Original source · versioned page text
A221308a
Attached to the e-mail 25 Pavilion St - Response to information Request - Op Works 20_0104.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
LEGEND
GENERAL NOTES
EXISTING
1. NO OTHER SERVICES TO ENCROACH INTO THE STANDARD
OVERHEAD CABLE UNDERGROUND ELECTRICITY CORRIDOR OF 0mm - 900mm FROM RPA.
2. ALL CABLES TO BE INSTALLED IN CONDUIT WITHIN THE STANDARD
PROPOSED ELECTRICITY ALIGNMENT ALLOCATED BY THE LOCAL COUNCIL. WHERE
OVERHEAD CABLE CONDUITS VARY FROM THIS AND AT FOOTPATH CROSSING PROTECTIVE
STRIP IS TO BE INSTALLED. WHERE PRACTICAL ELECTRICITY CABLES
SHALL NOT BE CLOSER THAN 250mm TO THE REAL PROPERTY
EXISTING
UNDERGROUND BOUNDARY.
CABLE
3. A, B OR C WHEN SHOWN BESIDE LV PILLARS DENOTES SERVICE
PHASING.
25 PAVILION STREET, POMONA
PROPOSED
UNDERGROUND
CABLE
4. THE CONTRACTOR SHALL MEASURE ACTUAL CABLE LENGTHS
REQUIRED ON SITE AFTER INSTALLATION OF CONDUITS THEN NOTIFY
E ENERGEX/SUPPLIER WHEN CONFIRMING CABLE ORDER.
PROPOSED
ELECTRICAL 5. ALL BENDS INSTALLED ON 80mm,100mm AND 125mm RETICULATION
SERVICE CONDUIT
CONDUITS MUST BE 1830mm RADIUS UNLESS OTHERWISE SPECIFIED.
ET
PROPOSED 6. CONTRACTOR TO SUPPLY ALL LABELS AND SITE ID NUMBERS TO
ELECTRICAL & ENERGEX SPECIFICATION.
COMMUNICATION
SERVICE CONDUITS 7. WHEN CROSS ROAD CONDUIT FINISHES OPPOSITE A TRUNCATION PEG,
TREE STREET PROPERTY SIDE OF TRENCH TO BE 300mm ALIGNMENT FROM PEG.
POLE 8. WHERE CROSS-ROAD ELECTRICITY CONDUITS RUN PARALLEL TO
TRANSFORMER OTHER SERVICES OR CONDUITS, A MINIMUM SEPARATION OF 1.0m MUST
BE MAINTAINED.
PADMOUNT 9. CIVIL CONTRACTOR TO INSTALL ALL CROSS ROAD CONDUITS.
TRANSFORMER
9 10. CO-ORDINATE CONDUIT INSTALLATION WITH COMMUNICATIONS
7 8 CARRIER CONTRACTORS.
PAVILION STREET
6
600
HV POLE 11. ELECTRICITY PILLARS TO HAVE 600mm EXCLUSION ZONE. NO
NON-ENERGEX ASSETS TO BE INSTALLED WITHIN THIS EXCLUSION
ZONE.
HV / LV POLE
HANSEN PLACE 12. ENERGEX REQUIRE 1.0m CLEARANCE BETWEEN SERVICE PILLARS AND
DRIVEWAYS. IF LESS THAN 1.0m SEPARATION THEN PROTECTIVE
BOLLARDS MUST BE INSTALLED.
LV POLE
CONSTRUCTION CONTRACTOR
1
HV UNDERGROUND 10 5 4 3 2 THE CONTRACTOR SHALL BE RATED BY ENERGEX FOR THE FOLLOWING
POLE TERMINATION PROCESS.
WCS 2 - UNDERGROUND CONSTRUCTION
WCS 31 - COMMISSIONING AND OPERATION OF THE NETWORK
LV UNDERGROUND
WCS 34 - EARTHING SYSTEMS
POLE TERMINATION WCS 61 - UNDERGROUND CIVIL CONSTRUCTION
SANDY STREET STANDARDS AND SPECIFICATIONS
AERIAL STAY
THIS WORKS PLAN IS TO BE READ IN CONJUNCTION AND COMPLY WITH THE
FOLLOWING ENERGEX MANUALS AND SPECIFICATIONS
GROUND STAY
· UNDERGROUND DISTRIBUTION CONSTRUCTION MANUAL
· WCS 61.1 - UNDERGROUND TRENCHLESS TECHNOLOGY
· NETWORK LABELLING AND SIGNAGE MANUAL
EARTH
LOCALITY PLAN
NOT TO SCALE CONSUMER'S INSTALLATION SHALL COMPLY WITH AS/NZS 3000:2018 - SAA
WIRING RULES.
EXISTING PILLAR FOR DETAILS OF TRENCH CROSS-SECTIONS, REFER TO ENERGEX
UNDERGROUND DISTRIBUTION CONSTRUCTION MANUAL.
STREETLIGHTING CERTIFICATION CERTIFICATE OF COMPLIANCE
PROPOSED PILLAR
This lighting design is certified to comply generally with the nominated categories
ON SITE SERVICES CHECKS
DESIGN DOCUMENTATION IN ACCORDANCE WITH THE REQUIREMENTS OF:
of AS/NZS 1158.3.1:2020 (P Category) for luminaires supplied on the following UNDERGROUND SERVICES SHOWN ON THIS WORKS PLAN IN THE VICINITY
APPLICABLE STANDARD : AS/NZS 1158.3.1:2020 OF PROPOSED EXCAVATION WORKS HAVE BEEN TAKEN FROM ASSET
LINK PILLAR roads within this design : OWNER'S PAPER RECORDS AND ARE INDICATIVE ONLY.
CALCULATION SOFTWARE : PERFECT LITE v5.06
240LV
D
HANSEN PLACE PR6 Lighting Category THE CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF DAMAGE TO ANY
EXISTING UNDERGROUND ASSETS CAUSED BY HIS WORKS AND THE
CONDUIT / CABLE HANSEN PLACE
CROSS-SECTION Road Name(s) RE-ESTABLISHMENT OF ANY SURVEY MARKS DISLODGED.
X THE CONTRACTOR SHALL REQUEST ON-SITE IDENTIFICATION AND
Nominated Category PR6 LOCATION OF EXISTING BURIED SERVICES FROM THE QUEENSLAND DIAL
WATER METER With the following exceptions:
UWLR exceeds 1% for modular LEDs (2.8%)
Road Surface Reflection N/A PILLARS / PITS ON ZERO LOT BOUNDARIES BEFORE YOU DIG SERVICE - PHONE: 1100 WEB: www.1100.com.au (A MINIMUM
Road Reserve Width 15m OF TWO DAYS NOTICE IS REQUIRED)
PROPOSED 1.0m
DRIVEWAY ENTRY Mounting Height 5.1m SEWERAGE, STORMWATER, GAS AND WATER PLANS FOR THE SITE MAY BE
Maintenance Factor: Overhang/Offset Distance 3.90m OBTAINED ON REQUEST FROM THE PROJECT SERVICE SUPERVISOR.
PROPOSED ZERO This lighting design uses the following maintenance factor(s): Lighting Arrangement Single Sided
LOT IDENTIFIER
Maintenance Factor Calculated : 0.75 Pole Setback 0.7m NFK REINSTATEMENT NOTES
driveway
Back of K
erb
Future
Upcast Angle 0° 0.6m 1m Pillar 1.0m
LIGHTING These maintenance factor(s) are based on the following nominal maintenance clear of driveway · BACKFILL & REINSTATEMENT OF FOOTPATH AND ROADWAY TO COUNCIL
Luminaire Details
PIT-ID
LEGEND 5 REQUIREMENTS. REFER STANDARD DRAWINGS:
regime: Lamp Type / Wattage L17
Electricity
supply co
rridor ·· RS-065 - PATHWAYS CONCRETE PATHWAY CONSTRUCTION
NOTE: NOT ALL RP BOU
· Lamp replacement (for non-LED luminaires) at 36 month intervals. Exclusion NDARY DETAILS
DARY
SYMBOLS MAY BE Luminaire Identification Modular LED 15W 4K 170326PHM Zone
USED 0.75 / 0.9
0m ·· 8 - 00398 - PATHWAY DETAILS AND SECTIONS
· Cleaning, inspection and maintenance of all luminaires at 36 month intervals
T BOUN
Lamp Flux (lumens) 1899 lms Side of the ·· 8 - 00399 - CONCRETE FOOTPATH FULL WIDTH
pillar aligned
· Service availability maintained at not less than 95%. I-table Identifier 170326PHM.CIE
ZERO LO
with the
Lighting Tariff RATE 2 boundary
LED STREET · Vegetation kept clear of luminaires.
LIGHT
If the asset owner elects not to adopt this maintenance regime, they shall develop
Power Factor
Start/run Currents
HPF (≥ 0.9)
0.08 / 0.08A
House on the
boundary DEVELOPERS NOTES
1. DO NOT CONSTRUCT DRIVEWAYS /
S100 HPS STREET an inspection and maintenance regime such that the overall lighting installation Ip Rating IP66
CROSSOVERS UNTIL ELECTRICAL
LIGHT
operates in accordance with this design. Spacing Calculations WORKS HAVE BEEN COMPLETED.
Proposed House
Average Horizontal Illuminance (E h) ≥ 0.7 lx
S150 HPS STREET Min Point Horizontal Illuminance (E Ph ) ≥ 0.07 lx
LIGHT Illuminance Uniformity (U E2) ≤ 10 N.T.S
Upward Wasted Light Ratio (UWLR) % 2.8% REQUIREMENTS FOR ELECTRICAL, GAS &
S250 HPS STREET
Road Reserve Lighting Design Width (m) Maximum Spacing (m) COMMUNICATIONS COUNCIL REQUIRE 1.0m CLEARANCE BETWEEN
ELECTRICAL PILLARS AND WATER METERS. INSTALL
LIGHT 15 73.0
Fire Ant The proposed pillar shall be offset at the zero lot WATER METERS MINIMUM 1.5m FROM BOUNDARY PEG
Biosecurity
boundary with the side of the pillar being aligned
WHERE WATER METERS SHARE A COMMON BOUNDARY
Caution
EXISTING UNKNOWN with the lot boundary in order to provide a 1.0m
STREET LIGHT minimum clearance from the future driveway. WITH ELECTRICAL PILLARS.
A proposed streetlight shall be offset 1.0m from
FILE: P:\221308\01 WORKING\A221308A
the boundary peg to centre of pole.
Zone COMMUNICATIONS PITS GAS SERVICE TEE-OFFS
FOR APPROVALS
are to remain outside 600mm are to remain outside 600mm (NOT FOR CONSTRUCTION)
TO BE BUILT IN CONJUNCTION WITH For Info pillar exclusion zone
shall not clash with future
pillar exclusion zone where a
pillar is offset to align on one
TELECOMMUNICATIONS CABLE PROVISIONING Call 13 25 23 driveways side with the boundary peg 26/05/2022 1:50 PM
S2602185
This document is CLIENT SITE CONTACT DETAILS ALIGNMENTS PROJECT / CERTIFICATION: PROJECT
the property of NAME ENERGEX OH 3.0 RP SUB PROJECT NO. APPROVED: 10 LOT RESIDENTIAL SUBDIVISION
RPEQ No:
Ampflo Pty Ltd NOEL SHIPP ENERGEX UG 0-0.90 PARENT PROJECT NO. - DATE: 25 PAVILION STREET, POMONA
and may only be COMPANY TELSTRA 2.1-3.0 WORK REQUEST NO. - LOCALITY PLAN, NOTES, LEGEND &
PLOT: 26/05/2022 1:50:08 PM
used for the ABN 28 111 423 842
purpose for JNE DEVELOPMENTS JNE DEVELOPMENTS PTY. LTD. GAS N/A PLANNER & PHONE SUBDIVISIONS
Electrical and Telecommunications
STREETLIGHTING COMPLIANCE
which it was PHONE HP GAS N/A LOTS 1 - 10 + 600 Consultants CHECKED:
commissioned. MOBILE 0421572866 WATER 0.9-2.1 CANCELLING LOTS 21 ON SP316902 ISO 9 0 0 1
Phone : (07) 3372 9280 ISSUE
CERTIFIED DESIGNER: S.LYNSKEY DRAWING: 221308
A
Unauthorised A 10/05/2022 PRELIMINARY ISSUE SL EMAIL [email protected] STORMWATER N/A LOCAL AUTHORITY NOOSA SHIRE COUNCIL Email : [email protected]
Q U A L I T Y
use is prohibited. REV DATE DETAILS DRAWN CHECKED APPRVD SEWERAGE 0.9-2.1 PEGGED? ON REQUEST MANAGEMENT
Website : ampflo.com.au ISSUE DATE: 10/05/2022 PROJECT: A221308 SHEET 1 OF 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 4 sections
Section 2
LEGEND 1C P7873
1 - 95 ABC 4C(LV)
3 - 7/4.75(11kV)
EXISTING
42
OVERHEAD CABLE
S
PROPOSED TREE STREET
OVERHEAD CABLE
1
M5
0
EXISTING P7872 4 - 7/3.75(LV)
UNDERGROUND 63
S
CABLE
#33 #29
RM
4RP809059 6RP809059
W
PROPOSED
D 240LV
UNDERGROUND
CABLE
S S S S
P192704 DANGER #36
6B LIVE 7RP35073
LV & HV
E
@ P7872
PROPOSED
RM
W
ELECTRICAL
S
SERVICE CONDUIT
#27
9
240
ET 1RP189023 1A
LV
D
PROPOSED 8
ELECTRICAL & 7
6
W
COMMUNICATION
RM
S
6L
1 - 95 ABC 4C (LV)
VEGETATION COVENANT
D
SERVICE CONDUITS 1B
3 - 7/4.75 (11kV)
600 1.0m ROAD CROSSING A
L17L2 P305784
NOTE!
REDUCED COVER REQUIRED
X
6A FROM STN 5 - 6 W W W W W W W W
3B
49
CANCELLING #34
POLE LOT 21 ON
S REFER TO ENERGEX UDC C2 3.2
X X W
240LV D TUNNEL BORE REQUIRED
8RP35073
2.0m ROAD CROSSING W ON - SITE LOCATION REQUIRED
TRANSFORMER SP316902 3L
4SL P D 16LV HANSEN PLACE
S
13.0m S/L BEFORE ANY EXCAVATION.
RM
4A A W 2L L17L2
L17L2
S
X B
W
PADMOUNT 6 A W W W
D
E
P7871
SC
W
TRANSFORMER
P
A 3A 2A
16LV
S
D 240LV
X 4L
S
S
3 L
W
D S
5L L17L2 L17L2 4S
240LV
240LV
16LV
X X
V
S
0L
D
RM 4C (LV)
HV POLE 5A
3 - 7/4.75 (11kV)
24
S S S S S S 2
P7872 - PAVILION STREET
D
D
P
A W W
W
W W W
#32
B X X C C X X C
240LV
1 - 95 ABC
LABEL SITE LOCATION FOR C
26
LABEL INFORMATION 5 4B 1RP41493
S
SIZE ATTACHING OF LABEL 4
S
16LV
240LV
HV / LV POLE
300X100 POLE No. P7872 TO HANSEN PLACE
240LV
4SL
VEG
LOCATION U2533471, U12533471 & SERVICES.
W
PAVILION STREET
ETA
10.4m S/L
PAVILION STREET
LV POLE
S
T
#23 P7870
ION
S
20SP316902
Section 3
1
C
OVE
HV UNDERGROUND 2
10 5 4 3
NAN
POLE TERMINATION
S
RM
T
#30
S
W
LV UNDERGROUND 2RP41493
POLE TERMINATION
1 - 95 ABCRM4C (LV)
3 - 7/4.75 (11kV)
S
W41
AERIAL STAY
S S
S
GROUND STAY
#19
4RP35077
SANDY STREET
C/DLL3
LL3
EARTH
C/D
1 - 95 ABC 4C(LV)
S
SP15411-
SP15411-
10 0 10 20 30 40 50 METRES M50 P7868 3 - 7/4.75(11kV)
13
EXISTING PILLAR ) 46
SP15411 SP15411 P7869 1 - 19/2.00(STAY
S
200kVA SCALE 1:500 (BEFORE REDUCTION) 200kVA
S
1 - 95 ABC 4C(LV)
3 - 7/4.75(11kV)
PROPOSED PILLAR
4C(LV)
4C(LV)
P7874 P7874
45
1 - 95 ABC
1 - 95 ABC
S
LINK PILLAR KYLIE CO #28
URT KYLIE CO
C/DLL2
S
240LV
SP15411-
URT 30RP35076
SP15411-
SP15411-
D C/DLL2 C/DLL2
120mm² X
LPE (LV)
U5736 120mm² X U5736
CONDUIT / CABLE X24301 LPE (LV)
X24301 RECOVER DS2 SWITCH
PAVILION ST
7
CROSS-SECTION 7
(OPEN)
X
4C(LV)
4C(LV)
C/DLL2
WATER METER
SP1420034/TR1 P7873 1C SP1420034/TR1
1C
1 - 95 ABC
1 - 95 ABC
SP15411-
PROPOSED P7892 P7892
DRIVEWAY ENTRY 1 1
P7872
P7872 (OPEN)
4 - 7/3.75
4 - 7/3.75
PROPOSED ZERO 4 - 7/3.75(L TREE STR TREE STR
LOT IDENTIFIER V) EET 4 - 7/3.75(L
V) EET
(LV)
SP282-D/D
(LV)
SP282-D/D
L1 1 - 95 ABC 4C(LV) 6 L1
U12533471 HANSEN 1 - 95 ABC 4C(LV)
LIGHTING PLACE
STREET
P76827 P76827
LEGEND P190822 U12533467 P190822
4C (LV)
4C (LV)
L1
U12533469
L1
NOTE: NOT ALL
SP282-D/D
SP282-D/D
1 - 95 ABC
SUMMI
1 - 95 ABC
SUMMI
SYMBOLS MAY BE
4 U12533464
PAVILION
USED 5
2
SP282-D
SP282-D
4 - 7/3.7
4 - 7/3.7
STREET
T ROAD
T ROAD
/D
/DL1
5(LV)
LED STREET
5(LV)
L1
LIGHT SWITCHING & COMMISSIONING PLAN - LV
SP282 SP282
200kVA 200kVA (subject to site conditions, amendments by switching co-ordinator and approval by
P7868 SANDY S P7868 SANDY S
PAVILION
S100 HPS STREET
4 - 7/4.75
(LV)
P7881 TREET 4 - 7/4.75
(LV)
P7881 T REET LV outage co-ordinator)
LIGHT 1 - 95 ABC
4C(LV) 1 - 95 ABC 4C
(LV)
SWITCHING
4C(LV)
4C(LV)
4 - 7/4.75 4 - 7/4.75 1. INSTALL NEW LV NETWORK AS PER PLAN
L1
(LV)
L1
(LV)
SP282-D/D
SP282-D/D
SP282-D/D
L1 SP282-D/D
1 - 95 ABC
L1
1 - 95 ABC
2. BREAK BRIDGES AT X24301 STN 7 - PAVILION STREET
AD
S150 HPS STREET
P7886 P7886 AD
REET
REET
LIGHT
) R O R O 3. RECOVER EXISTING DS2 SWITCH AT X24301 STN 7 - PAVILION STREE
IT
)
LV T
MI
C( LV
C(
4
M 4 4. INSTALL NEW OPEN DS2 SWITCH AT P7872 STN 1 - PAVILION STREET
CANE ST
CANE ST
C
UM
BC
M
C 4C(LV)
AB
C 4C(LV)
5A
SU
S250 HPS STREET 95
LIGHT
1- Section 4
S 1 -9
5. RE-MAKE BRIDGES AT X24301 ST 7 - PAVILION STREET
P7899
1 - 95 AB
1 - 95 AB
P7899
6. TEST AND COMMISSION
-A/DLL1
1
3-A/DLL
1 L1
LL
EXISTING UNKNOWN /D DL 7. PERFORM POST COMMISSIONING CHECKS
3 -A P7913 - A/ P7913
STREET LIGHT 89 93
3
8
SP6689
66
SP6689
66
SP SP
P801247 P801247
/DLL1
/DLL1
FILE: P:\221308\01 WORKING\A221308A
SP66893-A
A
FOR APPROVALS
SP66893-
EXISTING LV SCHEMATIC SCHEMATIC PROPOSED LV SCHEMATIC SCHEMATIC (NOT FOR CONSTRUCTION)
SCALE @ 1 : 2000 SCALE @ 1 : 2000
ALL EXISTING OVERHEAD CABLES AS SHOWN ALL NEW LV CABLES TO BE 4c 240mm Al XLPE UNO
26/05/2022 1:50 PM
S2602185
This document is CLIENT SITE CONTACT DETAILS ALIGNMENTS PROJECT / CERTIFICATION: PROJECT
the property of NAME ENERGEX OH 3.0 RP SUB PROJECT NO. APPROVED: 10 LOT RESIDENTIAL SUBDIVISION
RPEQ No:
Ampflo Pty Ltd NOEL SHIPP ENERGEX UG 0-0.90 PARENT PROJECT NO. - DATE: 25 PAVILION STREET, POMONA
and may only be COMPANY TELSTRA 2.1-3.0 WORK REQUEST NO. - ELECTRICAL RETICULATION, LV SCHEMATIC
PLOT: 26/05/2022 1:50:09 PM
used for the ABN 28 111 423 842
purpose for JNE DEVELOPMENTS JNE DEVELOPMENTS PTY. LTD. GAS N/A PLANNER & PHONE SUBDIVISIONS
Electrical and Telecommunications
LABELS & COMMISSIONING PLAN
which it was PHONE HP GAS N/A LOTS 1 - 10 + 600 Consultants CHECKED:
commissioned. MOBILE 0421572866 WATER 0.9-2.1 CANCELLING LOTS 21 ON SP316902 ISO 9 0 0 1
Phone : (07) 3372 9280 ISSUE
CERTIFIED DESIGNER: S.LYNSKEY DRAWING: 221308
A
Unauthorised A 10/05/2022 PRELIMINARY ISSUE SL EMAIL [email protected] STORMWATER N/A LOCAL AUTHORITY NOOSA SHIRE COUNCIL Email : [email protected]
Q U A L I T Y
use is prohibited. REV DATE DETAILS DRAWN CHECKED APPRVD SEWERAGE 0.9-2.1 PEGGED? ON REQUEST MANAGEMENT
Website : ampflo.com.au ISSUE DATE: 10/05/2022 PROJECT: A221308 SHEET 2 OF 3
Section 5
CABLE SCHEDULE
11kV 415V 415V 240V 240V
LOCATION STATIONS EX REC IN 240mm Al TRIPLEX 240mm Al XLPE 4c 16mm Cu 2c 16mm Cu 2c 4mm Cu REMARKS
FROM - TO SCS820363 SCS820364 SCS820365 LVC216PVPV LVC24PVPV
PAVILION STREET 1-2 * 81 INCLUDES LENGTH UP POLE
HANSEN PLACE 2 - 2L * 18
3 - 3B * 41
3 - 3L * 7
3-4 * 53
4 - 4A * 18
4A - 6 * 50
4-5 * 59
4 - 4L * 7
5 - 5A * 41
5 - 5L * 9
5 - 6L * 22
6 - 6L * 19
TOTAL 278m 82m 82m
CIVIL WORKS SCHEDULE - BY ELECTRICAL CONTRACTOR MATERIALS SUMMARY - S2602185
CONDUIT LENGTH (m) X-SECTION (m)
STATIONS DRAW KERB
UNDERGROUND
LOCATION 50HD 100 125 P100 REMARKS
FROM - TO COMMS EXCAV TRENCH WIRE MARKERS (Supplied by URD Contractor) (Supplied by URD Contractor)
No. m No. m No. m m /TAPE DETAIL MODEL No. QTY MODEL No. QTY
PAVILION STREET 1 - 1A 1 31 31 D 33 RE-INSTATE SURFACE LV4CMEN 2 LVSP2-6SL 2
2 - 2A 1 14 1 14 14 P 32 LVSP12-6 1 LVSP4-6SL 4
HANSEN PLACE 2A - 3A 1 40 40 D 42 LVSP12-6SL 1 LVSP4-6 1
2A - 2L 1 7 7 O 9 LVSP9-6SL 1
3 - 3A 2 25 25 E 27 TOTAL LVA4240XPV 278
3 - 3L 1 7 7 O 9 TRENCH LENGTH 344 LVC416XPV 74
3-4 1 51 51 D 53
4A - 4C 1 24 24 D 26 STREET LIGHTING
4 - 4B 1 13 1 13 13 P 30
(Supplied by URD Contractor) (Supplied by URD Contractor)
4B - 4L 1 8 8 O 10
MODEL No. QTY MODEL No. QTY
4B - 5 1 45 45 D 47
SLEDGL01711 5 LVC24PVPV 82
5 - 5A 1 39 39 D 41
SLNOS1CI 5
5 - 5L 1 3 3 O 5
SUGSLPIL 5
6 - 6A 1 17 1 17 17 P 38
6 - 6L 1 7 7 O 9
6A - 6B 1 29 29 D 31 CAPPED CONDUITS FOR FUTURE OVERHEAD
CONNECTION (Supplied by URD Contractor) (Supplied by URD Contractor)
TOTAL 76m 326m 344m 440m MODEL No. QTY MODEL No. QTY
CGEC 1 LVT4C240 1
LVABC/DS2 1 MENEX 1
CIVIL WORKS SCHEDULE - BY CIVIL CONTRACTOR LVACB/S 1 SC0010604 1
CONDUIT LENGTH (m) X-SECTION (m) LVBR240/ABC 1 LVABC/DS2 -1
STATIONS P100 DRAW KERB
LOCATION 50HD 100 125 EXCAV TRENCH REMARKS
FROM - TO COMMS WIRE MARKERS
No. m No. m No. m m /TAPE DETAIL THIS SUMMARY SHEET MUST NOT BE USED FOR TENDER PURPOSES.
PAVILION STREET 1A - 1B 1 25 25 D 27 2 TUNNEL BORE EXISTING ROAD THE CONTRACTOR SHALL CHECK ALL QUANTITIES AGAINST THE PLANS AND SCHEDULES.
1B - 2 1 25 25 D 27 2
HANSEN PLACE 3A - 3B 1 13 13 D 13 2
4 - 4A 1 18 18 D 20 2
4C - 6 1 24 24 D 26 2
TOTAL 114m 114m 113m 12
EQUIPMENT SCHEDULE
LOCATION STN No. SITE ID EXIST REC INST SIZE AND DESCRIPTION IIN COMP ID PLANT ID MODEL ID QTY LCC REMARKS
PAVILION STREET 2 U12533464 * SERVICE PILLAR 2 WAY + SL PI1 LVSP4-6SL 1 2x240LV 1x4SL
* PILLAR MEN EARTHING LV4CMEN 1
HANSEN PLACE 3 U12533465 * SERVICE PILLAR 2 WAY + SL PI1 LVSP4-6SL 1 2x240LV 1x4SL
3B U12533466 * SERVICE PILLAR X ROAD PI1 LVSP12-6 1 1x16LV 1x4SL
4 U12533467 * SERVICE PILLAR 2 WAY + SL PI1 LVSP4-6SL 1 2x240LV 1x16LV 1x4SL
4A U12533468 * SERVICE PILLAR X ROAD PI2 LVSP12-6 1 1x16LV
5 U12533469 * SERVICE PILLAR 1 WAY + SL PI1 LVSP2-6SL 1 1x240LV 1x16LV 1x4SL
5A U12533470 * SERVICE PILLAR X ROAD PI2 LVSP12-6 1 1x16LV
6 U12533471 * SERVICE PILLAR 1 WAY + SL PI1 LVSP2-6SL 1 1x240LV 1x4SL
* PILLAR MEN EARTHING LV4CMEN 1
OVERHEAD WORKS SCHEDULE
POLES CONSTRUCTION
LOCATION STN SITE ID REMARKS
No. (POLE No.) EDT EDT SST LST EXISTING RECOVER ERECT SINK FOOT COMP ID ALIGN LCC EXISTING RECOVER ERECT No. KBS ANG LCC
ANG kN kN kN
PAVILION STREET 1 P7872 EX EX EX EX P11/5-9 EX EX P01 EX 11PETD
LVT
LVABC/SU4 LVABC/SU4 LVABC/S 1 300 0°
LVABC/DS2 1 300 INSTALL NORMALLY OPEN TOWARDS
POLE P7873
SC0010604 1
LVBR240/ABC 1 150 0°
LVT4C240 1 500
M50
CGEC 1
MENEX 1
7 X24301 EX EX EX EX P12.5/8-14 EX EX P01 EX 11LBSPT
11S
LVABC/S
LVABC/DS2 LVABC/DS2 RECOVER EXISTING LVABC DS2
(INSTALLING AT POLE P7872)
HVEC
MEN
NPL2 - STREETLIGHT SCHEDULE
POLE OR COMPONENTS LANTERN OUTREACH BRACKET
LOCATION STN MOUNT REMARKS
No. SITE ID COMP EX REC ER CU ALIGN COMP EX RECOVER DATE ERECT DATE CU EX REC ER CU HT (m)
(POLE No.) ID (m) (m) (m) ID (m) ID LUMIN CUST DE-ENERG LUMIN CUST ENERG ID (m) (m) (m) ID
HANSEN PLACE 2L P12533472 P01 4.5m BPM SLNOS1CI 0.7 NFK SL1 L17L2 NOOS SLEDGL01711 5.1
3L P12533473 P01 4.5m BPM SLNOS1CI 0.7 NFK SL1 L17L2 NOOS SLEDGL01711 5.1
4L P12533474 P01 4.5m BPM SLNOS1CI 0.7 NFK SL1 L17L2 NOOS SLEDGL01711 5.1
5L P12533475 P01 4.5m BPM SLNOS1CI 0.7 NFK SL1 L17L2 NOOS SLEDGL01711 5.1
6L P12533476 P01 4.5m BPM SLNOS1CI 0.7 NFK SL1 L17L2 NOOS SLEDGL01711 5.1
*NOTES: (NFK = NOMINAL FACE OF KERB)
FILE: P:\221308\01 WORKING\A221308A
FOR APPROVALS
(NOT FOR CONSTRUCTION)
26/05/2022 1:50 PM
S2602185
This document is CLIENT SITE CONTACT DETAILS ALIGNMENTS PROJECT / CERTIFICATION: PROJECT
the property of NAME ENERGEX OH 3.0 RP SUB PROJECT NO. APPROVED: 10 LOT RESIDENTIAL SUBDIVISION
RPEQ No:
Ampflo Pty Ltd NOEL SHIPP ENERGEX UG 0-0.90 PARENT PROJECT NO. - DATE: 25 PAVILION STREET, POMONA
and may only be COMPANY TELSTRA 2.1-3.0 WORK REQUEST NO. - SCHEDULES
PLOT: 26/05/2022 1:50:10 PM
used for the ABN 28 111 423 842
purpose for JNE DEVELOPMENTS JNE DEVELOPMENTS PTY. LTD. GAS N/A PLANNER & PHONE SUBDIVISIONS
Electrical and Telecommunications
which it was PHONE HP GAS N/A LOTS 1 - 10 + 600 Consultants CHECKED:
commissioned. MOBILE 0421572866 WATER 0.9-2.1 CANCELLING LOTS 21 ON SP316902 ISO 9 0 0 1
Phone : (07) 3372 9280 ISSUE
CERTIFIED DESIGNER: S.LYNSKEY DRAWING: 221308
A
Unauthorised A 10/05/2022 PRELIMINARY ISSUE SL EMAIL [email protected] STORMWATER N/A LOCAL AUTHORITY NOOSA SHIRE COUNCIL Email : [email protected]
Q U A L I T Y
use is prohibited. REV DATE DETAILS DRAWN CHECKED APPRVD SEWERAGE 0.9-2.1 PEGGED? ON REQUEST MANAGEMENT
Website : ampflo.com.au ISSUE DATE: 10/05/2022 PROJECT: A221308 SHEET 3 OF 3