Negotiated Report (Representations made) MCU22 0145 [As Published] · MCU22/0145
C1.0 - Basement Floor, prepared by Chris 21.11.23
Clout Design
C1.1 - Ground Floor, prepared by Chris Clout 21.11.23
Design
C1.2 - Level 2, prepared by Chris Clout 21.11.23
Design
C1.3 - Level 3, prepared by Chris Clout 21.11.23
Design
C1.4 - Level 4, prepared by Chris Clout 21.11.23
Design
C3.0 - Section 1 prepared by Chris Clout 21.11.23
Design
C3.2 - Section 3 prepared by Chris Clout 21.11.23
Design
C3.5 - Section 6 prepared by Chris Clout 21.11.23
Design
The following plans require amendment.
Plan No. Rev. Plan/Document Name Date
C2.0 - Elevation (East) prepared by Chirs Clout 21.11.23
Design
C2.1 - Elevation (West) prepared by Chris Clout 21.11.23
Design
C2.2 - Elevation (South) prepared by Chris Clout 21.11.23
Design
C2.3 - Elevation (North) prepared by Chris Clout 21.11.23
Design
C3.1 - Section 2 prepared by Chris Clout Design 21.11.23
C3.3 - Section 4 prepared by Chris Clout Design 21.11.23
C3.4 - Section 5 prepared by Chris Clout Design 21.11.23
C3.6 - Section 7 prepared by Chris Clout Design 21.11.23
C3.7 - Section 8 prepared by Chirs Clout Design 21.11.23
Amendments • The balustrades, acrylic pool window, planter boxes on
rooftop terrace must not exceed a maximum height of 1.2
metres as generally depicted on Drawing Numbers C2.0,
C2.1, C2.2, C2.3 and dated 4 July 2023 and to the
reasonable satisfaction of the Manager Development
Assessment.
Page 7 of 8
Document Set ID: 22712822
Version: 5, Version Date: 22/12/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU22 0145 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 417 KB (small file)
- File type
No other editions are linked here.