PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2016
21. All entry statements, fences, batters, retaining walls and buffer/screen plantings must
be located entirely within private land and not within the public road reserve.
22. The existing vegetation along the Resort Drive frontage road reserve, eastern road
reserve and located outside of the 6m zone in the southern road reserve must be
retained in accordance with an Arborist Report prepared by a qualified person* and
endorsed through an Operational Works approval.*(Refer to Advisory Note)
Fauna Management
23. Vegetation must only be removed or disturbed in accordance with a Fauna
Management Plan prepared by a qualified person* and endorsed through an
Operational Works approval.
*(Refer to Advisory Note)
24. Any domestic cats kept on the property must be permanently confined within
buildings and/or cat enclosures for the purpose of protecting proximate wildlife. All
and successive community management statements must include a provision to
enable the enforcement of this requirement.
Bushfire Management
25. The development must be carried out in accordance with section 7.0 of the Bushfire
Hazard Assessment and Management Plan (document ref. AA1345BFIRE Rev.3)
dated prepared by Duke Environmental listed within this Decision Notice.
26. A copy of the Bushfire Hazard Assessment and Management Plan listed within this
Decision Notice must be provided to the nearest fire authority.
27. Certification must be submitted to Council from a qualified person* which certifies that
the development has been constructed in accordance with the bushfire management
conditions of this Decision Notice, prior to the commencement of use. *(Refer to
Advisory Note)
ENGINEERING
External Works
28. External works, pathways, must be provided in accordance with an Operational
Works approval, unless already constructed, and must include in particular:
a. A new 2.0 metre wide concrete pathway must be constructed along the full
length of the eastern boundary lines for Lot 6 SP178340 (this property) and Lot
3 SP 221524 (the adjoining site) generally within the created pathway reserve
and to alignment protects existing trees.
b. A new concrete pathway must be constructed within the unformed road reserve
south to the site. This pathway shall be constructed at meandering alignment
to negotiate the steepness of the terrain and the natural vegetation. This
pathway must connect to the pathway along the eastern boundary and connect
to the existing cul-de-sac end of Resort Drive, and shall be 2.0m wide and
reduced to a minimum width of 1.5 meter where necessary to protect existing
vegetation.
The pathways must be designed and constructed in accordance with relevant
standards and best engineering practice using method/s of construction that
minimising impact on natural flora and fauna and maintenance needs also ensuring
pedestrian safety.
This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
being non-trunk infrastructure.
Page 8 of 118
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.