SARA reference:        2204-28387 SRA
Council reference:     MCU22/0048 OPW22/0089
Applicant reference:   21280



26 May 2022

Chief Executive Officer
Noosa Shire Council
PO Box 141
Tewantin Qld 4565
[email protected]

Attention:       Lisa Pienaar


Dear Ms Pienaar


SARA response—222 Gympie Terrace, Noosaville
(Referral agency response given under section 56 of the Planning Act 2016)

The development application described below was confirmed as properly referred by the State
Assessment and Referral Agency (SARA) on 20 April 2022.


Response
Outcome:                            Referral agency response – with conditions.
Date of response:                   26 May 2022
Conditions:                         The conditions in Attachment 1 must be attached to any
                                    development approval.
Advice:                             Advice to the applicant is in Attachment 2.
Reasons:                            The reasons for the referral agency response are in Attachment 3.


Development details

Description:                        Development permit         Operational work for prescribed tidal works
                                                               Material change of use for a landing
                                                               (commercial)

SARA role:                         Referral agency
SARA trigger:                      Schedule 10, Part 17, Division 3, Table 1 (Planning Regulation 2017)


                                                                             South East Queensland (North) regional
                                                                             office
                                                                             Mike Ahern Building, Level 3, 12 First
                                                                             Avenue, Maroochydore
 Page 1 of 9                                                                 PO Box 1129, Maroochydore QLD 4558
Log in to download the original file

2204-28387 SRA Response with conditions (MCU22_0048 & OPW22_0089).pdf · 345 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 8 pages

Page 2

                                                                                                 2204-28387 SRA




                                        Tidal works or work in a coastal management district

                                        Schedule 10, Part 17, Division 3, Table 2 (Planning Regulation 2017)

                                        Tidal works or work in a coastal management district

SARA reference:                         2204-28387 SRA
Assessment Manager:                     Noosa Shire Council
Street address:                         222 Gympie Terrace, Noosaville
Real property description:              Lot 160 on CP908649
Applicant name:                         Noosa River Enterprises Pty Ltd ACN 110693715 As Trustee Under
                                        Instrument 708121382
Applicant contact details:              C/- Project Urban (Trish Belt)
                                         PO Box 6380
                                         Maroochydore BC QLD 4558
                                         [email protected]




Representations
An applicant may make representations to a concurrence agency, at any time before the application is
decided, about changing a matter in the referral agency response (s.30 Development Assessment Rules)
Copies of the relevant provisions are in Attachment 4.

A copy of this response has been sent to the applicant for their information.

For further information please contact Caroline Plank, Principal Planning Officer, on (07) 5352 9709 or via
email [email protected] who will be pleased to assist.

Yours sincerely




Jamaica Hewston
Manager

cc      Noosa River Enterprises Pty Ltd ACN 110693715 As Trustee Under Instrument 708121382, C/- Project
        Urban, [email protected]

enc     Attachment 1 - Referral agency conditions
        Attachment 2 - Advice to the applicant
        Attachment 3 - Reasons for referral agency response
        Attachment 4 - Representations provisions
        Attachment 5 - Approved plans and specifications




 State Assessment and Referral Agency                                                               Page 2 of 9

Page 3

                                                                                                    2204-28387 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)


 No.     Conditions                                                                     Condition timing
 Operational work
 Planning Regulation 2017, Schedule 10, Part 17, Division 3, Table 1 – Tidal works or work in a coastal
 management district—The chief executive administering the Planning Act 2016 nominates the
 Director-General of the Department of Environment and Science to be the enforcement authority for
 the development to which this development approval relates for the administration and enforcement of
 any matter relating to the following conditions:
 1.      The construction of the finger pontoons must be carried out generally          For the duration of the
         in accordance with the following plans:                                        works
              Existing Structures Plan, prepared by Edge Consulting
                 Engineers, dated 13/10/21, reference 34680-03, revision A
              New Site Plan, prepared by Edge Consulting Engineers,
                 dated 13/10/21, reference 34680-04, revision A
              Vessel Mooring Site Plan, prepared by Edge Consulting
                 Engineers, dated 13/10/21, reference 34680-05, revision D
              Elevations, prepared by Edge Consulting Engineers, dated
                 13/10/21, reference 34680-07, revision A
 2.      For the proposed works, only use clean materials and ensure that               For the duration of the
         the works do not cause contamination.                                          works
 3.      Erosion and sediment control measures which are in accordance                  For the duration of the
         with Best Practice Erosion and Sediment Control (BPESC)                        works
         guidelines for Australia (International Erosion Control Association),
         are to be installed and maintained to prevent the release of sediment
         to tidal waters.
 4.      Should the finger pontoons collapse, fail or otherwise suffer                  As soon as reasonably
         structural consequences which impact their integrity or ability to             practicable subsequent
         function as intended, the works must be:                                       to the damage
             (a) reinstated in accordance with this development approval; or
             (b) removed and disposed of at an appropriately licensed
                 facility.
 5.      Submit “As Constructed drawings” to [email protected] or mail                Within two weeks of
         to:                                                                            the completion of the
            Department of Environment and Science                                       works
            Permit and Licence Management
            Implementation and Support Unit
            GPO Box 2454
            Brisbane Qld 4001
 6.           (a) In the event that the works cause disturbance or oxidisation          (a) Upon disturbance
                  of acid sulfate soil, the affected soil must be treated and               or oxidisation until
                  thereafter managed (until the affected soil has been                      the affected soil
                  neutralised or contained) in accordance with the current                  has been
                  Queensland Acid Sulfate Soil Technical Manual: Soil                       neutralised or
                  management guidelines, prepared by the Department of                      contained
                  Science, Information Technology, Innovation and the Arts,             (b) At the time the
                  2014.                                                                     soils have been
              (b) Certification by an appropriately qualified person, confirming            neutralised or
                  that the affected soil has been neutralised or contained, in              contained
                  accordance with (a) above is to be provided to


 State Assessment and Referral Agency                                                                   Page 3 of 9

Page 4

                                                                                                       2204-28387 SRA




                 [email protected] or mailed to:
                   Department of Environment and Science
                   Permit and Licence Management
                   Implementation and Support Unit
                   GPO Box 2454
                   Brisbane Qld 4001

        Note: Appropriately qualified person means a person or persons who has
        professional qualifications, training, skills and experience relevant to soil
        chemistry or acid sulfate soil management and can give authoritative
        assessment, advice and analysis in relation to acid sulfate soil management
        using the relevant protocols, standards, methods or literature.
Planning Regulation 2017, Schedule 10, Part 17, Division 3, Table 2 – Tidal works or work in a coastal
management district — The chief executive administering the Planning Act 2016 nominates the
Director-General of the Department of Transport and Main Roads – Maritime Safety Queensland to be
the enforcement authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following conditions:
7.      The operational work must be carried out generally in accordance                For the duration of the
        with the following plan:                                                        works
             Cover Page, prepared by Edge Consulting Engineers, dated
                 2/11/21, reference 34680-01, revision O
             Existing Structures Plan, prepared by Edge Consulting
                 Engineers, dated 13/10/21, reference 34680-02, revision A
             Existing Structures Plan, prepared by Edge Consulting
                 Engineers, dated 13/10/21, reference 34680-03, revision A
             New Site Plan, prepared by Edge Consulting Engineers,
                 dated 13/10/21, reference 34680-04, revision A
             Vessel Mooring Site Plan, prepared by Edge Consulting
                 Engineers, dated 13/10/21, reference 34680-05, revision D
             Pontoon Layout Details, prepared by Edge Consulting
                 Engineers, dated 13/10/21, reference 34680-06, revision A
             Elevations, prepared by Edge Consulting Engineers, dated
                 13/10/21, reference 34680-07, revision A
             Pile Setout, prepared by Edge Consulting Engineers, dated
                 13/10/21, reference 34680-08, revision A.
8.      All vessels, structures, plant and equipment associated with the                While the works are
        construction of the approved works must be lit/marked in accordance             occurring
        with the following specifications and requirements such that
        undertaking the construction works does not cause a risk to the safe
        navigation of ships:
             (a) any anchors deployed must be marked with yellow buoys
                 and fitted with FL yellow lights fitted
             (b) lighting provided must not obscure, disguise or otherwise
                 interfere with the effectiveness of navigational lighting.
9.      The structure must be lit/marked in accordance with the following               At all times
        specifications, such that it does not cause a risk to the safe
        navigation of other ships:
            (a) pedestrian style lighting to gang way and/or retro reflective
                tape on pontoon piles
            (b) lighting provided must not obscure, disguise or otherwise
                interfere with the effectiveness of navigational lighting.
10.     The construction, operation or maintenance of the structure and any             At all times
        ship moored at this structure, must not impede the safe navigation of
        other ships or restrict safe access to or from neighbouring structures.
11.          (a) Any debris or similar obstruction encountered whilst                   (a) and (b) At all times
                 undertaking the work must be disposed of at the applicant’s


State Assessment and Referral Agency                                                                      Page 4 of 9

Page 5

                                                                                2204-28387 SRA




                 cost.
             (b) All piles and/or structures to be demolished, both above and
                 below the waterline, must be completely extracted/removed.




State Assessment and Referral Agency                                               Page 5 of 9

Page 6

                                                                                          2204-28387 SRA




Attachment 2—Advice to the applicant

General advice
1.      Terms and phrases used in this document are defined in the Planning Act 2016, its regulation,
        or the State Development Assessment Provisions, version 3.0. If a word remains undefined it
        has its ordinary meaning.




State Assessment and Referral Agency                                                         Page 6 of 9

Page 7

                                                                                            2204-28387 SRA




Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)

The reasons for SARA’s decision are:
 The development application is for a development permit for operational work (prescribed tidal works)
   and material change of use for a landing (commercial). This work is the refurbishment of the existing
   boat hire landing at 222 Gympie Terrace, Noosaville (Lot 160 on CP908649) (the subject site).
 The subject site is in the Noosa River and is encompassed by a seabed lease. The subject site
   immediately adjoins public reserve land and access is through Ely Park.
 The refurbishment will not result in an increase or intensity of the existing use, however, will involve
   the removal of some of the existing infrastructure and construction of new infrastructure.
 The subject site is in a tidal waterway subject to coastal processes and therefore has been assessed
   by SARA against the State Development Assessment Provisions (SDAP), version 3.0, State code 8:
   Coastal development and tidal works (State code 8). SARA finds that the development complies with
   State code 8, subject to conditions to:
        o ensure the development is carried out generally in accordance with the plans of development
            submitted with the application
        o ensure the development avoids or minimises adverse impacts on coastal resources and their
            values
        o ensure landowners are aware they must take responsibility for their damaged property as
            they can impact on coastal resources and public safety
        o allow for compliance in relation to what is considered generally in accordance with the
            approved plans when preliminary plans are submitted with the application. Development
            inconsistent with the approval may have an impact on coastal management that was not
            considered in assessment
        o ensure any disturbance to acid sulfate soils is managed to prevent impacts to coastal
            environments.
 The subject site is in a waterway that is frequented by commercial and private vessels. The subject
   site is mapped as a developed marina and a high-risk maritime development zone. The navigation
   corridor is in close proximity to the subject site. As such, the development has been assessed by
   SARA against the SDAP, version 3.0, State code 7: Maritime safety (State code 7). SARA finds that
   the development complies with State code 7, subject to conditions to:
        o ensure the development is carried out generally in accordance with the plans of development
            submitted with the application
        o ensure that at all times, all lights on or above the development site do not interfere with safe
            navigation in surrounding waterways
        o ensure the safe navigation of other ships and unrestricted access to/from neighbouring
            structures
        o ensure the development does not encroach on the navigable waterway in a way that
            impedes the safe passage of vessels.

Material used in the assessment of the application:
 The development application material and submitted plans
 Planning Act 2016
 Planning Regulation 2017
 The SDAP, version 3.0, as published by the Department of State Development, Infrastructure, Local
   Government and Planning
 The Development Assessment Rules
 SARA DA Mapping system
 Human Rights Act 2019




 State Assessment and Referral Agency                                                          Page 7 of 9

Page 8

                                                2204-28387 SRA




Attachment 4—Change representation provisions
(page left intentionally blank)




 State Assessment and Referral Agency              Page 8 of 9

Page 9

                                                 2204-28387 SRA




Attachment 5—Approved plans and specifications
(page left intentionally blank)




 State Assessment and Referral Agency               Page 9 of 9

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.