 885 3043 9 8 0 -
5 1 1 1 130 4 979 3035 151 18 38 See
5 1 1 1 130 5 1188 3033 171 21 21 ey
5 1 1 1 130 6 1666 3038 78 21 75 7S
5 1 1 1 130 7 1775 3040 6 10 1 7
5 1 1 1 130 8 1799 3029 38 30 1 &/
5 1 1 1 130 9 2188 3045 15 6 19 =
4 1 1 1 131 0 372 3047 1832 21 -1
5 1 1 1 131 1 372 3051 8 12 66 ii
5 1 1 1 131 2 954 3051 45 9 37 =
5 1 1 1 131 3 1043 3050 31 11 27 ae
5 1 1 1 131 4 1232 3047 105 20 29 OH
5 1 1 1 131 5 1376 3058 3 3 0 ~
5 1 1 1 131 6 1662 3053 4 6 0 /
5 1 1 1 131 7 1736 3057 33 7 52 By
5 1 1 1 131 8 1804 3052 11 16 68 &
5 1 1 1 131 9 2188 3054 16 10 79 n
4 1 1 1 132 0 411 3051 1792 40 -1
5 1 1 1 132 1 411 3060 11 19 29 aL
5 1 1 1 132 2 900 3059 174 23 50 ASS
5 1 1 1 132 3 1158 3051 181 40 40 SF
5 1 1 1 132 4 1510 3067 4 11 50 ‘
5 1 1 1 132 5 1651 3073 3 6 53 /
5 1 1 1 132 6 1744 3052 78 32 33 PA
5 1 1 1 132 7 2188 3067 15 12 26 i
4 1 1 1 133 0 914 3077 1321 22 -1
5 1 1 1 133 1 954 3080 136 19 44 ERE
5 1 1 1 133 2 1121 3083 45 15 39 EE
5 1 1 1 133 3 1176 3073 58 35 45 SSS
5 1 1 1 133 4 1643 3088 2 3 0 (
5 1 1 1 133 5 1736 3083 67 15 63 dk
5 1 1 1 133 6 2188 3081 47 16 37 Ales
4 1 1 1 134 0 350 3086 1873 44 -1
5 1 1 1 134 1 350 3102 21 16 0 fa
5 1 1 1 134 2 883 3101 35 17 38 =
5 1 1 1 134 3 949 3098 137 19 37 aS
5 1 1 1 134 4 1220 3086 98 36 39 ae
5 1 1 1 134 5 1616 3099 45 20 52 <>
5 1 1 1 134 6 1726 3112 3 4 68 J
5 1 1 1 134 7 1763 3090 36 40 68 &
5 1 1 1 134 8 2188 3109 16 18 30 Zz
4 1 1 1 135 0 350 3117 1873 28 -1
5 1 1 1 135 1 350 3120 13 22 78 il
5 1 1 1 135 2 416 3124 3 15 53 j
5 1 1 1 135 3 923 3119 23 21 27 ——
5 1 1 1 135 4 959 3117 60 27 21 ==
5 1 1 1 135 5 1037 3118 61 20 23 SS
5 1 1 1 135 6 1108 3120 110 23 24 an
5 1 1 1 135 7 1267 3119 29 15 25 ee
5 1 1 1 135 8 1314 3138 8 7 79 Z
5 1 1 1 135 9 1606 3118 58 25 26 Si
5 1 1 1 135 10 1710 3118 15 24 90 /
5 1 1 1 135 11 1752 3118 25 26 41 &
5 1 1 1 135 12 2188 3127 35 9 0 Gis
4 1 1 1 136 0 351 3130 1853 38 -1
5 1 1 1 136 1 351 3140 13 11 28 J
5 1 1 1 136 2 416 3141 12 21 67 he
5 1 1 1 136 3 553 3140 7 28 0 ny
5 1 1 1 136 4 885 3140 67 17 55 >
5 1 1 1 136 5 967 3141 89 25 28 Sy
5 1 1 1 136 6 1103 3130 22 28 57 3
5 1 1 1 136 7 1170 3141 177 21 0 BOS
5 1 1 1 136 8 1587 3151 2 4 50 i
5 1 1 1 136 9 1632 3138 8 22 31 J
5 1 1 1 136 10 1707 3141 62 20 54 @e
5 1 1 1 136 11 2083 3142 11 18 30 <
5 1 1 1 136 12 2188 3138 16 23 57 5
4 1 1 1 137 0 646 3155 1557 26 -1
5 1 1 1 137 1 646 3159 36 15 71 Ze
5 1 1 1 137 2 920 3155 77 18 40 RS
5 1 1 1 137 3 1010 3155 349 20 45 RSP
5 1 1 1 137 4 1617 3160 14 13 56 A
5 1 1 1 137 5 1708 3169 2 3 38 2
5 1 1 1 137 6 1733 3156 29 25 80 &
5 1 1 1 137 7 2188 3162 15 17 26 5
4 1 1 1 138 0 338 3167 1865 26 -1
5 1 1 1 138 1 338 3187 3 3 9 E
5 1 1 1 138 2 646 3177 36 12 0 <c
5 1 1 1 138 3 968 3178 11 13 34 RR
5 1 1 1 138 4 992 3167 83 21 54 SS
5 1 1 1 138 5 1089 3167 94 23 35 Sea
5 1 1 1 138 6 1223 3184 5 5 32 er
5 1 1 1 138 7 1244 3168 53 20 19 RR
5 1 1 1 138 8 1327 3170 21 16 57 SRR
5 1 1 1 138 9 1700 3173 47 20 48 TSS
5 1 1 1 138 10 2083 3171 11 10 0 s
5 1 1 1 138 11 2188 3180 15 12 33 Q
4 1 1 1 139 0 337 3181 1866 36 -1
5 1 1 1 139 1 337 3191 4 11 96 i
5 1 1 1 139 2 388 3199 5 8 54 Z
5 1 1 1 139 3 475 3198 7 6 8 .
5 1 1 1 139 4 646 3191 36 11 66 a<
5 1 1 1 139 5 971 3189 46 9 0 os
5 1 1 1 139 6 1027 3188 71 22 35 er
5 1 1 1 139 7 1167 3181 43 36 22 SS
5 1 1 1 139 8 1229 3186 144 19 40 eS
5 1 1 1 139 9 1687 3189 38 19 59 FR
5 1 1 1 139 10 2083 3192 11 7 1 o
5 1 1 1 139 11 2188 3195 15 15 53 2
4 1 1 1 140 0 338 3197 1865 30 -1
5 1 1 1 140 1 355 3206 17 13 0 a
5 1 1 1 140 2 645 3203 37 14 51 a=
5 1 1 1 140 3 1003 3209 76 10 40 TST
5 1 1 1 140 4 1099 3206 33 15 56 SS
5 1 1 1 140 5 1209 3205 65 12 6 ———
5 1 1 1 140 6 1376 3204 9 6 22 x
5 1 1 1 140 7 1389 3197 46 30 22 Sy,
5 1 1 1 140 8 1505 3208 3 15 12 {
5 1 1 1 140 9 1707 3203 28 14 55 RY
5 1 1 1 140 10 2083 3203 11 7 20 °
5 1 1 1 140 11 2188 3211 15 12 36 Py
4 1 1 1 141 0 338 3203 1899 43 -1
5 1 1 1 141 1 338 3215 64 31 36 iy)
5 1 1 1 141 2 531 3235 3 2 41 ;
5 1 1 1 141 3 667 3203 15 38 18 oo
5 1 1 1 141 4 1021 3218 45 22 53 SAS
5 1 1 1 141 5 1303 3224 67 14 38 eK
5 1 1 1 141 6 1400 3216 57 19 46 RS
5 1 1 1 141 7 1704 3207 13 35 0 ay
5 1 1 1 141 8 2083 3221 11 7 0 “
5 1 1 1 141 9 2236 3226 1 3 39 i
4 1 1 1 142 0 330 3232 1893 43 -1
5 1 1 1 142 1 330 3239 4 22 40 1
5 1 1 1 142 2 363 3232 8 18 0 u
5 1 1 1 142 3 531 3239 7 8 20 8
5 1 1 1 142 4 645 3235 15 33 23 Z
5 1 1 1 142 5 671 3236 11 21 64 3
5 1 1 1 142 6 1045 3237 109 23 56 “SS
5 1 1 1 142 7 1208 3236 186 25 15 ee
5 1 1 1 142 8 1411 3236 46 24 19 SG
5 1 1 1 142 9 1577 3252 9 20 81 i
5 1 1 1 142 10 1679 3234 36 41 56 &
5 1 1 1 142 11 2057 3239 36 19 62 zo
5 1 1 1 142 12 2188 3235 35 24 0 g)2
4 1 1 1 143 0 338 3258 1865 36 -1
5 1 1 1 143 1 338 3267 35 14 23 say
5 1 1 1 143 2 454 3279 10 6 0 ¢
5 1 1 1 143 3 645 3260 32 29 31 Le
5 1 1 1 143 4 1117 3261 59 24 31 ORR
5 1 1 1 143 5 1332 3266 60 16 33 SS
5 1 1 1 143 6 1408 3261 128 25 48 SRR
5 1 1 1 143 7 1582 3261 115 30 45 ES
5 1 1 1 143 8 2057 3258 37 26 52 Su
5 1 1 1 143 9 2184 3261 19 33 34 3
4 1 1 1 144 0 343 3287 1860 24 -1
5 1 1 1 144 1 343 3297 2 3 20 ‘
5 1 1 1 144 2 434 3287 6 6 62 x
5 1 1 1 144 3 646 3290 36 16 73 <0
5 1 1 1 144 4 1060 3305 2 2 71 x
5 1 1 1 144 5 1182 3291 24 9 40 SQ
5 1 1 1 144 6 1247 3285 142 23 45 SS
5 1 1 1 144 7 1505 3290 66 18 53 TR
5 1 1 1 144 8 1629 3291 32 11 40 (BA
5 1 1 1 144 9 2057 3289 37 11 0 a
5 1 1 1 144 10 2188 3291 15 20 75 =
4 1 1 1 145 0 645 3305 1448 26 -1
5 1 1 1 145 1 645 3312 39 14 45 52
5 1 1 1 145 2 1055 3310 35 7 48 te.
5 1 1 1 145 3 1217 3307 204 24 23 SLs
5 1 1 1 145 4 1500 3308 32 12 23 eh
5 1 1 1 145 5 2057 3313 36 10 86 w<
4 1 1 1 146 0 344 3327 1750 26 -1
5 1 1 1 146 1 344 3335 2 2 61 4
5 1 1 1 146 2 472 3342 2 4 0 .
5 1 1 1 146 3 645 3331 37 16 76 o2
5 1 1 1 146 4 1096 3329 7 7 31 7
5 1 1 1 146 5 1269 3329 28 17 55 SS
5 1 1 1 146 6 1344 3346 4 5 71 —
5 1 1 1 146 7 1410 3334 45 15 24 Ree
5 1 1 1 146 8 1468 3327 96 26 41 Nin
5 1 1 1 146 9 1654 3332 4 2 63 S
5 1 1 1 146 10 2057 3329 37 15 66 ro
4 1 1 1 147 0 646 3316 1577 85 -1
5 1 1 1 147 1 646 3351 35 9 83 ==
5 1 1 1 147 2 1257 3364 14 10 49 a
5 1 1 1 147 3 1313 3350 55 23 44 we
5 1 1 1 147 4 1531 3316 14 58 96 |
5 1 1 1 147 5 1559 3355 9 17 57 i
5 1 1 1 147 6 1588 3344 66 28 29 NS
5 1 1 1 147 7 2057 3350 37 9 63 ve
5 1 1 1 147 8 2186 3330 37 71 33 CGSection 68
Page 68 of 118
po PROPOSED CONCRETE SLAB AND UPTURN CLAD IN ;
| STONE: WITH PROPOSED GLASS BALUSTRADE.
INGROUND PLANTER TO THE INTERNAL FACE OF THE
| HOB WITH NON CUMABLE PLANT MATERIAL
RETAINING WALL TO BE PARTIALLY DEMOLISHED
C Lr eT i ie 7 .
( Yh, B IN \\ \\\ | \il I] l yy Vy S70 stang
| AWK I) | eae es
: Fs ff :h HTTP saa a” Lane | | £
LALA 63811 [Nel FN epee w }
Uf Wl eA NT \ ITRS)\\ Visa tas rt h a>
| PMG FO ee premeenenranemenenenamnes
( W1/ gs yn) HIIT/ \ Pt Wi f tye coe NY Ww 3 \ PROPOSED STONE BENCH TO MATCH EXISTING BENCH
9 df, ey] KE / (| + lg mis a A i ee . \ B 7 PROPOSED STONE CLAD RETAINING WALL TO MATCH
( Ja] Bestia) |)]// || \ ec ieee aM BAS! Theceealh
| OY ie) eee / AN a UPS exsn stone enc }
( \) f hs) hj se HU Ii He eer} 0 8 Wf 1k [i ey Ly | i PH POT EE fe EXISTING STONE RETAINING WALL
' & / is) We f (Mets ea y 4 hp pe i a i i al |} WH EXISTING STAIRS AND RETAINING WALL
( / |€sff AR Jaypee. Sos Ce eS Le BEd ((\P\ ' ae
PROPOSED GARDEN BED WITH Alpinia caerulea f ae y yh) ‘ A or $91 | nl By Nal E | al. 81 EY \\\ ex cS
Ses A at ae ae HU) fs
din Sedincuichint lewrencia ioncke, ] BRE A we or diay |). ORR | URL A pe Booby LAY} See} | Ri * x.
( f A PR A) ee aL gf Tete ey] oe Had ele es g Bf f7 a \e ( Be Bre
ace ae cael ev 1 oka anger a MM Ae oe Ate (7.78 line
Banksia aemula, Banksia robur, Myoporum | f Ny ADE 1] ef byt Ly Barer iA StI | it + \ j } ys! ] 7) Wes ADR
oT ten cocae tee | yf L/S + eh Bae ia Vee lenge Pe a \\gr/e8 ea is
comericrereeeeme N/R (ata Es eS E AG pam
PROPOSED GARDEN BED WITH Acmena hemampro, 7 4 eT ey Nal taal 18 Stat PSY EP | Pt , \\3 ) KB SS SE
~ / Kh [88 \ sy 9q205 07/1) lies VA SS AP) | Fp] BA = Se
cowntirorancmonao /// fe) | Bag SO OPN Pwd At) Wey)! Spaz ws
A 3 iT Mpisy 1% Wy ON: I HH eos SSS
kee yy Bs / | | PRI | PPas/ ae SD fii \\ * ANS TE || E {ff S [+ SSS ——
se Cae ee | bl / 19 (/ a eee ot TS Kle f 27 EL KCBA TEES —
PROPOSED Eucalyptus umbra ge ly BF al (a cal | TIA Z if, LH * ' i g f HLS GARDEN SSS SS.
Age “a pith p Pll Lf? f DL OY ey Ct Ie t+
¢ is 39) BF) x7 | i ; CG ) he is nf f 7) 1 ATs i
mcm TLE eT YN | DT) SSS SSSA}
YR UT IS SUT er SSS Ss]
Ue LP SS ean SSS SSS
{ be TT IT | eh |e |PK KY SL PS SSeS ES
| sed /*) Pipe | Mii ii hi wy Te SS Les a ) S35
f/ | % | #41 | hes J RE yh a ; SSS SS My
ig KANN at VA 2 fA , SSS —— /
e aye e oN Ko we / : ie ig } > le
By | |e | | 33/2035 /) i Uf SS / jis SS ‘ SSss5 ——— ——~/
ae | | | \? gy fy / ¥ v7. ) SSS SS Eee
ete OY rest ticnn Ee 7 g BEES —— se
ie" See a a// y FERS ——— “Sy
<=} ~S x EXISTING TIMBER DECK / ‘ == SS Scyf,
ME RENWAL f af ( —— PSF 4
a x a ee Be EXISTING GARDEN SS A -:
iP, fetetstet, 5 ee WEL at tt RS ssf
li JJ ROM WY TMU YVY & iN / wS ;
) ) ho SO é YY jy My py lj = £7 AGGSRESKR | / NOTE
Ke ere yy YY irs, Up 5 5 wes SNSSAAASS / ALL REINFORCED CONCRETE SLABS AND RETAINING.
YY Yi Yyy Yj YY ip Kir a yr SS SS SS \N ‘i ; WALLS TO ENGINEERS DETAIL.
BQ UW WWW)JU Pax». —DNEWM4O WA SSSS[| SSS Av
PRELIMINARY
nee RESIDENCE AT 12 PARK RD, NOOSA HEADS M2828 uote na onsteo ne ounonne cease a T\ wane sons ona
i ee ee = =<... ee =—— ComIACT SOME DEHN OCCUR EME AOXCAE AND CONG DOC LANDSCAPE PLAN | } Seale sasowat pa ona
=— PENINSULAR ead Stee TRUSTEE {ates tor ents / a sea ono 6 COP ROM
FOR THE PENINSULA AVIATION TRUST
Page 68 of 118Section 69
Page 69 of 118
¢ )
S 2 = 2
( 3 3 )
> = 4
( g 3 )
> g 5
go z P
¢ 2 33 § 5
( & 26 z )
\ s o8 = ‘
( 3 sa aR d
33 2 YS ( 2 ae gs )
Ss ¢ & 28 3 d
38 NS > q gz = :
ne SS ( > a6 22 )
38 Be ee yo oR ( 2 a Q
os tt e ~-> ®@ © 5 = 8 BF Fe F FT BE SEBRRYRB Ww ? :
cow 88 88 83 8 § § § 8 8 8 8. 8.8 8 \ © wa §$ /
£ om ( onan ) om 5
ra e RARARRAAARARR ARRAN 4 > ee i
oo ° i NNR ) OUNDA' a eB Be Fe Bae ElE S
9 >Z SSS curt “5 88 88 €B Es ee E BE )
ae - CORRARACCOCCCQCROEES m ( )
ef =
5 1 1 1 24 3 707 416 273 21 2 RAAT
5 1 1 1 24 4 1209 430 65 12 0 ——_
5 1 1 1 24 5 1456 433 10 3 49 =
5 1 1 1 24 6 1602 441 31 10 21 sty
5 1 1 1 24 7 1640 444 72 2 21 inert
5 1 1 1 24 8 1723 443 98 12 11 epee,
5 1 1 1 24 9 1847 452 2 2 17 Tt
5 1 1 1 24 10 2400 465 2 2 0 ,
4 1 1 1 25 0 246 414 1626 48 -1
5 1 1 1 25 1 246 414 48 17 67 35/2
5 1 1 1 25 2 706 422 101 16 0 OIE
5 1 1 1 25 3 856 428 164 12 0 ISSA
5 1 1 1 25 4 1142 440 72 4 20 “Le
5 1 1 1 25 5 1286 447 18 2 93 =
5 1 1 1 25 6 1456 449 36 5 21 a
5 1 1 1 25 7 1544 451 2 2 0 »
5 1 1 1 25 8 1675 450 44 8 45 Pt
5 1 1 1 25 9 1782 459 32 2 49 SEMA
5 1 1 1 25 10 1840 458 17 4 31 Pete
5 1 1 1 25 11 1862 443 7 26 41 ae
4 1 1 1 26 0 246 423 2161 59 -1
5 1 1 1 26 1 246 423 17 6 26 ae
5 1 1 1 26 2 481 427 37 16 27 -oO
5 1 1 1 26 3 706 432 225 17 0 RRRRRRRRARRRARRAAR
5 1 1 1 26 4 937 436 42 15 59 RG
5 1 1 1 26 5 1019 442 4 6 15 Tt
5 1 1 1 26 6 1541 458 1 5 3 ,
5 1 1 1 26 7 1616 456 39 9 13 Het]
5 1 1 1 26 8 1682 463 52 2 26 aL
5 1 1 1 26 9 1741 457 31 12 31 ON
5 1 1 1 26 10 1789 466 34 4 27 Seah
5 1 1 1 26 11 1847 465 18 4 8 WIGS
5 1 1 1 26 12 2405 473 2 9 27 \
4 1 1 1 27 0 245 432 2157 58 -1
5 1 1 1 27 1 245 432 20 6 45 ig
5 1 1 1 27 2 704 440 274 18 29 Rn
5 1 1 1 27 3 985 431 18 36 44 |
5 1 1 1 27 4 1026 442 78 18 38 SE
5 1 1 1 27 5 1456 460 36 9 49 oo
5 1 1 1 27 6 1646 471 41 2 17 Pacey
5 1 1 1 27 7 1695 471 26 2 19 eat
5 1 1 1 27 8 1735 450 19 35 28 ee
5 1 1 1 27 9 1797 474 2 2 11 re
5 1 1 1 27 10 1811 472 17 5 28 ks
5 1 1 1 27 11 1840 473 46 3 9 edo
5 1 1 1 27 12 2400 488 2 2 0 :
4 1 1 1 28 0 249 437 1718 46 -1
5 1 1 1 28 1 249 437 13 8 62 3%
5 1 1 1 28 2 481 449 8 3 0 .
5 1 1 1 28 3 703 442 268 27 2 RRRRRRRRRRRRRRRRREAAY
5 1 1 1 28 4 1026 447 15 25 20 by
5 1 1 1 28 5 1256 453 22 25 66 SS
5 1 1 1 28 6 1336 467 2 5 48 ‘
5 1 1 1 28 7 1546 470 2 2 65 >
5 1 1 1 28 8 1608 471 25 6 30 Pista
5 1 1 1 28 9 1653 470 17 10 57 1°
5 1 1 1 28 10 1682 471 46 9 15 METAS]
5 1 1 1 28 11 1738 473 54 10 19 Dahan
5 1 1 1 28 12 1804 480 17 3 35 eed
5 1 1 1 28 13 1847 479 105 4 27 rte
4 1 1 1 29 0 246 442 2161 63 -1
5 1 1 1 29 1 278 442 16 17 17 oo
5 1 1 1 29 2 503 448 15 13 83 z
5 1 1 1 29 3 702 454 144 18 19 RYN
5 1 1 1 29 4 1135 465 4 11 88 )
5 1 1 1 29 5 1487 475 5 2 5 -
5 1 1 1 29 6 1624 478 23 10 0 Ab
5 1 1 1 29 7 1661 484 1 4 30 ee
5 1 1 1 29 8 1705 484 1 6 19 te
5 1 1 1 29 9 1731 480 40 11 27 LD
5 1 1 1 29 10 1782 483 17 7 10 Ra
5 1 1 1 29 11 1812 488 31 3 35 AE
5 1 1 1 29 12 1884 487 3 3 33 UG,
5 1 1 1 29 13 1928 488 2 2 0 in
5 1 1 1 29 14 1958 488 2 2 31 Je
5 1 1 1 29 15 1986 488 2 2 0 27
5 1 1 1 29 16 2405 496 2 9 32 )
4 1 1 1 30 0 258 456 2144 57 -1
5 1 1 1 30 1 258 456 5 4 47 g
5 1 1 1 30 2 481 464 11 4 77 -
5 1 1 1 30 3 701 463 31 9 12 RAZ
5 1 1 1 30 4 737 459 77 27 0 ERAREAE
5 1 1 1 30 5 814 459 41 27 0 EEE
5 1 1 1 30 6 854 467 77 12 0 EEE
5 1 1 1 30 7 1134 481 2 2 38 <
5 1 1 1 30 8 1456 479 10 8 49 °
5 1 1 1 30 9 1544 490 2 3 80 (
5 1 1 1 30 10 1615 488 55 2 25 PAP
5 1 1 1 30 11 1682 492 31 4 27 tees
5 1 1 1 30 12 1726 492 52 3 15 ME
5 1 1 1 30 13 1789 491 33 7 2 Nee
5 1 1 1 30 14 1846 495 150 4 26 aes,
5 1 1 1 30 15 2400 511 2 2 0 -
4 1 1 1 31 0 257 460 1753 51 -1
5 1 1 1 31 1 257 460 37 13 34 pans]
5 1 1 1 31 2 687 464 56 30 0 RRR
5 1 1 1 31 3 820 470 75 16 0 RRR
5 1 1 1 31 4 1315 484 23 15 0 <
5 1 1 1 31 5 1542 500 2 2 21 )
5 1 1 1 31 6 1660 500 17 2 34 aca
5 1 1 1 31 7 1689 499 32 3 14 Teese
5 1 1 1 31 8 1732 500 9 4 23 ae
5 1 1 1 31 9 1767 503 3 2 42 ar
5 1 1 1 31 10 1797 501 16 4 12 NBN
5 1 1 1 31 11 1826 502 17 3 29 ap
5 1 1 1 31 12 1869 502 4 3 22 ge
5 1 1 1 31 13 1884 502 9 9 0 L*
5 1 1 1 31 14 1899 502 9 9 0 Ls
5 1 1 1 31 15 1913 483 25 33 0 lact
5 1 1 1 31 16 1942 502 47 10 7 sll
4 1 1 1 32 0 259 473 2148 55 -1
5 1 1 1 32 1 259 473 5 2 45 :
5 1 1 1 32 2 513 476 5 3 25 -
5 1 1 1 32 3 785 474 184 27 0 CUSSEISSSISA
5 1 1 1 32 4 1138 488 1 6 92 )
5 1 1 1 32 5 1311 488 27 16 76 WS
5 1 1 1 32 6 1446 488 21 25 18 ry
5 1 1 1 32 7 1541 503 1 6 89 (
5 1 1 1 32 8 1682 507 2 3 35 et
5 1 1 1 32 9 1695 505 18 6 1 Bec
5 1 1 1 32 10 1726 507 2 2 1 |
5 1 1 1 32 11 1744 507 33 7 30 pase
5 1 1 1 32 12 1818 509 3 3 36 Ry
5 1 1 1 32 13 1847 509 3 3 45 Me
5 1 1 1 32 14 1884 501 28 25 46 res
5 1 1 1 32 15 1913 509 61 11 20 Dearie
5 1 1 1 32 16 1986 517 33 3 13 ores
5 1 1 1 32 17 2405 519 2 9 90 )
4 1 1 1 33 0 259 475 2143 61 -1
5 1 1 1 33 1 259 475 35 10 16 Ban
5 1 1 1 33 2 481 479 36 17 46 ey
5 1 1 1 33 3 685 477 116 31 0 PARAL
5 1 1 1 33 4 819 488 155 16 13 RRNA
5 1 1 1 33 5 1027 493 16 16 0 )
5 1 1 1 33 6 1132 498 4 6 49 Q
5 1 1 1 33 7 1544 513 2 3 84 (
5 1 1 1 33 8 1659 513 48 4 27 PSG
5 1 1 1 33 9 1718 514 17 3 29 Sb
5 1 1 1 33 10 1752 515 19 8 22 ei
5 1 1 1 33 11 1795 515 19 5 21 NL
5 1 1 1 33 12 1825 516 3 4 10 aa
5 1 1 1 33 13 1854 517 33 3 0 Reel
5 1 1 1 33 14 1965 524 2 3 0 -
5 1 1 1 33 15 2008 524 2 2 61 3
5 1 1 1 33 16 2400 534 2 2 62 Q
4 1 1 1 34 0 258 486 1761 50 -1
5 1 1 1 34 1 278 488 16 7 42 5
5 1 1 1 34 2 481 490 11 8 31 °
5 1 1 1 34 3 695 495 143 16 48 RN
5 1 1 1 34 4 1135 505 4 12 39 5
5 1 1 1 34 5 1327 509 11 13 20 \
5 1 1 1 34 6 1542 523 2 2 34 \
5 1 1 1 34 7 1667 521 96 8 13 Batak
5 1 1 1 34 8 1789 524 32 3 8 Pesta
5 1 1 1 34 9 1840 523 25 11 12 OY,
5 1 1 1 34 10 1877 524 16 10 0 Tae
5 1 1 1 34 11 1929 521 23 15 12 +
5 1 1 1 34 12 1970 521 49 14 16 ee
4 1 1 1 35 0 513 502 1894 49 -1
5 1 1 1 35 1 513 502 5 3 0 .
5 1 1 1 35 2 728 502 59 12 2 RRR
5 1 1 1 35 3 793 502 55 16 0 RRRR
5 1 1 1 35 4 847 504 49 14 0 ARR
5 1 1 1 35 5 998 513 3 6 0 [
5 1 1 1 35 6 1456 519 10 9 94 >
5 1 1 1 35 7 1674 528 18 4 30 9
5 1 1 1 35 8 1704 529 31 3 18 Ad
5 1 1 1 35 9 1748 529 23 9 31 es
5 1 1 1 35 10 1906 538 105 4 8 “120-1000,”
5 1 1 1 35 11 2405 542 2 9 42 )
4 1 1 1 36 0 262 497 2142 63 -1
5 1 1 1 36 1 277 497 17 15 44 2)
5 1 1 1 36 2 481 508 11 11 89 ®
5 1 1 1 36 3 694 505 259 22 2 BRR:
5 1 1 1 36 4 998 511 63 21 60 PHI]
5 1 1 1 36 5 1132 525 2 2 69 4
5 1 1 1 36 6 1456 534 10 3 69 =
5 1 1 1 36 7 1544 536 2 3 0 ;
5 1 1 1 36 8 1667 536 47 3 38 eins
5 1 1 1 36 9 1726 537 3 2 54 ol
5 1 1 1 36 10 1740 537 52 8 9 Peepers
5 1 1 1 36 11 1804 538 17 6 0 NETS
5 1 1 1 36 12 1857 521 22 32 29 ip,
5 1 1 1 36 13 1884 546 46 3 20 eee
5 1 1 1 36 14 1943 546 17 2 13 ae
5 1 1 1 36 15 2400 555 4 5 80 2
4 1 1 1 37 0 259 508 1751 48 -1
5 1 1 1 37 1 259 512 6 2 28 2
5 1 1 1 37 2 696 508 250 30 0 QRRRRRRARARARARARAG
5 1 1 1 37 3 1015 512 15 26 24 I!
5 1 1 1 37 4 1544 542 2 3 84 5
5 1 1 1 37 5 1689 543 17 3 22 ns
5 1 1 1 37 6 1732 543 4 3 27 ie
5 1 1 1 37 7 1768 546 17 2 0 PRE
5 1 1 1 37 8 1797 546 17 3 0 RN
5 1 1 1 37 9 1840 546 3 3 0 C
5 1 1 1 37 10 1921 553 3 3 0 q
5 1 1 1 37 11 1980 553 30 3 34 aS
4 1 1 1 38 0 258 518 1746 45 -1
5 1 1 1 38 1 258 518 7 3 0 &
5 1 1 1 38 2 692 522 295 19 33 BOA
5 1 1 1 38 3 1138 533 1 7 75 )
5 1 1 1 38 4 1541 546 3 9 0 e
5 1 1 1 38 5 1682 551 32 3 15 alien
5 1 1 1 38 6 1725 551 66 9 5 ae
5 1 1 1 38 7 1847 553 69 10 10 rane
5 1 1 1 38 8 1928 554 17 9 0 ah
5 1 1 1 38 9 2001 560 3 3 43 t
4 1 1 1 39 0 259 540 1797 45 -1
5 1 1 1 39 1 259 540 5 8 45 3
5 1 1 1 39 2 481 544 11 4 57 ~
5 1 1 1 39 3 689 550 35 12 23 PY
5 1 1 1 39 4 1009 556 10 14 51 ce
5 1 1 1 39 5 1331 570 7 6 19 x
5 1 1 1 39 6 1541 569 3 9 18 ¢
5 1 1 1 39 7 1660 573 3 2 13 a7
5 1 1 1 39 8 1675 573 2 2 17 ot
5 1 1 1 39 9 1689 573 32 3 0 srere
5 1 1 1 39 10 1733 573 2 2 33 baa
5 1 1 1 39 11 1768 576 2 2 36 lt
5 1 1 1 39 12 1782 576 32 2 38 STB
5 1 1 1 39 13 1833 558 21 27 50 AN
5 1 1 1 39 14 1952 583 9 2 20 a
5 1 1 1 39 15 2044 583 12 2 40 |
4 1 1 1 40 0 259 552 2143 53 -1
5 1 1 1 40 1 259 552 3 1 0 ‘
5 1 1 1 40 2 688 557 265 19 0 RRRRRARRARRRARRARAGG
5 1 1 1 40 3 965 570 18 3 14 1
5 1 1 1 40 4 1000 567 14 7 20 ISS
5 1 1 1 40 5 1062 564 2 9 92 )
5 1 1 1 40 6 1719 586 153 9 24 TRE
5 1 1 1 40 7 2400 603 2 2 33 Q
4 1 1 1 41 0 258 555 1763 51 -1
5 1 1 1 41 1 258 555 7 6 0 &
5 1 1 1 41 2 689 564 164 16 46 WYNN
5 1 1 1 41 3 943 577 3 3 21 fo
5 1 1 1 41 4 1138 579 1 7 67 )
5 1 1 1 41 5 1327 572 8 27 32 XN
5 1 1 1 41 6 1667 594 90 4 12 eRe
5 1 1 1 41 7 1775 598 31 2 9 Feb
5 1 1 1 41 8 1862 596 2 4 35 x
5 1 1 1 41 9 2012 597 9 9 10 7
4 1 1 1 42 0 258 567 2149 53 -1
5 1 1 1 42 1 258 567 5 2 11 e
5 1 1 1 42 2 685 571 239 16 25 RRRRRARRRRRRARARAGE
5 1 1 1 42 3 934 579 49 11 19 f+
5 1 1 1 42 4 1135 587 2 4 67 )
5 1 1 1 42 5 1321 579 17 25 63 NY
5 1 1 1 42 6 1541 596 1 5 77 (
5 1 1 1 42 7 1675 602 32 3 30 rete
5 1 1 1 42 8 1719 602 46 3 0 ether
5 1 1 1 42 9 1840 597 32 13 27 LR
5 1 1 1 42 10 1921 605 23 7 20 a
5 1 1 1 42 11 2405 611 2 9 89 )
4 1 1 1 43 0 686 578 1716 50 -1
5 1 1 1 43 1 686 578 244 16 49 NNN
5 1 1 1 43 2 987 585 33 13 46 ARS
5 1 1 1 43 3 1330 598 2 3 20 \
5 1 1 1 43 4 1682 609 61 3 0 gtetete
5 1 1 1 43 5 1755 609 2 2 9 te
5 1 1 1 43 6 1770 609 2 4 42 ty
5 1 1 1 43 7 1804 612 2 2 0 tilt
5 1 1 1 43 8 1833 611 32 3 23 ae
5 1 1 1 43 9 2400 626 2 2 0 é
4 1 1 1 44 0 683 584 1275 38 -1
5 1 1 1 44 1 683 584 239 17 16 BRRRARARRRARARRRAG
5 1 1 1 44 2 965 599 18 3 23 111
5 1 1 1 44 3 1008 597 6 4 29 Piet
5 1 1 1 44 4 1524 607 24 9 0 >
5 1 1 1 44 5 1689 617 32 2 10 feet
5 1 1 1 44 6 1826 615 31 7 30 aN
5 1 1 1 44 7 1946 599 8 28 0 Fe
4 1 1 1 45 0 682 591 1725 52 -1
5 1 1 1 45 1 682 591 237 16 34 LSS
5 1 1 1 45 2 1138 603 1 6 89 )
5 1 1 1 45 3 1542 615 2 2 23 ?
5 1 1 1 45 4 1675 617 23 9 0 wee
5 1 1 1 45 5 1726 624 17 2 0 The
5 1 1 1 45 6 1770 620 51 9 17 eon
5 1 1 1 45 7 1833 620 36 9 17 NO
5 1 1 1 45 8 2405 634 2 9 31 \
4 1 1 1 46 0 681 598 1724 49 -1
5 1 1 1 46 1 681 598 250 19 0 BRARRAARARRRRAAAY
5 1 1 1 46 2 1000 606 5 5 0 y
5 1 1 1 46 3 1135 610 2 4 14 )
5 1 1 1 46 4 1541 619 1 5 92 (
5 1 1 1 46 5 1748 626 95 10 7 wettest!
5 1 1 1 46 6 1917 623 26 15 27 i
5 1 1 1 46 7 2403 644 2 3 92 )
4 1 1 1 47 0 681 605 1263 41 -1
5 1 1 1 47 1 681 605 243 16 22 RNIN
5 1 1 1 47 2 1543 626 5 7 0 »
5 1 1 1 47 3 1689 631 17 3 28 Sea
5 1 1 1 47 4 1726 632 17 9 25 abet
5 1 1 1 47 5 1755 634 59 7 1 tsa
5 1 1 1 47 6 1833 641 17 3 0 tett
5 1 1 1 47 7 1861 641 4 3 0 ty
5 1 1 1 47 8 1874 620 12 33 59 N
5 1 1 1 47 9 1884 638 4 5 44 |
4 1 1 1 48 0 680 612 1263 44 -1
5 1 1 1 48 1 680 612 232 16 0 RRRRAARRAARARRRAS
5 1 1 1 48 2 922 620 9 11 54 |
5 1 1 1 48 3 931 605 10 30 21 |
5 1 1 1 48 4 1006 624 8 6 0 y
5 1 1 1 48 5 1138 626 1 6 56 )
5 1 1 1 48 6 1298 615 15 30 50 SS
5 1 1 1 48 7 1542 634 4 6 65 ?
5 1 1 1 48 8 1696 638 17 3 49 os
5 1 1 1 48 9 1763 645 31 3 25 strep
5 1 1 1 48 10 1804 641 17 7 53 th
5 1 1 1 48 11 1889 645 2 2 77 \
5 1 1 1 48 12 1920 639 23 17 0 aes
4 1 1 1 49 0 679 618 1728 48 -1
5 1 1 1 49 1 679 618 230 17 43 BOA
5 1 1 1 49 2 1288 631 19 12 57 NS
5 1 1 1 49 3 1541 641 1 6 86 (
5 1 1 1 49 4 1704 645 46 3 6 SRL
5 1 1 1 49 5 1799 648 44 8 27 ye
5 1 1 1 49 6 1917 648 21 8 37 aa
5 1 1 1 49 7 2405 657 2 9 90 )
4 1 1 1 50 0 678 626 1724 48 -1
5 1 1 1 50 1 678 626 233 16 0 PRRARRARRRARRAAIRAGY
5 1 1 1 50 2 929 636 17 2 0 1
5 1 1 1 50 3 1297 641 4 4 34 NS
5 1 1 1 50 4 1544 651 2 3 92 (
5 1 1 1 50 5 1696 653 32 2 0 SORCa
5 1 1 1 50 6 1770 652 80 11 25 Partin!
5 1 1 1 50 7 1920 654 24 12 31 a
5 1 1 1 50 8 2400 672 2 2 0 :
4 1 1 1 51 0 677 633 1261 39 -1
5 1 1 1 51 1 677 633 342 20 17 ONDINE
5 1 1 1 51 2 1544 657 3 3 18 »
5 1 1 1 51 3 1704 660 31 3 50 teh
5 1 1 1 51 4 1748 661 68 9 0 Gras
5 1 1 1 51 5 1828 663 15 7 33 oh.
5 1 1 1 51 6 1922 666 16 6 13 a
4 1 1 1 52 0 677 639 1261 41 -1
5 1 1 1 52 1 677 639 230 16 0 RRRRARRARRAARRARAG
5 1 1 1 52 2 929 649 85 7 25 FES
5 1 1 1 52 3 1138 649 1 6 24 )
5 1 1 1 52 4 1541 664 1 6 0 ,
5 1 1 1 52 5 1710 668 47 2 18 ashy
5 1 1 1 52 6 1784 667 3 3 34 Ap
5 1 1 1 52 7 1835 670 15 7 9 uf
5 1 1 1 52 8 1917 673 21 7 21 ae
4 1 1 1 53 0 676 646 1726 51 -1
5 1 1 1 53 1 676 647 48 11 51 SII
5 1 1 1 53 2 858 646 35 17 38 IW
5 1 1 1 53 3 922 657 60 3 44 Fc
5 1 1 1 53 4 1132 661 3 4 70 é
5 1 1 1 53 5 1329 655 9 23 0 ¢
5 1 1 1 53 6 1542 671 4 6 92 (
5 1 1 1 53 7 1733 675 2 2 33 PE
5 1 1 1 53 8 1762 675 18 3 7 tale
5 1 1 1 53 9 1791 675 18 3 31 od
5 1 1 1 53 10 1814 661 26 27 43 oe
5 1 1 1 53 11 1842 683 3 1 38 8
5 1 1 1 53 12 1936 676 2 5 38 i
5 1 1 1 53 13 2400 694 2 3 0 -
4 1 1 1 54 0 675 652 1260 59 -1
5 1 1 1 54 1 675 652 226 20 3 RRARRARARRARRRAR
5 1 1 1 54 2 887 647 35 32 3 AE
5 1 1 1 54 3 929 663 75 4 1 foe
5 1 1 1 54 4 1770 682 67 9 40 PEE
5 1 1 1 54 5 1928 679 7 32 4 3:
4 1 1 1 55 0 674 660 1733 52 -1
5 1 1 1 55 1 674 660 235 19 1 RRR
5 1 1 1 55 2 951 672 1 3 2 Son
5 1 1 1 55 3 1004 669 16 8 35 Bt
5 1 1 1 55 4 1026 670 50 15 20 ot
5 1 1 1 55 5 1524 684 20 9 0 =)
5 1 1 1 55 6 1732 689 18 3 17 He
5 1 1 1 55 7 1777 689 54 11 6 eager
5 1 1 1 55 8 1917 691 1 3 11 ia
5 1 1 1 55 9 2404 700 3 12 0 ,
4 1 1 1 56 0 674 666 1730 55 -1
5 1 1 1 56 1 674 669 223 16 0 RRARRAARRARRAARA
5 1 1 1 56 2 999 666 19 28 12 as
5 1 1 1 56 3 1523 691 21 6 0 me
5 1 1 1 56 4 1726 697 17 10 0 eh
5 1 1 1 56 5 1748 687 17 27 36 ata
5 1 1 1 56 6 1770 704 54 3 0 teetdte
5 1 1 1 56 7 1835 704 2 2 19 ay,
5 1 1 1 56 8 1917 701 27 8 38 i
5 1 1 1 56 9 2400 716 4 5 8 g
4 1 1 1 57 0 671 695 1733 50 -1
5 1 1 1 57 1 671 695 61 11 50 RRARR
5 1 1 1 57 2 779 698 111 14 0 EGECLREGY
5 1 1 1 57 3 891 694 12 24 49 A
5 1 1 1 57 4 987 704 31 7 53 Ne
5 1 1 1 57 5 1542 717 6 9 18 \
5 1 1 1 57 6 1747 719 25 13 22 ME
5 1 1 1 57 7 1783 721 31 10 14 A
5 1 1 1 57 8 1826 728 33 3 31 dy
5 1 1 1 57 9 1917 726 17 5 44 aie
5 1 1 1 57 10 1999 732 2 2 60 1
5 1 1 1 57 11 2400 740 4 5 90 <
4 1 1 1 58 0 673 694 1271 49 -1
5 1 1 1 58 1 673 694 44 30 22 ISI
5 1 1 1 58 2 716 702 23 11 22 SI
5 1 1 1 58 3 746 702 34 11 0 III
5 1 1 1 58 4 786 702 40 15 0 III
5 1 1 1 58 5 826 704 55 13 32 ION,
5 1 1 1 58 6 936 716 32 3 0 br.
5 1 1 1 58 7 980 716 3 3 0 74
5 1 1 1 58 8 1003 714 11 5 37 SE
5 1 1 1 58 9 1761 735 18 3 32 mae
5 1 1 1 58 10 1790 735 19 3 2 Uta
5 1 1 1 58 11 1849 736 2 2 40 “les
5 1 1 1 58 12 1922 735 7 8 36 ai
4 1 1 1 59 0 669 708 1738 50 -1
5 1 1 1 59 1 669 708 215 16 0 RRRRRRARRARARRAGG
5 1 1 1 59 2 887 701 15 33 32 ft
5 1 1 1 59 3 972 723 3 3 10 1
5 1 1 1 59 4 1541 734 1 4 91 (
5 1 1 1 59 5 1636 739 99 4 30 GOLGI
5 1 1 1 59 6 1753 743 4 2 37 Fa
5 1 1 1 59 7 2405 749 2 9 84 )
4 1 1 1 60 0 675 715 1727 51 -1
5 1 1 1 60 1 675 715 206 16 27 SINS
5 1 1 1 60 2 854 708 18 29 35 SN
5 1 1 1 60 3 914 723 68 10 40 pee
5 1 1 1 60 4 1524 737 11 6 23 x
5 1 1 1 60 5 1805 750 61 3 7 frre
5 1 1 1 60 6 2400 764 2 2 0 -
4 1 1 1 61 0 668 718 1270 42 -1
5 1 1 1 61 1 668 718 211 20 0 RRRRRRRAERRRAIY
5 1 1 1 61 2 950 730 3 3 22 oe}
5 1 1 1 61 3 1000 728 19 10 42 Se
5 1 1 1 61 4 1082 720 18 26 88 be
5 1 1 1 61 5 1776 749 39 11 22 es
5 1 1 1 61 6 1841 757 33 3 0 SALPLPL
5 1 1 1 61 7 1921 751 17 7 40 bo
4 1 1 1 62 0 668 729 1739 52 -1
5 1 1 1 62 1 668 729 206 15 11 PISA
5 1 1 1 62 2 900 738 46 3 30 Yo
5 1 1 1 62 3 1524 744 20 14 58 3
5 1 1 1 62 4 1768 757 33 3 39 Bente
5 1 1 1 62 5 1849 764 17 3 57 OP
5 1 1 1 62 6 1919 743 19 28 40 iat
5 1 1 1 62 7 2405 772 2 9 26 \
4 1 1 1 63 0 667 732 1738 53 -1
5 1 1 1 63 1 667 732 208 20 0 URRRRRARRRARARA
5 1 1 1 63 2 950 745 54 4 4 aS
5 1 1 1 63 3 1524 759 8 9 80 2
5 1 1 1 63 4 1541 757 1 5 58 |
5 1 1 1 63 5 1777 765 2 2 29 a
5 1 1 1 63 6 1805 765 2 2 37 ate
5 1 1 1 63 7 1910 756 33 25 19 Baie
5 1 1 1 63 8 2403 782 2 3 61 )
4 1 1 1 64 0 666 743 1736 46 -1
5 1 1 1 64 1 666 743 207 16 20 ESSIEN
5 1 1 1 64 2 885 745 60 10 36 ric
5 1 1 1 64 3 988 750 33 9 32 RS
5 1 1 1 64 4 1546 769 2 2 0 \
5 1 1 1 64 5 1620 768 83 8 0 OaAn
5 1 1 1 64 6 1690 756 31 28 0 Ni
5 1 1 1 64 7 1930 775 13 9 34 ns
5 1 1 1 64 8 2400 787 2 2 79 4
4 1 1 1 65 0 666 750 1278 42 -1
5 1 1 1 65 1 666 750 204 16 0 PRRRARRARRAARARY
5 1 1 1 65 2 892 760 2 2 18 Vo
5 1 1 1 65 3 1007 760 7 4 30 RS
5 1 1 1 65 4 1523 771 21 13 58 3)
5 1 1 1 65 5 1920 778 24 14 28 a
4 1 1 1 66 0 665 756 1742 52 -1
5 1 1 1 66 1 665 756 202 17 23 RAIA
5 1 1 1 66 2 884 764 18 5 12 boo
5 1 1 1 66 3 989 767 24 8 17 ER
5 1 1 1 66 4 1541 780 1 5 42 (
5 1 1 1 66 5 1917 785 25 17 40 Bee
5 1 1 1 66 6 2403 795 4 13 7 )
4 1 1 1 67 0 665 760 1737 52 -1
5 1 1 1 67 1 665 760 202 15 11 RRRARRRARRARRIRAG
5 1 1 1 67 2 892 774 60 3 14 Poole
5 1 1 1 67 3 966 773 45 4 15 aS
5 1 1 1 67 4 1524 785 24 9 15 a
5 1 1 1 67 5 1917 784 17 27 4 ita
5 1 1 1 67 6 2400 810 2 2 47 <
4 1 1 1 68 0 284 769 1654 39 -1
5 1 1 1 68 1 284 769 33 1 3 a
5 1 1 1 68 2 663 770 200 16 37 BISWA
5 1 1 1 68 3 1525 782 7 26 45 mn
5 1 1 1 68 4 1920 793 18 15 28 aa
4 1 1 1 69 0 310 789 2097 61 -1
5 1 1 1 69 1 310 789 9 6 64 2
5 1 1 1 69 2 661 791 41 11 0 RAR
5 1 1 1 69 3 758 798 100 11 27 RARRRAR
5 1 1 1 69 4 869 797 113 13 5 988)
5 1 1 1 69 5 1009 804 10 7 28 PS
5 1 1 1 69 6 1544 818 2 3 68 \
5 1 1 1 69 7 1778 805 64 27 36 Sl
5 1 1 1 69 8 1932 822 14 13 31 a
5 1 1 1 69 9 2403 836 4 14 47 5
4 1 1 1 70 0 232 789 1742 53 -1
5 1 1 1 70 1 232 789 31 15 38 Do
5 1 1 1 70 2 287 789 32 21 34 wR
5 1 1 1 70 3 660 798 360 21 33 RNS
5 1 1 1 70 4 1541 825 1 6 78 (
5 1 1 1 70 5 1936 834 2 8 13 a
5 1 1 1 70 6 1963 835 11 7 21 a
4 1 1 1 71 0 659 807 1746 50 -1
5 1 1 1 71 1 659 807 4 6 72 R
5 1 1 1 71 2 799 812 183 12 22 RRA
5 1 1 1 71 3 966 802 21 27 15 Te
5 1 1 1 71 4 1542 832 4 6 45 ¢
5 1 1 1 71 5 1930 838 44 11 11 cle
5 1 1 1 71 6 2400 851 5 6 74 )
4 1 1 1 72 0 231 804 1713 51 -1
5 1 1 1 72 1 231 804 32 14 61 ms
5 1 1 1 72 2 287 804 32 11 61 mé
5 1 1 1 72 3 656 812 195 18 0 RRR
5 1 1 1 72 4 793 808 33 32 0 RR
5 1 1 1 72 5 1202 833 3 2 31 .
5 1 1 1 72 6 1524 837 22 11 54 a>
5 1 1 1 72 7 1930 847 14 8 21 oa
4 1 1 1 73 0 675 807 1732 66 -1
5 1 1 1 73 1 675 807 13 33 0 Y}
5 1 1 1 73 2 795 826 40 8 0 RAR
5 1 1 1 73 3 992 815 19 33 7 ry
5 1 1 1 73 4 1202 819 24 33 61 hey
5 1 1 1 73 5 1910 833 15 33 36 zi
5 1 1 1 73 6 2403 859 4 14 5 {
4 1 1 1 74 0 232 815 2172 66 -1
5 1 1 1 74 1 232 816 31 15 78 2°
5 1 1 1 74 2 287 815 32 17 81 28
5 1 1 1 74 3 655 826 42 18 15 PRR
5 1 1 1 74 4 742 834 114 16 15 ANIA
5 1 1 1 74 5 871 833 158 24 32 Lh
5 1 1 1 74 6 1196 844 20 9 21 Wi
5 1 1 1 74 7 1524 848 22 13 49 3
5 1 1 1 74 8 1918 843 16 38 19 iB
5 1 1 1 74 9 2400 877 4 3 29 2
4 1 1 1 75 0 232 830 1711 61 -1
5 1 1 1 75 1 232 834 18 3 46 5
5 1 1 1 75 2 310 830 9 7 18 ~
5 1 1 1 75 3 654 839 46 16 21 BYR
5 1 1 1 75 4 1004 839 9 33 41 me
5 1 1 1 75 5 1153 842 18 33 26 as
5 1 1 1 75 6 1230 848 49 17 27 Sw
5 1 1 1 75 7 1523 860 12 18 86 3
5 1 1 1 75 8 1920 858 23 33 34 ae
4 1 1 1 76 0 231 834 2173 72 -1
5 1 1 1 76 1 231 839 19 15 65 Zz
5 1 1 1 76 2 287 834 18 16 31 oO
5 1 1 1 76 3 651 846 339 26 33 BRAT
5 1 1 1 76 4 994 842 9 35 38 pe
5 1 1 1 76 5 1173 859 101 26 14 AO
5 1 1 1 76 6 1523 872 21 14 38 2.
5 1 1 1 76 7 1930 881 14 14 0 ea
5 1 1 1 76 8 2400 901 4 5 74 )
4 1 1 1 77 0 231 852 2176 67 -1
5 1 1 1 77 1 231 855 19 11 73 a
5 1 1 1 77 2 287 852 18 11 32 om
5 1 1 1 77 3 650 860 187 22 0 KRRERREAARARAG
5 1 1 1 77 4 856 869 158 14 24 tS
5 1 1 1 77 5 1166 868 27 29 45 SG
5 1 1 1 77 6 1257 878 18 16 0 ‘S
5 1 1 1 77 7 1524 885 24 9 32 5
5 1 1 1 77 8 1930 897 8 7 0 e
5 1 1 1 77 9 2404 907 3 12 57 d
4 1 1 1 78 0 283 854 2119 73 -1
5 1 1 1 78 1 283 854 20 39 55 zZ
5 1 1 1 78 2 648 873 185 19 27 RRR
5 1 1 1 78 3 856 882 149 12 3 PB
5 1 1 1 78 4 1185 885 44 14 8 bE.
5 1 1 1 78 5 1291 873 16 39 7 Us
5 1 1 1 78 6 1541 895 1 4 65 (
5 1 1 1 78 7 2400 925 2 2 12 /
4 1 1 1 79 0 231 869 2176 73 -1
5 1 1 1 79 1 231 869 75 30 70 £6
5 1 1 1 79 2 647 883 203 26 16 RAAT
5 1 1 1 79 3 885 898 104 11 38 tes
5 1 1 1 79 4 1008 896 12 15 30 Bat
5 1 1 1 79 5 1123 896 95 21 54 SGT
5 1 1 1 79 6 1251 909 9 12 27 we:
5 1 1 1 79 7 1313 915 4 4 14 Fh
5 1 1 1 79 8 1541 914 3 8 88 (
5 1 1 1 79 9 1909 905 35 37 45 pas
5 1 1 1 79 10 2404 929 3 13 82 )
4 1 1 1 80 0 231 885 2174 67 -1
5 1 1 1 80 1 231 885 19 25 21 S
5 1 1 1 80 2 645 898 184 21 27 RRRRARRARARAAA
5 1 1 1 80 3 856 913 2 2 5 Yoo
5 1 1 1 80 4 1195 908 17 15 43 Yes
5 1 1 1 80 5 1237 912 22 20 42 £8
5 1 1 1 80 6 1315 919 23 8 11 mS
5 1 1 1 80 7 1546 930 2 2 0 .
5 1 1 1 80 8 1913 919 22 33 26 rar
5 1 1 1 80 9 2403 943 2 3 4 i
4 1 1 1 81 0 641 923 1764 55 -1
5 1 1 1 81 1 641 923 196 17 24 BRIERE
5 1 1 1 81 2 848 935 2 2 25 8
5 1 1 1 81 3 907 935 82 10 28 aS
5 1 1 1 81 4 991 927 29 27 33 tan!
5 1 1 1 81 5 1179 930 7 27 0 ed
5 1 1 1 81 6 1256 938 27 15 28 fa
5 1 1 1 81 7 1301 943 32 11 36 eS
5 1 1 1 81 8 1545 952 3 3 24 \
5 1 1 1 81 9 1933 956 12 6 37 af
5 1 1 1 81 10 2400 966 5 12 80 <
4 1 1 1 82 0 231 920 2176 72 -1
5 1 1 1 82 1 231 933 18 16 82 >
5 1 1 1 82 2 287 920 18 25 12 %
5 1 1 1 82 3 639 930 429 35 17 rT)
5 1 1 1 82 4 1171 956 6 6 31 gel
5 1 1 1 82 5 1201 945 103 33 19 eae
5 1 1 1 82 6 1541 960 3 9 71 |
5 1 1 1 82 7 1624 968 212 20 0 Cece
5 1 1 1 82 8 1854 960 32 23 0 acat
5 1 1 1 82 9 1918 965 27 17 0 lee
5 1 1 1 82 10 2403 979 4 13 0 ;
4 1 1 1 83 0 637 953 1768 48 -1
5 1 1 1 83 1 637 953 178 15 0 PARRRRRRARAIRR
5 1 1 1 83 2 835 957 147 10 0 ET
5 1 1 1 83 3 1003 964 17 3 30 Bang
5 1 1 1 83 4 1164 965 15 11 10 OO
5 1 1 1 83 5 1228 964 92 15 38 eS
5 1 1 1 83 6 1544 973 4 9 86 >
5 1 1 1 83 7 1650 984 40 3 0 pam
5 1 1 1 83 8 1693 984 84 3 0 epnmmt
5 1 1 1 83 9 1796 984 40 4 22 boon
5 1 1 1 83 10 1854 984 31 10 35 dott
5 1 1 1 83 11 1918 983 26 9 25 Bae
5 1 1 1 83 12 2400 994 5 7 85 4
4 1 1 1 84 0 232 948 2175 63 -1
5 1 1 1 84 1 232 948 18 15 76 <
5 1 1 1 84 2 287 955 18 5 76 -
5 1 1 1 84 3 624 952 40 32 0 BE
5 1 1 1 84 4 664 952 75 32 0 IIEEE
5 1 1 1 84 5 757 963 72 12 0 AIG
5 1 1 1 84 6 1221 958 31 35 12 wee
5 1 1 1 84 7 1541 986 1 6 0 ;
5 1 1 1 84 8 1909 971 26 34 24 ae
5 1 1 1 84 9 2405 1002 2 9 25 \
4 1 1 1 85 0 235 952 2170 67 -1
5 1 1 1 85 1 235 952 13 25 21 —_
5 1 1 1 85 2 636 969 175 13 0 RRR
5 1 1 1 85 3 1008 982 6 3 0 s
5 1 1 1 85 4 1053 971 8 23 80 J
5 1 1 1 85 5 1143 969 13 28 34 os
5 1 1 1 85 6 1221 979 39 15 30 PSA
5 1 1 1 85 7 1281 979 52 15 36 ZS
5 1 1 1 85 8 1918 999 26 8 17 ae
5 1 1 1 85 9 2400 1012 5 7 92 2
4 1 1 1 86 0 285 960 1645 61 -1
5 1 1 1 86 1 285 960 17 32 28 Nn
5 1 1 1 86 2 635 970 172 18 34 OA
5 1 1 1 86 3 1151 985 19 13 66 SA
5 1 1 1 86 4 1201 988 118 12 32 TEs
5 1 1 1 86 5 1544 1002 2 3 26 ,
5 1 1 1 86 6 1918 989 12 32 25 Be
4 1 1 1 87 0 634 982 1773 52 -1
5 1 1 1 87 1 634 982 427 20 19 RARRRRARARAR
5 1 1 1 87 2 791 978 21 29 19 I
5 1 1 1 87 3 820 978 35 29 2 Ea
5 1 1 1 87 4 980 978 56 29 10 Lh
5 1 1 1 87 5 1045 978 18 29 33 Z|
5 1 1 1 87 6 1073 1002 7 1 69 |
5 1 1 1 87 7 1104 1002 30 2 39 le
5 1 1 1 87 8 1157 994 50 12 46 EP
5 1 1 1 87 9 1221 994 101 13 31 ae
5 1 1 1 87 10 1541 1009 1 6 92 (
5 1 1 1 87 11 1910 1003 31 25 51 Bee
5 1 1 1 87 12 2403 1020 4 14 34 )
4 1 1 1 88 0 630 1011 1311 45 -1
5 1 1 1 88 1 630 1011 158 13 52 RARARARREREG
5 1 1 1 88 2 819 1015 53 11 15 [18
5 1 1 1 88 3 998 1016 57 14 46 ES
5 1 1 1 88 4 1068 1012 44 25 0 L—_
5 1 1 1 88 5 1154 1021 46 14 46 OS
5 1 1 1 88 6 1227 1025 79 10 54 a
5 1 1 1 88 7 1541 1032 3 9 43 (
5 1 1 1 88 8 1921 1032 20 24 24 ann
4 1 1 1 89 0 630 1018 1772 47 -1
5 1 1 1 89 1 630 1018 153 15 5 KRAREEEEEARG
5 1 1 1 89 2 804 1020 55 13 9 Toh
5 1 1 1 89 3 1032 1028 49 7 39 i
5 1 1 1 89 4 1185 1027 46 17 23 es
5 1 1 1 89 5 1302 1021 18 27 27 SS
5 1 1 1 89 6 1546 1046 2 2 0 ‘
5 1 1 1 89 7 1906 1033 20 30 80 pe
5 1 1 1 89 8 2400 1062 2 3 0 -
4 1 1 1 90 0 231 1002 2176 78 -1
5 1 1 1 90 1 231 1002 19 36 89 9
5 1 1 1 90 2 287 1017 18 26 58 R
5 1 1 1 90 3 628 1018 152 33 52 RAR
5 1 1 1 90 4 743 1013 21 42 29 A
5 1 1 1 90 5 798 1034 52 13 16 ts
5 1 1 1 90 6 861 1022 286 37 7 SESSA
5 1 1 1 90 7 1179 1035 151 34 50 SSS
5 1 1 1 90 8 1541 1056 1 5 4 /
5 1 1 1 90 9 1919 1052 26 24 19 a
5 1 1 1 90 10 2404 1068 3 12 22 7
4 1 1 1 91 0 209 1033 2193 55 -1
5 1 1 1 91 1 209 1033 18 14 92 <
5 1 1 1 91 2 626 1041 150 20 37 ERIC
5 1 1 1 91 3 790 1048 17 10 51 ie
5 1 1 1 91 4 819 1049 56 12 26 bo
5 1 1 1 91 5 961 1043 41 27 5 rails
5 1 1 1 91 6 1077 1058 2 8 75 )
5 1 1 1 91 7 1127 1048 13 26 22 eo
5 1 1 1 91 8 1261 1060 7 12 0 h
5 1 1 1 91 9 1920 1072 24 12 32 ee
5 1 1 1 91 10 2400 1086 2 2 0 y
4 1 1 1 92 0 627 1047 1780 56 -1
5 1 1 1 92 1 627 1053 158 15 5 RARRRRRRARE
5 1 1 1 92 2 787 1043 9 34 38 of
5 1 1 1 92 3 811 1058 54 11 15 sa
5 1 1 1 92 4 922 1066 2 2 33 TE
5 1 1 1 92 5 966 1047 57 23 54 RD
5 1 1 1 92 6 1014 1043 12 34 39 I
5 1 1 1 92 7 1232 1067 4 4 18 XS
5 1 1 1 92 8 1261 1068 9 16 41 \
5 1 1 1 92 9 1541 1079 1 4 87 (
5 1 1 1 92 10 1918 1082 27 8 40 Be
5 1 1 1 92 11 2405 1094 2 9 42 \
4 1 1 1 93 0 289 1048 2113 63 -1
5 1 1 1 93 1 289 1048 12 24 46 wn
5 1 1 1 93 2 625 1060 145 15 39 POIs
5 1 1 1 93 3 790 1062 32 14 24 a
5 1 1 1 93 4 870 1069 46 8 44 eee
5 1 1 1 93 5 992 1061 34 26 34 tase]
5 1 1 1 93 6 1234 1067 18 24 52 SS
5 1 1 1 93 7 1542 1073 6 24 9 \,
5 1 1 1 93 8 1936 1095 5 5 0 -
5 1 1 1 93 9 2400 1109 2 2 0 /
4 1 1 1 94 0 627 1066 1314 50 -1
5 1 1 1 94 1 627 1066 35 12 0 LOL
5 1 1 1 94 2 666 1066 38 12 0 ICL
5 1 1 1 94 3 705 1062 55 26 0 II
5 1 1 1 94 4 798 1073 128 11 31 Ea
5 1 1 1 94 5 966 1071 30 16 0 rn
5 1 1 1 94 6 1021 1080 2 2 0 deey
5 1 1 1 94 7 1207 1073 19 25 21 SSS
5 1 1 1 94 8 1270 1084 5 8 42 1
5 1 1 1 94 9 1911 1091 30 25 0 yaaa
4 1 1 1 95 0 624 1073 1783 53 -1
5 1 1 1 95 1 624 1073 140 16 32 POIANA)
5 1 1 1 95 2 788 1075 49 13 25 he
5 1 1 1 95 3 861 1080 41 11 13 eked
5 1 1 1 95 4 968 1077 54 19 4 oO
5 1 1 1 95 5 1265 1092 5 4 0 e
5 1 1 1 95 6 1541 1098 3 8 48 (
5 1 1 1 95 7 2405 1117 2 9 12 )
4 1 1 1 96 0 287 1067 2118 67 -1
5 1 1 1 96 1 287 1067 18 16 92 9
5 1 1 1 96 2 506 1086 11 6 12 2
5 1 1 1 96 3 625 1080 141 18 0 ROH
5 1 1 1 96 4 776 1088 118 11 6 te
5 1 1 1 96 5 966 1085 57 17 46 RBS
5 1 1 1 96 6 1228 1106 3 2 60 .
5 1 1 1 96 7 1545 1113 3 3 0 ;
5 1 1 1 96 8 1918 1111 23 16 24 Hs
5 1 1 1 96 9 2400 1127 5 7 83 )
4 1 1 1 97 0 232 1104 2173 58 -1
5 1 1 1 97 1 232 1104 18 3 73 >
5 1 1 1 97 2 622 1107 138 16 1 BAAR
5 1 1 1 97 3 763 1103 26 33 21 WA
5 1 1 1 97 4 812 1114 33 6 19 hor
5 1 1 1 97 5 856 1114 31 13 19 eh
5 1 1 1 97 6 900 1117 26 10 17 aT
5 1 1 1 97 7 966 1118 57 12 25 SS
5 1 1 1 97 8 1197 1121 17 15 40 WW
5 1 1 1 97 9 1326 1129 10 6 26 x
5 1 1 1 97 10 1918 1129 26 29 29 Bee
5 1 1 1 97 11 2400 1150 5 12 76 <
4 1 1 1 98 0 621 1115 1311 43 -1
5 1 1 1 98 1 621 1115 136 15 29 SRR
5 1 1 1 98 2 790 1124 65 5 0 itech
5 1 1 1 98 3 966 1126 57 11 0 Kedese
5 1 1 1 98 4 1217 1136 2 3 6 :
5 1 1 1 98 5 1542 1144 2 2 74 ?
5 1 1 1 98 6 1918 1150 14 8 9 ee
4 1 1 1 99 0 232 1108 2175 68 -1
5 1 1 1 99 1 232 1108 18 21 95 =
5 1 1 1 99 2 627 1124 51 9 13 RRA
5 1 1 1 99 3 701 1124 34 13 13 AA
5 1 1 1 99 4 759 1110 27 39 9 di
5 1 1 1 99 5 797 1132 62 7 6 ito
5 1 1 1 99 6 870 1131 47 5 17 mane
5 1 1 1 99 7 966 1130 56 15 22 Ree
5 1 1 1 99 8 1201 1131 74 19 49 NS
5 1 1 1 99 9 1541 1147 1 6 47 (
5 1 1 1 99 10 1921 1137 14 35 21 Ei
5 1 1 1 99 11 2403 1163 4 13 86 )
4 1 1 1 100 0 283 1111 2119 69 -1
5 1 1 1 100 1 283 1111 17 33 0 9°
5 1 1 1 100 2 619 1128 90 18 0 RRR
5 1 1 1 100 3 709 1130 84 11 0 RAH
5 1 1 1 100 4 801 1135 36 10 10 hese
5 1 1 1 100 5 848 1135 78 14 5 terete}
5 1 1 1 100 6 966 1141 56 17 25 EAST
5 1 1 1 100 7 1195 1145 40 12 40 aS
5 1 1 1 100 8 1317 1150 3 3 17 S
5 1 1 1 100 9 1542 1154 4 6 10 ‘
5 1 1 1 100 10 1919 1160 22 8 17 ae
5 1 1 1 100 11 2400 1177 2 3 33 ‘
4 1 1 1 101 0 231 1131 2176 64 -1
5 1 1 1 101 1 231 1131 19 15 73 a
5 1 1 1 101 2 287 1135 19 20 71 0
5 1 1 1 101 3 482 1133 35 18 80 Bo
5 1 1 1 101 4 619 1138 134 16 0 RRARAAARRAG
5 1 1 1 101 5 768 1144 5 12 8 I
5 1 1 1 101 6 776 1144 24 12 2 ei
5 1 1 1 101 7 810 1145 41 12 0 ehdee
5 1 1 1 101 8 863 1152 61 6 0 liso’
5 1 1 1 101 9 966 1144 28 21 39 BO
5 1 1 1 101 10 1191 1149 69 23 35 Oca
5 1 1 1 101 11 1336 1167 2 3 0 .
5 1 1 1 101 12 1544 1163 2 3 85 >
5 1 1 1 101 13 1936 1169 6 9 54 i
5 1 1 1 101 14 2403 1181 4 14 0 {
4 1 1 1 102 0 482 1147 1923 55 -1
5 1 1 1 102 1 482 1147 11 9 26 S
5 1 1 1 102 2 618 1149 137 16 12 RARARRARRRAI
5 1 1 1 102 3 759 1141 17 29 15 VE
5 1 1 1 102 4 801 1154 58 10 9 See
5 1 1 1 102 5 870 1161 56 5 18 aed
5 1 1 1 102 6 985 1159 31 12 36 m5
5 1 1 1 102 7 1209 1167 6 8 4 a
5 1 1 1 102 8 1541 1170 3 9 90 (
5 1 1 1 102 9 1911 1166 19 29 33 ra
5 1 1 1 102 10 2400 1196 5 6 42 )
4 1 1 1 103 0 231 1147 1743 52 -1
5 1 1 1 103 1 231 1147 19 11 88 m
5 1 1 1 103 2 483 1152 34 18 65 32
5 1 1 1 103 3 617 1156 133 16 26 BAAD
5 1 1 1 103 4 776 1161 47 11 4 Sone
5 1 1 1 103 5 835 1162 30 9 32 tt
5 1 1 1 103 6 907 1168 17 2 37 i
5 1 1 1 103 7 966 1160 42 17 28 PS
5 1 1 1 103 8 1198 1170 30 11 22 Loy
5 1 1 1 103 9 1544 1186 2 3 61 \
5 1 1 1 103 10 1972 1197 2 2 21 fag
4 1 1 1 104 0 628 1158 914 41 -1
5 1 1 1 104 1 628 1164 125 14 0 RRRRRAOAT
5 1 1 1 104 2 782 1172 18 6 32 3
5 1 1 1 104 3 810 1158 125 36 24 yA
5 1 1 1 104 4 983 1174 25 10 33 ty
5 1 1 1 104 5 1196 1175 30 15 3 TN
5 1 1 1 104 6 1541 1193 1 6 78 (
4 1 1 1 105 0 231 1156 2176 79 -1
5 1 1 1 105 1 231 1156 75 27 38 og
5 1 1 1 105 2 482 1168 35 18 5 24
5 1 1 1 105 3 616 1169 135 21 27 PY
5 1 1 1 105 4 805 1183 2 3 43 Ns
5 1 1 1 105 5 847 1188 64 6 44 yO
5 1 1 1 105 6 1192 1188 39 6 10 St
5 1 1 1 105 7 1542 1200 6 9 45 (
5 1 1 1 105 8 1932 1180 65 55 43 iat
5 1 1 1 105 9 2400 1204 7 21 29 4
4 1 1 1 106 0 231 1183 2176 58 -1
5 1 1 1 106 1 231 1183 19 10 69 a
5 1 1 1 106 2 615 1192 21 10 21 Pe
5 1 1 1 106 3 854 1192 31 11 25 Se
5 1 1 1 106 4 944 1192 87 20 19 SR
5 1 1 1 106 5 1075 1207 5 3 42 TL
5 1 1 1 106 6 1191 1197 34 13 24 Sh
5 1 1 1 106 7 1541 1216 1 6 0 :
5 1 1 1 106 8 1908 1200 47 35 30 FEEL
5 1 1 1 106 9 2072 1228 2 2 0 ;
5 1 1 1 106 10 2403 1227 4 14 23 5
4 1 1 1 107 0 618 1196 1356 59 -1
5 1 1 1 107 1 618 1192 38 26 1 SSIS
5 1 1 1 107 2 659 1196 49 16 1 III
5 1 1 1 107 3 839 1203 94 11 45 PQ
5 1 1 1 107 4 950 1207 48 5 24 Sea
5 1 1 1 107 5 1077 1202 20 25 31 ig
5 1 1 1 107 6 1189 1211 11 11 28 Si
5 1 1 1 107 7 1876 1223 98 32 50 INSANE
4 1 1 1 108 0 481 1221 1595 45 -1
5 1 1 1 108 1 481 1224 4 2 40 §
5 1 1 1 108 2 627 1221 41 10 37 RAE
5 1 1 1 108 3 742 1223 195 16 12 AES
5 1 1 1 108 4 1023 1231 19 10 33 eS
5 1 1 1 108 5 1541 1239 1 5 64 (
5 1 1 1 108 6 1886 1254 150 10 0 SSoueieea
5 1 1 1 108 7 2066 1258 10 8 4 =
4 1 1 1 109 0 231 1235 2171 60 -1
5 1 1 1 109 1 231 1235 19 10 77 G
5 1 1 1 109 2 482 1243 11 6 67 3
5 1 1 1 109 3 611 1243 131 18 0 ARRRARRARAG
5 1 1 1 109 4 768 1255 4 5 17 Os
5 1 1 1 109 5 789 1254 86 6 25 ae
5 1 1 1 109 6 1012 1247 45 28 15 fesse
5 1 1 1 109 7 1545 1274 3 3 92 >
5 1 1 1 109 8 2400 1293 2 2 0 :
4 1 1 1 110 0 231 1240 1315 44 -1
5 1 1 1 110 1 231 1240 74 17 53 mo
5 1 1 1 110 2 482 1250 11 13 55 i
5 1 1 1 110 3 611 1252 316 19 6 RSS
5 1 1 1 110 4 1029 1265 22 7 0 S
5 1 1 1 110 5 1542 1278 4 6 43 ¢
4 1 1 1 111 0 231 1257 2171 61 -1
5 1 1 1 111 1 231 1257 75 14 37 mio”
5 1 1 1 111 2 482 1264 11 7 30 5
5 1 1 1 111 3 610 1266 129 18 41 RNR
5 1 1 1 111 4 768 1275 107 6 30 ee
5 1 1 1 111 5 1024 1283 13 7 63 Es
5 1 1 1 111 6 1545 1297 3 3 7 \
5 1 1 1 111 7 2400 1316 2 2 18 ,
4 1 1 1 112 0 482 1275 1925 58 -1
5 1 1 1 112 1 482 1275 11 5 34 3
5 1 1 1 112 2 675 1280 50 11 0 SRR
5 1 1 1 112 3 741 1280 83 12 18 Seep
5 1 1 1 112 4 839 1285 26 5 36 ee
5 1 1 1 112 5 885 1283 44 8 25 ea
5 1 1 1 112 6 1031 1289 22 9 57 ==
5 1 1 1 112 7 1542 1301 4 6 0 ‘
5 1 1 1 112 8 2405 1324 2 9 2 ,
4 1 1 1 113 0 482 1276 1923 61 -1
5 1 1 1 113 1 482 1281 11 11 0 o
5 1 1 1 113 2 600 1276 37 29 4 PY
5 1 1 1 113 3 810 1287 128 14 24 SSS
5 1 1 1 113 4 1003 1281 15 29 35 if
5 1 1 1 113 5 1196 1304 30 6 60 ae
5 1 1 1 113 6 1541 1308 1 6 69 (
5 1 1 1 113 7 2403 1334 2 3 0 )
4 1 1 1 114 0 620 1293 1782 48 -1
5 1 1 1 114 1 620 1293 62 12 52 SSI
5 1 1 1 114 2 768 1296 25 5 66 SS
5 1 1 1 114 3 861 1307 4 3 93 =
5 1 1 1 114 4 902 1307 4 4 84 =
5 1 1 1 114 5 1034 1303 8 5 35 =
5 1 1 1 114 6 1196 1311 11 7 42 Q
5 1 1 1 114 7 1239 1304 12 12 54 a
5 1 1 1 114 8 1280 1304 11 14 67 g
5 1 1 1 114 9 1544 1318 2 3 23 \
5 1 1 1 114 10 2400 1338 2 3 15 é
4 1 1 1 115 0 482 1295 1925 61 -1
5 1 1 1 115 1 482 1296 11 13 90 2
5 1 1 1 115 2 608 1295 126 21 13 RARRARRARA
5 1 1 1 115 3 758 1306 6 6 10 [8
5 1 1 1 115 4 1054 1313 7 11 0 i
5 1 1 1 115 5 1216 1310 34 18 69 33
5 1 1 1 115 6 1541 1324 5 13 84 ?
5 1 1 1 115 7 2403 1342 4 14 35 5
4 1 1 1 116 0 482 1307 1923 56 -1
5 1 1 1 116 1 482 1310 10 9 24 z
5 1 1 1 116 2 606 1307 126 25 22 RRR
5 1 1 1 116 3 768 1317 138 17 23 Sta
5 1 1 1 116 4 1023 1322 38 14 26 SSS
5 1 1 1 116 5 1196 1319 95 19 42 32293
5 1 1 1 116 6 1542 1338 3 4 81 >
5 1 1 1 116 7 2400 1357 5 6 79 J
4 1 1 1 117 0 605 1342 1797 44 -1
5 1 1 1 117 1 605 1342 125 15 0 RYARRn
5 1 1 1 117 2 719 1332 15 29 24 I
5 1 1 1 117 3 758 1347 25 6 15 Se
5 1 1 1 117 4 799 1346 87 7 40 SSS
5 1 1 1 117 5 1011 1351 51 10 18 ifs
5 1 1 1 117 6 1280 1362 11 6 64 6
5 1 1 1 117 7 1542 1361 6 9 86 (
5 1 1 1 117 8 2400 1384 2 2 0 /
4 1 1 1 118 0 246 1331 2161 71 -1
5 1 1 1 118 1 246 1331 40 27 0 ojoyey>
5 1 1 1 118 2 603 1348 131 18 46 KW
5 1 1 1 118 3 871 1358 25 8 29 eee
5 1 1 1 118 4 1011 1356 48 16 0 ipEs
5 1 1 1 118 5 1196 1363 11 7 54 2
5 1 1 1 118 6 1256 1358 35 18 84 og
5 1 1 1 118 7 1541 1371 4 11 0 ¢
5 1 1 1 118 8 2403 1388 4 14 80 )
4 1 1 1 119 0 604 1374 938 31 -1
5 1 1 1 119 1 604 1374 50 21 44 DISS
5 1 1 1 119 2 715 1379 9 6 45 J
5 1 1 1 119 3 882 1389 4 4 9 ae
5 1 1 1 119 4 1011 1382 51 21 0 }EESES
5 1 1 1 119 5 1196 1392 10 3 41 =
5 1 1 1 119 6 1541 1400 1 5 76 (
4 1 1 1 120 0 602 1383 1800 50 -1
5 1 1 1 120 1 602 1383 118 12 0 RRRARRRR
5 1 1 1 120 2 710 1375 19 28 0 AF
5 1 1 1 120 3 758 1388 122 8 24 See
5 1 1 1 120 4 1011 1391 50 12 16 {pes
5 1 1 1 120 5 1196 1385 8 28 66 Zz
5 1 1 1 120 6 1577 1402 12 12 0 -
5 1 1 1 120 7 1706 1394 10 26 27 3
5 1 1 1 120 8 1782 1410 11 14 0 g
5 1 1 1 120 9 1841 1399 15 29 52 gq
5 1 1 1 120 10 2400 1431 2 2 0 -
4 1 1 1 121 0 246 1374 1966 67 -1
5 1 1 1 121 1 246 1382 29 10 0 ese
5 1 1 1 121 2 277 1374 19 30 0 eh
5 1 1 1 121 3 482 1381 11 11 74 2
5 1 1 1 121 4 601 1385 66 16 35 IMA
5 1 1 1 121 5 769 1398 107 6 38 ==SSSS
5 1 1 1 121 6 1011 1399 51 9 25 ier
5 1 1 1 121 7 1196 1405 30 12 55 23
5 1 1 1 121 8 1542 1420 2 2 84 »
5 1 1 1 121 9 1578 1418 27 7 52 Fg
5 1 1 1 121 10 1999 1425 10 12 24 Z
5 1 1 1 121 11 2123 1422 89 19 76 2888
4 1 1 1 122 0 257 1392 2150 60 -1
5 1 1 1 122 1 257 1392 30 9 52 age
5 1 1 1 122 2 600 1397 127 14 0 RARARAR
5 1 1 1 122 3 697 1388 31 33 0 RP
5 1 1 1 122 4 1011 1405 50 14 0 EESs
5 1 1 1 122 5 1216 1415 10 9 31 z
5 1 1 1 122 6 1541 1423 1 5 83 (
5 1 1 1 122 7 1594 1426 8 2 69 a
5 1 1 1 122 8 1706 1423 10 6 65 =
5 1 1 1 122 9 1782 1425 10 12 67 2
5 1 1 1 122 10 1830 1422 26 15 60 33
5 1 1 1 122 11 2403 1438 4 14 0 ,
4 1 1 1 123 0 242 1409 2160 70 -1
5 1 1 1 123 1 242 1409 45 29 21 alslalal
5 1 1 1 123 2 606 1423 54 13 0 RRR
5 1 1 1 123 3 695 1425 17 14 0 AY
5 1 1 1 123 4 840 1430 25 6 23 a
5 1 1 1 123 5 1011 1422 50 29 0 ifeons
5 1 1 1 123 6 1216 1445 10 6 53 m
5 1 1 1 123 7 1256 1442 10 6 33 oa
5 1 1 1 123 8 1541 1446 3 9 74 (
5 1 1 1 123 9 1782 1452 11 6 63 2
5 1 1 1 123 10 2400 1477 2 2 0 ;
4 1 1 1 124 0 602 1443 1803 63 -1
5 1 1 1 124 1 602 1443 103 32 39 RRRARRA
5 1 1 1 124 2 768 1460 107 6 26 wees
5 1 1 1 124 3 1014 1460 39 10 31 eS
5 1 1 1 124 4 1196 1467 30 11 8 e2
5 1 1 1 124 5 1545 1462 9 31 13 {,
5 1 1 1 124 6 1578 1471 11 18 0 &
5 1 1 1 124 7 1706 1477 10 21 32 g
5 1 1 1 124 8 1782 1482 11 6 35 g
5 1 1 1 124 9 1830 1483 26 12 51 62
5 1 1 1 124 10 1999 1483 11 12 29 Z
5 1 1 1 124 11 2122 1487 58 14 20 aoe
5 1 1 1 124 12 2400 1495 5 11 54 Q
4 1 1 1 125 0 595 1459 1812 58 -1
5 1 1 1 125 1 595 1459 107 18 35 POR)
5 1 1 1 125 2 758 1471 45 6 0 ==
5 1 1 1 125 3 819 1470 46 7 0 ===
5 1 1 1 125 4 1011 1472 78 14 11 tesa}
5 1 1 1 125 5 1196 1474 30 13 52 8S
5 1 1 1 125 6 1256 1475 10 8 18 2
5 1 1 1 125 7 1541 1485 5 12 44 e
5 1 1 1 125 8 1782 1489 11 7 2 a
5 1 1 1 125 9 2144 1493 36 17 52 a2
5 1 1 1 125 10 2405 1507 2 10 21 )
4 1 1 1 126 0 603 1462 1802 65 -1
5 1 1 1 126 1 603 1462 96 31 0 ARRAY
5 1 1 1 126 2 768 1481 66 6 36 SSS
5 1 1 1 126 3 1196 1486 30 10 33 ae
5 1 1 1 126 4 1256 1486 10 9 15 x
5 1 1 1 126 5 1542 1499 2 2 63 {
5 1 1 1 126 6 1575 1484 8 30 52 ~@
5 1 1 1 126 7 1706 1498 10 11 68 6
5 1 1 1 126 8 1782 1500 11 13 82 =
5 1 1 1 126 9 1845 1496 11 23 57 3
5 1 1 1 126 10 2144 1513 11 14 57 2
5 1 1 1 126 11 2400 1518 5 6 74 Q
4 1 1 1 127 0 591 1518 1589 49 -1
5 1 1 1 127 1 591 1518 97 14 49 IR,
5 1 1 1 127 2 768 1523 45 4 63 SS
5 1 1 1 127 3 1011 1527 51 14 0 RasSS
5 1 1 1 127 4 1541 1538 5 12 0 -
5 1 1 1 127 5 1578 1550 11 5 37 8
5 1 1 1 127 6 1999 1552 11 5 11 -
5 1 1 1 127 7 2144 1560 36 7 48 zs
4 1 1 1 128 0 591 1517 1816 69 -1
5 1 1 1 128 1 591 1517 98 38 31 on
5 1 1 1 128 2 758 1532 96 17 2 ——S
5 1 1 1 128 3 1011 1539 51 15 20 ifs
5 1 1 1 128 4 1215 1537 11 18 17 z
5 1 1 1 128 5 1256 1542 10 7 17 §
5 1 1 1 128 6 1541 1552 7 14 0 .
5 1 1 1 128 7 1578 1555 11 12 69 8
5 1 1 1 128 8 1846 1561 10 6 23 5
5 1 1 1 128 9 2144 1566 36 12 47 ae
5 1 1 1 128 10 2405 1576 2 10 0 \
4 1 1 1 129 0 590 1537 1812 57 -1
5 1 1 1 129 1 590 1537 96 23 33 Oy
5 1 1 1 129 2 758 1544 87 15 22 =
5 1 1 1 129 3 1016 1549 40 17 26 eae
5 1 1 1 129 4 1256 1551 10 16 0 :
5 1 1 1 129 5 1544 1571 2 2 8 _
5 1 1 1 129 6 1577 1572 12 6 67 8
5 1 1 1 129 7 1845 1567 11 11 90 3
5 1 1 1 129 8 2169 1576 12 18 73 5
5 1 1 1 129 9 2400 1592 2 2 3 /
4 1 1 1 130 0 587 1569 1815 48 -1
5 1 1 1 130 1 587 1569 88 12 51 KARR
5 1 1 1 130 2 758 1573 45 7 26 eet
5 1 1 1 130 3 1026 1580 36 11 42 as
5 1 1 1 130 4 1542 1591 6 11 0 .
5 1 1 1 130 5 1846 1600 10 6 16 5
5 1 1 1 130 6 2400 1615 2 2 20 ,
4 1 1 1 131 0 577 1567 1830 69 -1
5 1 1 1 131 1 577 1567 86 34 16 RAR
5 1 1 1 131 2 769 1585 65 5 43 SSS
5 1 1 1 131 3 1010 1580 51 30 0 ipeaes
5 1 1 1 131 4 1256 1599 10 9 26 6
5 1 1 1 131 5 1541 1603 48 13 65 (9
5 1 1 1 131 6 1845 1607 11 7 84 3
5 1 1 1 131 7 2144 1609 37 18 44 Qs
5 1 1 1 131 8 2403 1622 4 14 0 ]
4 1 1 1 132 0 587 1586 1815 57 -1
5 1 1 1 132 1 587 1586 84 15 7 RRRRAAY
5 1 1 1 132 2 840 1595 4 5 10 =
5 1 1 1 132 3 1021 1592 40 26 15 SSS
5 1 1 1 132 4 1543 1614 5 8 65 \
5 1 1 1 132 5 2167 1617 14 26 43 oO
5 1 1 1 132 6 2400 1638 2 2 0 y
4 1 1 1 133 0 585 1592 1822 67 -1
5 1 1 1 133 1 585 1592 79 31 0 RRR
5 1 1 1 133 2 830 1606 4 4 52 =
5 1 1 1 133 3 1010 1608 52 16 0 HEssS
5 1 1 1 133 4 1256 1613 10 11 58 z
5 1 1 1 133 5 1577 1617 12 21 58 8
5 1 1 1 133 6 2144 1633 36 13 70 gf
5 1 1 1 133 7 2403 1645 4 14 71 J
4 1 1 1 134 0 585 1627 1820 58 -1
5 1 1 1 134 1 585 1627 75 15 52 RORY
5 1 1 1 134 2 840 1636 5 5 22 sy
5 1 1 1 134 3 1010 1642 3 5 45 +
5 1 1 1 134 4 1016 1632 45 26 0 feeas
5 1 1 1 134 5 1541 1653 3 9 0 —
5 1 1 1 134 6 1578 1651 10 9 0 s
5 1 1 1 134 7 2169 1666 12 6 60 a
5 1 1 1 134 8 2400 1679 5 6 29 2
4 1 1 1 135 0 579 1657 1826 56 -1
5 1 1 1 135 1 579 1658 43 18 19 we
5 1 1 1 135 2 768 1667 66 6 32 Sooo
5 1 1 1 135 3 1044 1657 20 35 16 |
5 1 1 1 135 4 1578 1685 11 14 21 8
5 1 1 1 135 5 1846 1692 10 7 92 2
5 1 1 1 135 6 2400 1706 5 7 0 ,
4 1 1 1 136 0 579 1672 1828 52 -1
5 1 1 1 136 1 579 1672 70 15 0 RRARAY
5 1 1 1 136 2 758 1676 66 8 49 ee
5 1 1 1 136 3 1020 1688 3 4 48 1
5 1 1 1 136 4 1136 1688 6 13 32 n
5 1 1 1 136 5 1541 1699 1 5 90 (
5 1 1 1 136 6 1845 1703 11 16 66 z
5 1 1 1 136 7 2405 1714 2 10 86 )
4 1 1 1 137 0 577 1679 1012 38 -1
5 1 1 1 137 1 577 1679 57 15 21 SSA
5 1 1 1 137 2 768 1688 67 5 56 SSS
5 1 1 1 137 3 1012 1687 52 20 3 i
5 1 1 1 137 4 1542 1700 47 17 52 (8
4 1 1 1 138 0 576 1682 1831 65 -1
5 1 1 1 138 1 576 1682 67 37 48 Kany
5 1 1 1 138 2 799 1698 42 7 25 Ss
5 1 1 1 138 3 1014 1703 46 15 42 om
5 1 1 1 138 4 1132 1705 7 15 40 i
5 1 1 1 138 5 1541 1716 4 11 0 Q
5 1 1 1 138 6 1578 1718 3 2 52 3
5 1 1 1 138 7 2405 1737 2 10 68 )
4 1 1 1 139 0 574 1690 1831 65 -1
5 1 1 1 139 1 574 1690 55 39 0 REAR
5 1 1 1 139 2 758 1709 67 18 65 Ss
5 1 1 1 139 3 1012 1710 52 25 25 ty
5 1 1 1 139 4 1130 1722 6 15 42 i
5 1 1 1 139 5 1544 1732 2 9 68 (
5 1 1 1 139 6 2400 1748 5 7 86 )
4 1 1 1 140 0 572 1710 1835 64 -1
5 1 1 1 140 1 572 1710 69 35 48 Ky
5 1 1 1 140 2 768 1720 45 15 26 ses
5 1 1 1 140 3 1016 1720 7 33 0 ie
5 1 1 1 140 4 1127 1726 46 28 35 ta]
5 1 1 1 140 5 1541 1742 3 8 84 (
5 1 1 1 140 6 2403 1760 4 14 67 J
4 1 1 1 141 0 578 1728 1819 55 -1
5 1 1 1 141 1 578 1728 57 11 14 RARE
5 1 1 1 141 2 779 1739 45 7 0 a
5 1 1 1 141 3 1016 1729 7 27 40 ti
5 1 1 1 141 4 1061 1733 3 27 91 |
5 1 1 1 141 5 1544 1755 2 2 74 (
5 1 1 1 141 6 2287 1778 2 2 0 :
5 1 1 1 141 7 2335 1780 62 3 11 oe
4 1 1 1 142 0 249 1742 878 66 -1
5 1 1 1 142 1 249 1742 45 40 17 aes
5 1 1 1 142 2 568 1749 64 48 6 Looe
5 1 1 1 142 3 727 1758 87 29 36 Qs
5 1 1 1 142 4 875 1785 19 2 26 Hu
5 1 1 1 142 5 1013 1759 44 37 54 SEH
5 1 1 1 142 6 1108 1763 19 45 28 {Hl
4 1 1 1 143 0 249 1779 2145 62 -1
5 1 1 1 143 1 249 1779 45 10 65 oo?
5 1 1 1 143 2 573 1785 43 12 9 RRB
5 1 1 1 143 3 946 1800 28 6 35 a
5 1 1 1 143 4 1878 1827 5 1 0 CO
5 1 1 1 143 5 2392 1838 2 3 0 :
4 1 1 1 144 0 249 1785 2149 71 -1
5 1 1 1 144 1 249 1785 45 19 14 aga
5 1 1 1 144 2 564 1789 38 25 37 Roy
5 1 1 1 144 3 758 1800 64 17 35 ——
5 1 1 1 144 4 914 1800 61 14 15 Sed
5 1 1 1 144 5 1103 1789 18 38 79 hy
5 1 1 1 144 6 1551 1826 60 8 34 RAR
5 1 1 1 144 7 2028 1832 73 2 42 ~~
5 1 1 1 144 8 2396 1843 2 13 29 )
4 1 1 1 145 0 249 1800 1755 60 -1
5 1 1 1 145 1 249 1800 45 19 67 AGE
5 1 1 1 145 2 552 1800 40 33 81 RY
5 1 1 1 145 3 758 1814 63 15 18 ——=
5 1 1 1 145 4 914 1817 34 14 15 Cae
5 1 1 1 145 5 958 1820 90 16 27 Toa
5 1 1 1 145 6 1114 1830 3 10 31 |
5 1 1 1 145 7 1534 1843 1 6 85 (
5 1 1 1 145 8 1993 1857 11 3 21 an
4 1 1 1 146 0 249 1813 2149 59 -1
5 1 1 1 146 1 249 1815 45 15 48 $88
5 1 1 1 146 2 565 1813 9 33 30 Ry
5 1 1 1 146 3 768 1827 49 11 37 oe
5 1 1 1 146 4 911 1831 86 14 20 i
5 1 1 1 146 5 1045 1838 2 3 34 htt
5 1 1 1 146 6 1114 1842 2 3 37 |
5 1 1 1 146 7 1139 1841 37 7 0 ki
5 1 1 1 146 8 1536 1850 2 4 70 (
5 1 1 1 146 9 1725 1857 11 3 0 -
5 1 1 1 146 10 1763 1857 11 3 25 2
5 1 1 1 146 11 1802 1857 49 3 28 ee
5 1 1 1 146 12 1878 1857 49 3 38 ee
5 1 1 1 146 13 2031 1857 50 14 48 BoB
5 1 1 1 146 14 2396 1866 2 6 0 )
4 1 1 1 147 0 249 1827 2149 56 -1
5 1 1 1 147 1 249 1827 45 11 53 ga8
5 1 1 1 147 2 562 1831 22 15 34 Ry
5 1 1 1 147 3 758 1841 57 7 17 Sa
5 1 1 1 147 4 1033 1843 5 2 20 ee
5 1 1 1 147 5 1572 1857 48 13 48 xxv
5 1 1 1 147 6 1648 1857 87 13 0 eee
5 1 1 1 147 7 1763 1862 202 8 0 esseeses
5 1 1 1 147 8 2070 1872 46 8 66 BY
5 1 1 1 147 9 2395 1875 3 8 87 )
4 1 1 1 148 0 249 1835 2149 67 -1
5 1 1 1 148 1 249 1836 45 16 0 oea
5 1 1 1 148 2 560 1835 27 35 70 Y
5 1 1 1 148 3 768 1853 44 15 75 =
5 1 1 1 148 4 914 1852 73 14 0 eeerpesietl
5 1 1 1 148 5 1045 1868 4 2 0 —ha2
5 1 1 1 148 6 1108 1859 5 16 0 »|Ilf
5 1 1 1 148 7 1534 1866 4 11 72 »
5 1 1 1 148 8 1572 1871 49 18 70 88
5 1 1 1 148 9 1648 1871 11 18 73 8
5 1 1 1 148 10 1687 1871 49 18 64 88
5 1 1 1 148 11 1763 1871 11 18 41 8
5 1 1 1 148 12 1801 1871 12 18 63 8
5 1 1 1 148 13 1840 1871 49 18 67 Be
5 1 1 1 148 14 1917 1871 48 18 39 eB
5 1 1 1 148 15 1993 1871 49 19 53 eB
5 1 1 1 148 16 2070 1876 46 14 54 EL
5 1 1 1 148 17 2396 1889 2 13 23 \
4 1 1 1 149 0 249 1853 2149 66 -1
5 1 1 1 149 1 249 1853 45 21 60 ace
5 1 1 1 149 2 758 1864 53 24 41 Set
5 1 1 1 149 3 914 1866 87 27 9 Eiht
5 1 1 1 149 4 1032 1875 30 20 0 eeel®
5 1 1 1 149 5 1060 1859 41 40 7 ||
ae (Ee ul ¢ : }
225 N woo eB /
( )
za? Ete ACT AF : “s
gaa fn ES ts M V )
aa Satan f W ? )
ii Wt) ot ( /
iAak Mkts to + ’ )
223 (TBR finer om | / J
i raTT )
4 3 Sy THVT or ; ;
25: m es f 2
HE ZO ey
5 c ( /
>o iB \
2Rz > 1 )
gae g wa PRN pd)
2 z 2 -O Q . FAA ! 2
Qa é LZ t LAN |! )
ge S eG RA )
z 3 RAR ag 5
3 z or | rot ‘
3 6 > ros )
8 - ( RRA \
i ¢ RE
¢ LAE )
¢ : , rf Q
? A 4
( SEES IIIS ‘
¢ Wow St | & U Lt \
( Metsse-teeeasssu ————+ SS REE )
( f f ,} ‘
: , jp | s {4
meg ( ‘ e » J
g > ‘ \ Sy 7} )
( 1 SS |)
ne ¢ / DES \
z ¢ 4 ee {
> ( tes 1 ‘AAVONNOS 5 <
fs) Fie YA
3 ‘ fore Bee \% )
( 4 x )
Zz ( pre ee as eer tare Br ,
~ ¢ SURAT RIG a tate t of )
R Cs gare Dy |)
xo ? Veen aie te iy )
4 ? Bo a PLS es lt 4 Vy )
( ede Lif |’
a pis tr 4 )
z [_ = Vy c ;
‘ \ WWF KD
5 ~ 2 os =m
ig] 92 9 99 9
Lie
3 3 oR & BO Bo
( z Ba 28
vu a 3 3 = 5 6 3s
Q = 2 9 83 88
gi 26 2 2s
2 ( a 2 2 32
$2 > 3 42 2 5a)
225 a $ & gs £ On
5 5 8 65 6 2)
eh e 5 a 3 53
-, O * ¢ = RB See
DUFF ¢ 22 58 3°8
2 oS ( #9 3 2 8
» : zo é
re 6 2
5 1 1 1 217 4 2260 3055 11 11 88 6
5 1 1 1 217 5 2338 3056 12 17 0 ££
5 1 1 1 217 6 2382 3061 16 13 23 &
4 1 1 1 218 0 110 3001 2288 98 -1
5 1 1 1 218 1 110 3001 48 57 5 Xo)
5 1 1 1 218 2 1534 3055 4 18 39 (
5 1 1 1 218 3 2204 3074 11 25 32 a
5 1 1 1 218 4 2260 3070 11 17 64 8
5 1 1 1 218 5 2382 3074 16 23 0 z
4 1 1 1 219 0 342 3048 2056 59 -1
5 1 1 1 219 1 342 3048 40 5 88 =
5 1 1 1 219 2 1536 3074 5 9 0 ,
5 1 1 1 219 3 2382 3093 16 14 0 R
4 1 1 1 220 0 136 3040 2262 74 -1
5 1 1 1 220 1 136 3040 11 38 61 oO
5 1 1 1 220 2 1534 3084 5 13 77 (
5 1 1 1 220 3 2204 3101 11 9 15 é&
5 1 1 1 220 4 2260 3091 11 21 49 &
5 1 1 1 220 5 2382 3107 16 7 21 8)
4 1 1 1 221 0 225 3060 2173 65 -1
5 1 1 1 221 1 225 3061 70 20 8 reg
5 1 1 1 221 2 342 3060 40 32 57 OZ
5 1 1 1 221 3 1536 3101 2 5 0 .
5 1 1 1 221 4 2260 3112 11 6 27 5
5 1 1 1 221 5 2382 3115 16 10 52 8
4 1 1 1 222 0 128 3076 2269 62 -1
5 1 1 1 222 1 149 3072 14 51 56 QD
5 1 1 1 222 2 225 3076 70 43 20 7
5 1 1 1 222 3 342 3097 21 37 62 5
5 1 1 1 222 4 1534 3107 7 16 2 ¢
5 1 1 1 222 5 2204 3115 11 11 70 2
5 1 1 1 222 6 2260 3117 11 20 57 4
5 1 1 1 222 7 2394 3130 3 8 32 J
4 1 1 1 223 0 129 3162 253 35 -1
5 1 1 1 223 1 129 3162 37 35 18 =)
5 1 1 1 223 2 350 3165 18 36 46 ~<
4 1 1 1 224 0 129 3205 33 15 -1
5 1 1 1 224 1 136 3201 8 28 15 —_
4 1 1 1 225 0 129 3230 33 15 -1
5 1 1 1 225 1 136 3226 8 28 15 —_Section 70
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
5 PROPOSAL TO PREPARE A NEW PLANNING SCHEME
DOCUMENT INFORM AT ION
Author Planning Scheme Project Manager, Raul Weychardt
Planning & Infrastructure Department
Index ECM/Project & Contract/Planning Scheme Review 2016 – Project Planning
ECM/Subject/Noosa Plan Planning Scheme
Attachments 1. The Noosa Plan 2006 – Ten Year Review
EXECUTIVE SUMMARY
Not applicable.
RECOMMENDATION
That Council note the report by the Planning Scheme Project Manager to the Planning &
Environment Committee Meeting dated 6 September 2016 in relation to the proposal to prepare a
New Planning Scheme and:
A. Endorse the document The Noosa Plan 2006 - Ten Year Review as provided at
Attachment 1 to the report;
B. Propose to prepare a new Planning Scheme for the whole of Noosa Shire;
C. Authorise the Chief Executive Officer to prepare a Statement about State Interests; and
D. Advise the Minister of this decision.
REPORT
This report is intended to enable Council to formally resolve to prepare a new planning scheme to
replace The Noosa Plan 2006.
1. Planning Legislation
The Noosa Plan 2006 was prepared under the Integrated Planning Act 1997. Since
commencement of The Noosa Plan, planning legislation has changed with commencement of the
Sustainable Planning Act 2009 which remains current. However the Queensland Parliament
recently passed the Planning Act 2016 which is anticipated to have effect in mid-2017.
This report recommends Council makes a decision to prepare a new planning scheme under the
Sustainable Planning Act 2009. Transitional provisions of the Planning Act 2016 enable the
planning scheme making process to be continued seamlessly under that Act when it takes effect
in 2017 (Section 286 of the Planning Act applies).
A planning scheme prepared under Queensland legislation ultimately requires approval of the
Minister, and to facilitate this process, the State Government provides specific guidance material
to councils in preparing new planning schemes. Apart from addressing local planning issues, a
new planning scheme is required to take account of broader inputs from the State Government
and these are called State Interests. The legislation outlines the process for preparing a new
planning scheme and more detailed requirements and specifications are contained in the
statutory guideline ‘Making and Amending Local Planning Instruments’.
Page 70 of 118
Section 71
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
2. The Noosa Plan 2006
The Noosa Plan commenced in February 2006 and built upon the approaches of the previous
town planning scheme, including the innovative 1997 Strategic Plan.
The Integrated Planning Act introduced a performance-based planning system for Queensland
and also a single integrated development assessment system. While previous planning schemes
had been very prescriptive, newer schemes were reliant on delivering (or at least enabling)
outcomes.
The Noosa Plan 2006 contains a Strategic Framework and Community Vision (which plays no
role in development assessment) and Desired Environmental Outcomes. It introduced a range of
development assessment provisions such as locality codes, land-use codes and mapping
overlays. The core provisions of The Noosa Plan were the land use zoning maps, use definitions
and the tables of assessment that indicated the type of process to be used to assess
development types.
The State Government also introduced triggers that required specified development applications
to be referred to various State agencies for assessment as part of the development process.
The SEQ Regional Plan 2005 also had a statutory influence on the provisions of planning
schemes in south-east Queensland, especially in relation to development outside of the Urban
Footprint.
3. The Sustainable Planning Act 2009 (SPA)
The Noosa Plan 2006 has similar effect under the Sustainable Planning Act as the Integrated
Planning Act, being authorised under transitional provisions. Section 91 of the SPA requires
councils to undertake a ten-year review of their planning schemes. The review must include an
assessment of the achievement of the strategic outcomes stated in the planning scheme. From
the review Council must:
(a) propose to prepare a new scheme; or
(b) propose to amend the scheme; or
(c) if the local government is satisfied the scheme is suitable to continue without
amendment—decide to take no further action.
Attached to this report is a review of The Noosa Plan. The review concludes that The Noosa
Plan has served Council and the Noosa community well but a new scheme is desirable for the
following reasons:
Queensland Parliament has passed two planning Acts since 2006,
New and updated plans and strategies have been adopted by Council in the interim, and
It would be desirable to refresh many of the provisions.
Upon Council deciding to make a new planning scheme, the Minister is to be advised of that
decision. According to the statutory guideline, the notification to the Minister is to be
accompanied by a statement of the State interests expressed in a regional plan or State Planning
Policy the local government considers relevant, and how these may be integrated within the
proposed planning scheme. The statutory guideline also sets out the process for the State
Government to respond to Council about State interests. This information is important for the
drafting of the new planning scheme and the timing of this report is intended to allow sufficient
time for the State Government to respond this calendar year.
Page 71 of 118
Section 72
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Previous Council Consideration
Council, at its meeting of 6 March 2014 resolved to commence the process of making planning
scheme amendments to the Noosa Plan. At the same time, Council resolved not to proceed with
the previous Sunshine Coast Regional Council Draft Planning Scheme process which applied to
the Noosa Shire area.
In March 2014 Council undertook a detailed assessment of issues requiring to be addressed in
The Noosa Plan. It was felt at the time that as a new organisation there were more pressing
priorities than commencing a new planning scheme and that until Council had determined its
policy position on a range of issues it would be premature to even undertake a new Strategic
Framework. Therefore work commenced on a “fine tune” of The Noosa Plan rather than a
“redraft”.
Following Councillor workshops and preliminary consultation, Council, at its meeting of 28 August
2014 resolved to amend the planning scheme, in regard to various issues. These amendments
are yet to take effect.
Council has also initiated a review of the Priority Infrastructure Plan to bring it into compliance
with the Sustainable Planning Act as a Local Government Infrastructure Plan.
In December 2015 Council considered a report that provided an overview of the timeline,
resource requirements, estimated budget and other considerations for undertaking a new
planning scheme project. As a consequence, budget provision has been made for preparing the
new scheme and assembling a project team.
Finance & Risk
Council considered the following estimated project costs at its meeting in December 2015.
The risks of not having in place an appropriate planning scheme could be detrimental to the
Noosa community, the Noosa environment, future business and employment opportunities and
the efficient use of land and infrastructure.
Consultation
External Consultation - Community & Stakeholder
Nil. This report is solely intended to enable Council to determine whether to continue with The
Noosa Plan, amend it or replace it. Given there is a strong case for replacement of The Noosa
Plan, community consultation is not seen as being a necessary step to this decision. If Council
does decide to prepare a new planning scheme then there will be extensive community
engagement in that process.
Page 72 of 118
Section 73
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Internal Consultation
Planning and Environment staff were consulted about this report.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer to the Mayor & CEO Community Facilities Financial Services
Executive Support Community Development ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property & Facilities
Waste & Environmental Health Revenue Services
Executive Office Planning & Infrastructure
Community Engagement Building & Plumbing Services
Customer Service Civil Operations
Economic Development Infrastructure Planning & Design
Governance X Planning & Environment
Human Resources Strategic Land Use Planning
Sustainability
Page 73 of 118
Section 74
ATTACHMENT 1
Page 74 of 118
: om: aoe per: fas ee
_" 5 NOOSA COUNCIL - Se ae pnsgenssie
ae ; _— 7
The Noosa Plan 2006
Ten Year Review
The Noosa Plan ey
=
dep as a ee Tea
a oe
Glee M a elie msteat il ———
: tore
Page 74 of 118Section 75
Page 75 of 118
© Noosa Council 2046
General Enquiries:
By telephone: (07) 5329 6500
Fax: (07) 5329 6501
Street Address: 9 Pelican Street, TEWANTIN
Postal address: PO Box 141, TEWANTIN QLD 4565
Page 75 of 118Section 76
Page 76 of 118
a bi Ay & Ni
4 a +
Zz O ©
2 S|] w NN] oll vo
: S| a) SiS) 3) 8) 2] OS
3/8] 8 213| a
p =| 3/5 g|| 9
5
ND 1 21S of pels} O
s : = O|] ©
3 i s)/2) oO) a SiS) th
. | 8) Se] al ers
| Pst otal: | ay C)
H i} Of Uy] Sy Su:
© i] Sf Of Sl Stil a O
5 sie: i apo : || ©
~< Pie Oth oye slo 5S
@O = |: oO : {TO
© PHEW SPS) Sy iy Slo occ
a ii | py a Oye tl: CO
ry Pit | St ay aye de
<. Pi Tt SESH of ETE DS
® DHE of Sf Sidi or
= EWE | SP Se Si yi] W
PW: yd Sy Sy Oye |:
Pi SEO ae ye
Pe | SIS Shi Wi
ii}: ©] Ol: |:
» |i is Mil: |p:
iW: |} Dye Payee dy
PHEW Ye Pe Ene
Di | Sys de die ie
vu PREVEqE WE qEdE
a y PE Wide di qd:
a DYE WE PE WE WE WE
@o O rye dpi des dP: qi di:
3 ~ orl iL ol] lL pl pj
°
=>
—_
—_
©Section 77
Page 77 of 118
1. Purpose of this Report
The Noosa Plan commenced in 2006 and was prepared pursuant to the Integrated Planning Act
1997. The Sustainable Planning Act 2009 replaced the Integrated Planning Act, but authorised the
continued operation of planning schemes under transitional provisions.
Section 91 of the Sustainable Planning Act requires Councils to undertake a ten-year review of
their planning schemes. From the review Council must:-
1. Propose to prepare a new scheme,
2. Propose to amend the scheme, or
3. If Council is satisfied the scheme is suitable to continue without amendment - decide to take
no further action.
This report provides a review of The Noosa Plan for the purposes of Section 91 of the Act. The
only specification included in the Act about the review is that it must include an assessment of the
achievement of the strategic outcomes stated in the planning scheme.
2. Background
2.1 Legislative context of The Noosa Plan
The Integrated Planning Act 1997 introduced a performance-based planning system for
Queensland and also a single integrated development assessment system. The Sustainable
Planning Act 2009 built upon those foundations.
A performance-based planning system characterises development outcomes (as opposed to the
specific standards that were applied previously). Proposed development is tested against
measures included in codes and should be meeting specific outcomes by complying with probable
solutions. However the assessment involves a wide degree of flexibility and development can
propose alternative solutions provided the outcomes are met and if they are not, there must be
alternate demonstration of compliance with higher levels of policy.
The integrated development assessment system is built around a founding principle that there be
only one assessment manager for every development application. Other authorities may have an
influence on the development decision but their involvement and level of authority is governed by
regulation. Most development applications have a Council as the assessment manager but a
notable exception is building works development which may be assessed and decided by a private
building certifier.
The Noosa Plan 2006 complied with those systems and introduced a range of new development
assessment provisions such as locality codes and land-use codes. Mapping overlays had the
effect of adding the provisions of an overlay code to assessment of development on land identified
by the overlay.
The Noosa Plan 2006 — Ten Year Review Page 2
Page 77 of 118The text continues on section 78.