Original source · versioned page text
2016-09-06 - Planning & Environment Committee Agenda
The original of this document is very large (23.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 96 of 118
< Management Consulting
8. CONCLUSSIONS
Clearing of the natural debris from the Wooroi Creek floodplain and creek system would be
expected to provide only a marginal and relatively short term potential reduction in major event peak
flood levels through the estate. Generally, clearing of natural debris from a natural creek system is
not considered best practice for flood mitigation. The main exception to this is where debris is
located near a hydraulic structure that is at risk of becoming blocked.
It is noted that there may be other reasons to carry out certain debris clearing activities, such as
improved amenity, however the benefits of these would need to be weighed against the monetary
and environmental cost of these activities.
Please feel free to contact us with any queries and we look forward to hearing any feedback you
may have.
Kind Regards,
Rob Stewart MIEAust CPEng
Director
RPEQ 13272
Enc: Chart of Historic Rainfall Intensities
|
Page 96 of 118See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.