Original source · versioned page text
2016-09-06 - Planning & Environment Committee Agenda
The original of this document is very large (23.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ATTACHMENT 2
Page 91 of 118
ATTACHMENT 2
PO Box 120 Coolum Beach Qld 4573
Hydrology & Water Mob 0405 1946
. Email [email protected]
Management Consulting Web www. hydrologyandwater.com.au
ABN 25 153 466 981 ACN 153 466 981
4" May 2016 Our Reference: J00225Lt1V4
Noosa Council
By email: [email protected]
Effectiveness of Debris Removal in Relation to Property Protection at Noosa Parklands.
1. INTRODUCTION
Hydrology and Water Management Consulting Pty Ltd (HWMC) has been commissioned to provide
Noosa Council with advice in relation to the effectiveness of removing debris from the Noosa
Parklands floodplain and creeks, specifically in relation the potential for protecting properties from
flooding. For the purpose of this report, the term debris encompasses the range of naturally
occurring loose ‘woody’ material found on the floodplain and within creek banks. It covers materials
such as palm fronds, sticks, branches and fallen logs.
HWMC is a specialist hydraulic consultancy that has considerable experience carrying out flood
investigation for local governments and the development industry. We are based on the Sunshine
Coast and over the last few years we have carried out several flood investigations on behalf of
Noosa Council. This includes development of the Daintree Estate flood mitigation strategy situated
in the adjacent catchment to the north of Noosa Parklands.
2. SCOPE OF WORK
This project has been carried out in accordance with the agreed scope of works which has included
the following key tasks:
e Review of background material
e Field visit to gain appreciation of catchment and floodplain.
e Analysis of historical rainfall
e Reporting
3. BACKGROUND
Residents at Noosa Parklands have expressed concern about the frequency that flooding is
occurring through the Parklands. The community has expressed concern that the accumulation of
wooden debris and palm fronds across the floodplain and within the creek channels exposes their
homes to an increased flood risk.
In order to help understand this risk, Noosa Council have commissioned HWMC to carry out this
investigation which is being undertaken in combination with the Noosa Parklands Park Management
Plan.
Image 3-1 is a photo taken which shows the extensive covering of fallen palm fronds across the
forest floor.
Residents have also expressed concern over the planting of Lomandra within the floodplain. There
concerns are that the Lomandra plants hold back floodwaters and increase flood levels near their
properties.
ee ee eee eee eee eee eee eee ee ee eee eee ee ee eee eee eee ee
Page 91 of 118See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.