                4.2.1.3. MUSIC modelling results
The proposed treatment train for each site can achieve the required water quality improvements as
shown below in Table 4.3 - MUSIC Modelling results.

                                          Table 4.3 - MUSIC Modelling results.

  Pollutant                                 Sources           Residual            Percentage          Percentage
                                                              Load                Target              Reduction

  Total Suspended Solids (kg/yr)              479.402               75.52               80                 84.247

  Total Phosphorus (kg/yr)                      1.042               0.248               60                  76.17

  Total Nitrogen (kg/yr)                        6.637               2.514               45                 62.119

  Gross Pollutants (kg/yr)                     62.163                     0             90                      100



          4.2.2 Operational Maintenance
Periodic maintenance and monitoring of the bioretention area proposed for this development shall
be carried out to ensure it is operating effectively during the operational phase. The responsibility
for these maintenance activities shall be the body corporate or owner of the site.

The bioretention areas shall be maintained following a schedule of routine inspections undertaken
after every significant rainfall event (30mm of rainfall in a 24-hour period) or on a three-monthly
basis within the first twelve months and on a six-monthly basis thereafter. The inspection shall
ensure the proper functioning and condition of the bioretention area and ensure that the planting
and vegetation health is suitably maintained. An inspection checklist from the Healthy Waterways
Technical Design Guidelines for Southeast Queensland has been provided in Appendix
Bioretention Inspection Checklist that provides the structure for the inspections to be undertaken.

In addition to regular inspections, the first 4 months of establishment of the bioretention areas
requires a watering frequency of:

    i.    Week 1 - 6: 5 times per week


   ii.    Week 6-10: 3 times per week


  iii.    Week 11-15: 2 times per week


After 5 months, watering frequency shall be adjusted based on the local conditions to ensure plants
are maintained in a healthy state.




Project number 20210153
File RECOR Preliminary Stormwater Management Report - 20210153.docx, 2022-03-31                                       Page 21 of 27
Revision 1

P +61 7 5211 1003                A 75 Noosa Drive, Noosa Heads Qld 4567            E [email protected]     recorconsulting.com

Log in to download the original (UPDATED 16.5.23 - 20210153 Maple St SWMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.