UPDATED 16.5.23 - 20210153 Maple St SWMP
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
INTRODUCTION RECOR has been engaged to prepare a Stormwater Management Report to accompany a development application for a Residential Development consisting of 11 units for NDIS accommodation. This report investigates the stormwater management considerations for the existing and proposed development site and assesses how the run-off from the site is to be managed in accordance with Noosa Shire Council requirements for stormwater drainage. The report and revised plan set attached include updates to address the concerns raised by Council with respect to stormwater management in their Information Request dated 17/02/23 (Ref: MCU23/0007 | RAL 23/0001), including: Earth Bank Discharge 3. Provide additional detail demonstrating where and how the runoff from the proposed Earth Bank will discharge. The additional detail must be prepared by a suitably qualified person (RPEQ – Registered Professional Engineer of Queensland). Stormwater Discharge 6. Provide an amended Stormwater Management Plan that demonstrates how stormwater collected on-site will be controlled, collected, and released without causing scour damage to neighbouring properties or creating trip hazards for pedestrians. The additional detail must be prepared by a suitably qualified person (RPEQ – Registered Professional Engineer of Queensland) and include, but not be limited to: a. provide comment on the water quality of the stormwater collected in proposed stormwater line ‘D’ that bypasses the bioretention swale; b. demonstrate the lid type of proposed stormwater structure 1/A and how the structure will be constructed to avoid trip hazards in the road reserve; and c. demonstrate that the existing services along the Myall Street frontage will not be impacted by proposed stormwater lines 2/A – 1/A and 1/A – EX/A (including vertical clearances). Stormwater Quality 7. Provide updated plans, SWMP and MUSIC model which only applies nutrient removal rates for proprietary products if they have been verified through SQIDEP 8. Provide survey of the downstream existing pit in Myall St in order to demonstrate that the bioretention sub-soil drains can freely discharge. Sustainable Building Design Code 9. Provide updated plans and a SWMP which incorporates rainwater collection and reuse at the site, sufficient to supply external non-potable fixtures such as communal landscape irrigation and bin washdown Project number 20210153 File RECOR Preliminary Stormwater Management Report - 20210153.docx, 2022-03-31 Page 5 of 27 Revision 1 P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (UPDATED 16.5.23 - 20210153 Maple St SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.