PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
Vegetation Covenant
7. A vegetation protection covenant must be registered against the titles of the properties over
the area Vegetation Covenant on the Plan M2683-01B-RP.dwg pursuant to Section 97A of
the Land Title Act 1994. The covenant document and a survey plan must be submitted to
Council for endorsement prior to lodgement with the relevant titles authority for registration
of title. The covenant document must:
a. incorporate the requirements of this Decision Notice
b. include Noosa Council as Covenantee.
c. reference Queensland Land Title Registry Standard Terms Document No.
715597513
8. If a provision included in the covenant document is requisitioned or refused registration by
the relevant titles authority, a substitute provision must be included in the document which
as nearly as practicable addresses the objective sought by the requisitioned or refused
provision. The wording of the substitute provision must be agreed by Council.
ENGINEERING
Site Access and Driveways
9. A sealed access driveway must be provided from David Low Way to all lots. The works
must be undertaken in accordance with an Operational Works approval and be generally in
accordance with drawing number M2683E DR01 Revision A and must include in particular:
a. a driveway crossover generally in accordance with Council’s standard drawing
b. a driveway width of 5.5 metres extending from the edge of the road formation to the
property boundary
c. a passing opportunity (minimum 5.5 metres wide) between the front property
boundary and the access to Lot 2
d. a sealed driveway minimum 3.0 metres wide for the remainder of the access handle,
e. underground service conduits for all utility services.
f. the works (benching and clearing) required within the David Low Way road reserve to
construct a complying access
10. Vehicle access to Lots 1 & 2 is limited to the constructed driveway only. A clause must be
included in the contract of sale for Lots 1 & 2 which requires vehicle access to be from the
constructed driveway only, and which prohibits the driveway from being relocated without
Council agreement.
Stormwater Drainage
11. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Electricity and Telecommunication Services
12. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with an approval for Operational Works and the standards and requirements of
the relevant service provider.
13. Unless otherwise stipulated by telecommunications legislation at the time of construction,
the development must be provided with all necessary conduits, pits and pipes to
accommodate the future connection of optic fibre technology telecommunications.
14. Certification must be submitted to Council from all relevant service providers which certifies
that the development has met the requirements of this Decision Notice and all applicable
legislation at the time of construction.
Page 38 of 118
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.