PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Stormwater Drainage
37. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in compliance with a development
permit for operational works and must include in particular:
a. Stormwater collection and pipe system in accordance with the requirements of
latest Queensland Urban Drainage Manual (QUDM) and related guidelines.
b. Stormwater retention and/or detention systems must be provided within the
property to ensure all stormwater runoffs from the site are maintained to its
predevelopment rates for all storm events up and including 1% AEP.
Electricity and Telecommunication Services
38. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
39. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements
40. Prior to issue any Development Permit for Operation works the applicant must
provide confirmation of a registered access easement has been created over the
adjoining site, Lot 3 SP221524, to accommodate the proposed temporary turning
circles of 9.0 metre in radius and 4.0 metre wide road shoulder for batter and
retaining works generally in accordance the approved plans.
41. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property. All easements must be designed in
accordance with the planning scheme and granted at no cost to the Grantee. Where
the Grantee is Council or a service authority, the easement documentation must be in
accordance with the Grantee’s standard easement terms.
42. Draft easement documentation must be submitted to Council for endorsement.
43. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
44. All excavation and fill and associated batters and retaining works must be undertaken
in accordance with an Operational Works approval and contained entirely within the
subject site unless written permission from the respective landowner(s) is provided to
Council.
45. All works must be carried out in accordance with a site-specific geotechnical
investigation report prepared by a qualified person* and submitted for endorsement
by Council as part of the Development Application for Operational Works. The
geotechnical investigation must be undertaken in accordance with the relevant
provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential
Development and address all stability issues concerning the development site.
*(Refer to Advisory Note)
Page 10 of 118
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.