UPDATED 16.5.23 - 20210153 Maple St SWMP

of 71

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 32, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                               1 METER MAX.                                 STAR PICKETS

                                                                                  PROVIDE WASH WATER FOR                                                                                                                   DROP INLET
                                                                                                                                                                                                                           WITH GRATE
                                TIMBER SLEEPER OR METAL                           TRUCKS EXITING SITE
                                GRID 100mm HIGH AND
                                                                                                                                                                                                                           WIRE OR STEEL MESH
                                SPACED AT 300mm CTS                                MIN LE                                                                                                                                  (14 GAUGE x 150mm                                                                                                                                                               WRAP FILTER
                                                                                         NGTH
                                                                                                10m                                                                                                                        OPENINGS) WHERE                                                                                                                                                                 CLOTH OVER GRATE




                                                                                                                                                                                                                                                                                                                                                                                                                                                           500 - 600mm
                                                                                                                   BERM 300 HIGH MIN                                                                                       GEOTEXTILE IS NOT
                              CONSTRUCTION SITE                                                                                                                                                                            SELF-SUPPORTING

                                                                                                                                                                                                                           WOVEN GEOTEXTILE                                                                                                                                                                                                                                                        1.5m STAR PICKETS AT MAX.
                                                                                                                         EXISTING ROADWAY                                                                                                                                                                                                                                                                                                                                                          2.5m CENTRES



                              GEOTEXTILE FABRIC                                                                                                                                                                    STAR PICKET                                                                                                                                                                                                                                                                     SELF-SUPPORTING
                                                                                                                                                                                                                   FITTED WITH                                                                                                                                                                                                                                                                     GEOTEXTILE
                                                                                   50-75mm GRAVEL BED MIN                                                                                                          SAFETY CAP
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               FLOW
                                                                                   200mm THICK                                                                                                                                                                                                                                                                                                                                                                                                  DIRECTION OF
                                                  RUNOFF FROM PAD DIRECTED TO                                                                                                                        WOVEN GEOTEXTILE
                                                                                                                                                       SANDBAGS
                                                  SEDIMENT TRAP
                                                                                                                                                                                                                       RUNOFF                                                                                                                                         WRAP FILTER CLOTH
                                                                                                                                                                                                                       WATER WITH                                                                                                   RUNOFF                            OVER GRATE                                                                                                                   ON SOIL, 150mm x 100mm
                                        TEMPORARY CONSTRUCTION VEHICLE EXIT




                                                                                                                                                                              FLOW
                                                                                                                                                                                                                       SEDIMENT                                                                                                     WATER WITH                                                                                                                                                     TRENCH WITH COMPACTED
                                                                SCALE: N.T.S.                                                                          WATERWAY                                                                                                                                                                     SEDIMENT                                                                                                                                                       BACKFILL AND ON ROCK, SET
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   INTO SURFACE CONCRETE

                                                                                                                                                       EXCAVATION




                                                                                                                                                                                                                                                                                                                                                                                                                                                           600mm MIN.
                                                                                                                                                                                                                                                                                                                                                                                         FILTERED                                                                                SECTION DETAIL
                                                                                                                                                                                                                                                                        FILTERED
                                                                                                                                                                                                                                                                                                                                                                                          WATER
                                                                                                                                                                                                                                                                         WATER
                                                                                                                                                                                                                      GEOTEXTILE
                                                                                                                                                       EARTH BANK                                                     EMBEDDED 150mm
                                                                                                                                                                                                                      INTO GROUND                                                                                                             GEOTEXTILE INLET FILTER TYPE B
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       20m MAX.




                                                                                                                                                                                                                                                                                                                                                                                                                                           MIN. 1.5m
                                                                                                                                                                                                                                                                                                                                                                        SCALE N.T.S
                                                                                                                                                                                                      FOR DROP INLETS AT NON-SAG POINTS,                                                                                                                                                                                                                                                               FLOW
                                                                                                                                                                                                      SANDBAGS, EARTH BANK OR EXCAVATION USED
                                                                                                                                                                                                      TO CREATE ARTIFICIAL SAG POINT                                                                                                                                                                                                                               STAR PICKETS AT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   MAX. 2.5m SPACINGS
                                                                                                                                                         GEOTEXTILE INLET FILTER CONSTRUCTION NOTES:                                                                                                                                                                                                                                                               TYPICAL

                                                                                                                                                         1.   FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES.

                                                                                                                                                         2.   PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES.                                                                                                                                                                                                                                                                               PLAN

                                                                                                                                                         3.   IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS OR EARTH
                                                                                                                                                              BANKS AS SHOWN IN THE DRAWING.

                                                                                                                                                         4.   DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS ADEQUATE TO
                                                                                                                                                              ALLOW FOR ALL WATERS TO BYPASS IT.                                                                                                                                                                                                                                                                                                DIRECTION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                         DISTURBED                                    1.5m STAR PICKETS AT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                OF FLOW
                                                                                                                                                                                       GEOTEXTILE INLET FILTER A                                                                                                                                                                                                                                                         AREA                                         MAX. 2.5m CENTRES

                                                                                                                                                                                                        SCALE N.T.S



                                        TIMBER SPACER TO SUIT                               KERB-SIDE INLET




                                                                                                                                                                                                                                                                                                                                                                                                                                                                         UNDISTURBED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                         AREAS

                                                                                            GRAVEL-FILLED WIRE MESH OR
                                                                                            GEOTEXTILE "SAUSAGE"


                                                           OVERFLOW                TIMBER SPACER
                                RUNOFF                                                                                                                                GRADIENT OF
                                                                                   TO SUIT                                                                                                                            CAN BE CONSTRUCTED                                ALL BATTER GRADES
                                WATER WITH                                                                                                                            DRAIN 1% TO 5%
                                                                                                                                                                                                                      WITH OR WITHOUT                                   2(H):1(V) MAX.
                                SEDIMENT
                                                                                                                                                                                                                      CHANNEL                                                                                                                                                                                                         SEDIMENT FENCE CONSTRUCTION NOTES:
                                                                                                                                                                                                                                                                                                                                                                                             STABILISE STOCKPILE SURFACE
                                                                                                                                                                      DIRECTION
                                                                                                                                                                                        OF FLOW                                                                                                                                                                                                                                       1.          CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL TO
                                                                                                                                                                                                                                                                                                                           EARTH BANK                                                      2:1                                                    THE CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE
                                                                                                                                                                                                                                                                                                                                                                                X.)




                                                                                                                                                                                                                                                                                .
                                                                                                                                                                                                                                                                                                                                                                                                 SL




                                                                                                                                                                                                                                                                              300mm MIN
                                   SEDIMENT                                                                                                                                                                                                                                                                                                                                MA                      OP                                             DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE
                                                                                                                                                                                                                                                                                                                                                                     P   E(                           E(
                                                                                                                                                                                                                                                                                                                                    FLOW                           LO                                   MA                                        CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
                                                                                        FILTERED WATER                                                                                                                                                                                                                                                            S                                          X.)
                                 GRAVEL-FILLED WIRE MESH                                                                                                                                                                                                                                                                                                      2:1                                                                                 CONCENTRATED AT ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN
                                 OR GEOTEXTILE "SAUSAGE"                                                                                                                                                                                                                                                                                                                                                                                          STORM EVENT, USUALLY THE 10-YEAR EVENT.
                                                                                                                                                                                                                             2m MIN
                                                                                                                                                                           150mm MIN




                                                                                                                                                                                                                                                                                                                                                                                                                                      2.          CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR THE
                                                                                                                                                                                                  NOTE: ONLY TO BE USED AS TEMPORARY BANK                                                                                                                                                SEDIMENT FENCE
                                                                                                                                                                                                                                                                                                                                                                                                                                                  BOTTOM OF THE FABRIC TO BE ENTRENCHED.
                                                                                                                                                                                                  WHERE MAXIMUM UPSLOPE LENGTH IS 80 METRES.
                                         MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES:
                                                                                                                                                                                                                                                                                                                                                                                                                                      3.          DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT
                                         1.   INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS.                                                                                                                                                                                                                               STOCKPILE CONSTRUCTION NOTES:                                                                                      THE DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE
                                                                                                                                                                      DIVERSION DRAIN CONSTRUCTION NOTES:                                                                                                                                                                                                                                         FITTED WITH SAFETY CAPS.
                                         2.   FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE                                                                                                                                                                                                                                  1.     PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING
                                                                                                                                                                      1.   BUILD WITH GRADIENTS BETWEEN 1% AND 5%.                                                                                                                    VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.                                    4.          FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS
                                              MESH LONGER THAN THE LENGTH OF THE INLET PIT AND
                                              FILL IT WITH 25mm TO 50mm GRAVEL.                                                                                                                                                                                                                                                                                                                                                                   ENSURING IT GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH
                                                                                                                                                                      2.   AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.                                                                                     2.     CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.                                                    WIRE TIES OR AS RECOMMENDED BY THE MANUFACTURER. ONLY USE
                                         3.   FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH                                                                                                                                                                                                                                                                                                                                                   GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
                                                                                                                                                                      3.   ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER                                                                                              3.     WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS
                                              x 400mm WIDE.                                                                                                                                                                                                                                                                                                                                                                                       SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
                                                                                                                                                                           IRREGULARITIES THAT COULD IMPEDE WATER FLOW.                                                                                                               THAN 2 METRES IN HEIGHT.
                                         4.   PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A                                                                                                                                                                                                                                                                                                                                      5.          JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.
                                                                                                                                                                      4.   BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL                                                                                            4.     WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE
                                              100mm SPACE BETWEEN IT AND THE KERB INLET. MAINTAIN                                                                          CROSS-SECTIONS, NOT "V" SHAPED.
                                              THE OPENING WITH SPACER BLOCKS.                                                                                                                                                                                                                                                         FOLLOWING THE APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO                                   6.          BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT
                                                                                                                                                                                                                                                                                                                                      LESS THAN 0.10.                                                                                             THOROUGHLY OVER THE GEOTEXTILE.
                                                                                                                                                                      5.   ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
                                         5.   FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT
                                              BYPASSING THE FILTER.                                                                                                   6.   COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS
                                                                                                                                                                                                                                                                                                                               5.     CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER                                                                             SEDIMENT FENCE
                                                                                                                                                                                                                                                                                                                                      AROUND STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.
                                                                                                                                                                           OF CONSTRUCTION.                                                                                                                                                                                                                                                                                     SCALE: N.T.S.
                                         6.   SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE
                                              MESH OR GEOTEXTILE PROVIDING THEY ARE PLACED SO                                                                                                        DIVERSION DRAIN                                                                                                                                                          STOCKPILES
                                              THAT THEY CAN FIRMLY ABUT EACH OTHER AND                                                                                                                                                                                                                                                                                                SCALE N.T.S
                                              SEDIMENT-LADEN WATERS CANNOT PASS BETWEEN.                                                                                                                      SCALE N.T.S
                                                    MESH & GRAVEL INLET FILTER
                                                               SCALE N.T.S




                                                                                                   North Point   Approved                                                                                                                                                                                                                              Project Address                                                        Title
                                                                                                                 BEN PARRY
                                                                                                                 RPEQ 28084                                                                                                                                                                                                                            45 MAPLE ST, COOROY, QLD 4563                                          EROSION AND SEDIMENT CONTROL DETAILS

                                                                                                                 For and on behalf of RECOR Pty Ltd.
                                                                                                                 Scale                                                                                                                  ENGINEERING + PROJECT MANAGEMENT                                                                               Client Details                                                         PROJECT NAME:                                                         Project Number                           Sheet Size
                                                                                                                                                                                                                                        SUNSHINE COAST | BRISBANE | SYDNEY
 B    28/04/23   RFI UPDATE                                                  QT         BP                                                                                                                                             www.recorconsulting.com | ABN 89 647 469 707                                                                    MARK MELVILLE                                                          COOROY NDIS RESIDENTIAL 20210153                                                                                 A1
 A    28/03/22   MCU ISSUE                                                   JAC       BRP
                                                                                                                                            AS SHOWN                                                COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's client. This                                                                                          DEVELOPMENT             Drawing Number                                                                          Revision

                                                                                                                                                                                                                                                                                                                                                                                                                                                      031                                                                                       B
                                                                                                                                                                                                  drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as 'Issued For Construction' in

Rev   Date                   Revision Description                        Drawn Check                                                  DO NOT SCALE, IF IN DOUBT ASK                                                                                             the revision description.

Log in to download the original (UPDATED 16.5.23 - 20210153 Maple St SWMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.