Skip to the record
For the highest quality transcripts.

Original source · versioned page text

UPDATED 16.5.23 - 20210153 Maple St SWMP

of 71

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

is therefore able to achieve a lawful point of discharge into the Myall Street drainage system, as the
flow characteristics leaving the site are not altered in a way that would substantially impact or
damage third party property.



     2.5. Flood Considerations
Review of the Noosa Shire Council Intramaps flood layers including the Flood Hazards Overlay has
identified that the site is located outside of any flood or inundation areas within the locality indicating
it is not expected that that the proposed development will be subject to flooding.




Project number 20210153
File RECOR Preliminary Stormwater Management Report - 20210153.docx, 2022-03-31                                 Page 10 of 27
Revision 1

P +61 7 5211 1003                A 75 Noosa Drive, Noosa Heads Qld 4567           E [email protected]   recorconsulting.com

Log in to download the original (UPDATED 16.5.23 - 20210153 Maple St SWMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.