Decision Notice - Change to an Existing Approval - 010.2006.00000159.002 [As Published] · 142006.159.02

of 10

Text shows just the words. Original shows the document exactly as it was published.

                                             Officer:            Jack Lewis
                                             Direct Telephone:   (07) 5449 5294
                                             Response Address:   PO Box 141, Tewantin QLD 4565
                                             Email:              [email protected]
                                             Our Reference:      2006/159
                                             Your Reference:
24 December 2008

N C Oliver Properties Pty Ltd
CARE Middap & Ditchfield Pty Ltd
Cnr Mary & Thomas Streets
NOOSAVILLE QLD 4566



Dear Sir

                          Change to an Existing Approval
                                   Integrated Planning Act 1997

I refer to your request to make a change to an existing approval. On 23 December 2008 Council
decided your requested changes.
Details of the decision with the consolidated conditions are as follows:

1        APPLICATION DETAILS

    Application No:              2006/159
    Street address:              126 - 132 Gympie Terrace, Noosaville
    Real property description:   Lots 1, 2, 3 & 9 MCH 3881
    Planning Scheme:             The Noosa Plan

2        DECISION DETAILS
Council on 28 June 2007 decided to issue the following type of approval:-
       Development Permit for Operational Works - Landscaping, Frontage Works, Access,
        Carparking, Stormwater Disposal, Sediment & Erosion Controls & Filling of the Site
In relation to your request to extend the relevant period for the above development approval, Council
on 23 December 2008 decided to:
A.      Extend the relevant period until 28 June 2011
B.      Approve a change to Condition 12
C.      Issue a Change to an Existing Approval

3        RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4        ASSESSMENT MANAGER CONDITIONS




                                                                                          Page 1 of 10
Full text of the other 9 pages

Page 2

                                                                                         2006/159

Land Use
1.    The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines
      and the approved plan of Development. The approved plans and documentation are
      Landscape Plan PP01, Sheet 1 of 2 Issue E and Landscape General Notes & Details LD01,
      Sheet 2 of 2 Issue E dated 30 June 2006 prepared by Anembo Consultants.
2.    The operational works decision notice must be read in conjunction with the amendments
      detailed on the approved landscape plan
3.    All manholes, inspection pits and grates are to be raised to finish surface level and kept free of
      cover and be visible at all times to ensure prompt access in case of emergency.
4.    The landscape construction is to be implemented in accordance with horticultural industry best
      practices.
5.    All native plant species located in group plantings shall not be subjected to any hedging
      maintenance regimes.
6.    All trees 45 litre and greater must be securely tied and staked to assist their growth during the
      establishment period.
7.    The density of planting must achieve the set out requirements as detailed on the approved
      landscape plan.
8.    Prior to commencement of any clearing or demolition works on site, all trees detailed for
      retention shall be preserved and protected as per Tree Protection Typical Detail 02-LD01 on
      approved Landscape General Notes and Details Plan Drawing No. LD01, Sheet 2 of 2 Issue
      E. The tree protection methods shall remain in place until all building construction works on
      site have been completed
9.    The applicant must ensure that all landscaping treatment does not unduly restrict/prevent
      access to service meters within the site.
10.   All new tree plantings located in the road reserve and within the car park area must achieve a
      clean trunk of 1 metre for clear vehicle and pedestrian sight lines and safety.
11.   All trees must be located:-
      11.1 a minimum of 1.0 metres from all services to prevent root/service conflict and to provide
           future ease of maintenance requirements;
      11.2 a minimum of 2.0 metres from stormwater catchpits; and
      11.3 a minimum of 4.0 metres from all overhead street lighting.
12.   The development Permit lapses if the use has not happened by 28 June 2011, unless an
      application to extend the relevant period is approved by Council.
Land Development
13.   The development shall be carried out in accordance with Engineering/Consultant drawings
      Numbers:
            0619-04                 dated 23 January 2007 by Callaghan & Toth
            0619-05                 dated 23 January 2007 by Callaghan & Toth
            0619-06                 dated 23 January 2007 by Callaghan & Toth
            0619-07                 dated 23 January 2007 by Callaghan & Toth
            0619-08                 dated 23 January 2007 by Callaghan & Toth
            0411-DD01C              dated August 2005     by Middap & Ditchfield
            M1757-03C               dated 9 November 2006by Jones Flint & Pike
                                                                                      Page 2 of 10

Page 3

                                                                                       2006/159

            25908-C1C           dated 16 March 2006     by Riemac
            25908-C12B          dated 16 March 2006     by Riemac
            1451-0-1A           dated 27 April 2006     by Construction Hydraulics
            1451-0-2A           dated 27 April 2006     by Construction Hydraulics
            or as modified herein
14.   Roof and surface runoff connection to Council’s drainage system shall be as shown on
      drawing No. 1451-0-2A dated 27 April 2006 By Construction Hydraulics.
15.   A footpath 2.0 metres wide shall be constructed across the full Gympie Terrace frontage of the
      development and footpath 1.5 metres wide shall be constructed across the Mill Street frontage
      of the development. The footpaths shall have a slip resistant surface. The alignment, of which,
      shall be determined on site with Council’s Construction Technical Officer. The expansion joints
      in any bikeway/footpath shall be “sawcut” not trowel jointed.
16.   The total required pavement thickness shall be based on the Department of Transport’s
      Pavement Design Manual using soaked CBR tests of the subgrade.
      The design pavement thickness, together with CBR test results shall be submitted to Council’s
      Manager - Land Development for approval prior to placement of pavement material.
17.   Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
      installed into the first existing external downstream stormwater structure.
      These devices are to be checked and cleaned on a regular basis and specifically after each
      rain event.
      These devices are to remain in place during the civil works and construction phases of the
      development.
      The location and type of device to be installed shall be established at the “pre start” meeting
      with Council’s Construction Technical Officer and shall be installed prior to the
      commencement of any works.
18.   Council’s Construction Technical Officer, Tony Doughty (ph 0410 512 505), shall be given
      seven (7) days’ notice of intention to commence works to arrange a “pre start” meeting
      regarding the civil works.
19.   The principal contractor must have all the appropriate insurance and public liability
      documentation to carry out the works. The principal contractor is also responsible to ensure
      that any sub contractors also have the appropriate insurance and public liability
      documentation.
20.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy of
      Council’s signed approved drawings and conditions by the applicant.
21.   The Consulting Engineers for the project shall be currently Registered Professional Engineers
      of Queensland (RPEQ).          The consulting engineers are responsible for arranging all
      inspections, with Council’s Construction Technical Officer or nominated staff. Council’s
      Construction Technical Officer shall provide an inspection form for signing off by the Engineer
      at appropriate stages of construction, during on-site meetings. Construction Technical Officer
      will also sign the form at each stage when conditions required have been satisfied. The works
      will be accepted “On Maintenance” after this form, signed by the inspector for each stage is
      complete, together with a letter from the Engineer requesting that the works go “On
      Maintenance”.
22.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
      project. (This person will be the contact for the project).
23.   Council standards shall apply to these works unless otherwise modified herein.
                                                                                   Page 3 of 10

Page 4

                                                                                         2006/159

24.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply,
      sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
      damage or interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
      forthwith notify the Manager-Land Development and shall forthwith rectify the damage to that
      property or facility at its cost and to the satisfaction of the Manager-Land Development, prior to
      the commencement of the use or, alternatively, the Applicant may request the Council to carry
      out the rectification work at the Applicant’s cost, such cost being paid by the Applicant to the
      Council prior to the commencement of the use, provided that in the case of emergency the
      Council shall be entitled to rectify such damage at the cost of the Applicant, such cost being
      paid prior to the commencement of the use.
      A management strategy to ensure no damage occurs to Council services shall be given to
      Council for assessment prior to the pre start meeting.
25.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents and/or tenants in the vicinity of the development.
26.   Construction work and other associated activities are permitted only during the hours of 7.00
      am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
      except where extended hours are approved by the Manager-Land Development or his
      nominee.
27.   All signage, including that for safety during construction shall be in accordance with the
      Manual of Uniform Traffic Control Devices and Traffic Infrastructure (Roads) Act.
28.   Safe pedestrian access on Gympie Terrace, Mill Street and Chaplin Park shall be maintained
      at all times. Should footpath / road closures be necessary to carry out construction works,
      Council’s Construction Technical Officer (ph 0410 512 505) must be notified prior to the
      proposed closure.
29.   Sediment and erosion control measures must be in place prior to works commencing. If such
      measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such
      fines can be issued if sediments from the site are found to enter or have the potential to enter
      Council’s stormwater system or natural waterways. Although the sediment and erosion control
      measures have been approved on drawing No. 0619-04, Council’s Manager – Land
      Development may request further controls to be installed should approved measures be
      inefficient.
30.   The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant
      traps in accordance with the manufacturers specifications.
31.   The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant
      traps on a weekly basis and after each storm event.
      The owners of the subject property shall enter into an ongoing maintenance contract with a
      Registered Contractor to clean and maintain the grease/oil arrestor pits/gross pollutant traps
      on a regular three monthly cycle and on a “On Call” basis in the case of an emergency.
      The management and maintenance of the grease/oil arrestor pits/gross pollutant traps shall be
      included in the maintenance program for the completed development.
32.   Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement
      of satisfactory “As Constructed” records shall be submitted to Council.



                                                                                      Page 4 of 10

Page 5

                                                                                        2006/159

      As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
      (RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location,
      level and type of all services and structures. All of which shall be submitted to Council for
      checking and for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
      the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
      are available at www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering
      Design Standards – Roads, Drainage and Earthworks.
      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.
33.   A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
      be imposed on construction works during the maintenance period, which is a minimum period
      of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
      Developer for the works.
34.   The works to become Council assets will not be accepted "On Maintenance" until the
      landscaping is completed.
35.   These works are also to be in compliance with the relevant conditions of Development Permit
      No. 2004/4206.
36.   Notwithstanding that Council has checked the plans with due care, where it is found during
      construction that variations from Council's standards exist, then Council standards shall apply.
Water & Sewerage
      All works shall be carried out in accordance with the sewerage plans 0619-01B - Site Plan and
      Sediment Control Plan, 0619-02B - Sewer Layout Plan and 0619-03A - Sewer Longitudinal
      Plan and as may be amended by the conditions listed below.
37.   A copy of the job specification is to be provided to Council’s Inspector within seven (7) days of
      the date of this Decision Notice, and prior to commencement of works.
38.   The names of any proposed contractors for works are to be submitted in writing, together with
      copies of current Public Liability and Workers Compensation Insurances together with
      certificates of currency for those policies, for consideration by the Assessment Manager seven
      (7)     days     prior   to     pre-start    meetings     and     commencement      of    works.
      A separate letter will then be issued approving the contractor (or otherwise) for the works. No
      other contractor or subcontractor shall be engaged to carry out the works or any part of the
      works without the written approval of the Assessment Manager.
39.   Council’s Water & Sewerage Inspector shall be given (7) days notice of intention to commence
      works. A pre-start meeting shall be arranged prior to commencement of works by contacting
      Council’s Water & Sewerage Inspector, Mr Trevor Mourilyan, Ph. 0417 780 830. Inspector is
      only available for pre-start meetings, inspections and testing etc. between the hours of 6:30am
      to 4:00pm, Monday to Friday. Inspections will not be available outside these hours unless
      prior approval is obtained from the Water & Sewerage Capital Works Manager with any costs
      incurred by Council outside the hours nominated above, met by the Contractor/Developer.
      These costs will be in addition to normal inspection fees.
40.   Notwithstanding that Council has checked the plans with due care, where it is found during
      construction that variations exist with Council's standards, Council standards shall apply.
41.   It is the responsibility of the applicant to ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council property
      or facilities (such as underground drainage, water supply and sewerage) are protected against
      any damage or interference whatsoever.

                                                                                     Page 5 of 10

Page 6

                                                                                           2006/159

      If any Council property or facilities should be damaged by the applicant or any of its consultants or
      contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
      engineering works, the applicant and/or its contractors shall forthwith notify the Assessment
      Manager and shall forthwith rectify the damage to that property or facility at its cost to the
      satisfaction of the Assessment Manager prior to the sealing of the survey plan and/or acceptance
      of the works on-maintenance. Alternatively, the applicant may request the Council to carry out
      the rectification work at the applicant's cost, such cost being paid by the applicant to the Council
      prior to the sealing of the survey plan and/or acceptance of the works 'on maintenance' provided
      that in the case of emergency, the Council shall be entitled to rectify such damage at the cost of
      the applicant such cost being paid prior to the sealing of the survey plan and/or acceptance of the
      work 'on maintenance'.
42.   The Contractor shall make all necessary arrangements for supply of water required for
      construction works. The use of hydrant standpipes on Council mains will NOT be permitted.
      Contractors should contact Council’s Water Section on phone 5449 5254 to obtain an
      application form for issue of a key to access Council’s water tanker filling stations. Conditions
      of access and location of filling stations are detailed on the application form.
43.   All sewerage reticulation mains are to be inspected by closed circuit television (CCTV) prior to
      acceptance 'on maintenance'.
      CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council
      following satisfactory completion of construction works. The developer will be responsible for
      the full cost of CCTV inspection, including any additional inspection necessary following defect
      identification and rectification. This charge is payable prior to commencement of works and
      will be determined on the unit rate basis current at the time of approval.
44.   All signage, including that for safety during construction shall be in accordance with the
      Manual of Uniform Traffic Control Devices and Main Roads Department Roadworks Signing
      Guide.
45.   As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone
      56 coordinate value to the standards and requirements of the Assessment Manager are required
      for Council records. Such 'as constructed' drawings will be required prior to works being accepted
      "on maintenance", where applicable. Requirements for "as constructed" information are detailed
      in the current version of Council's Engineering Design Standards (Water & Sewerage) Manual.
      Release of plans of survey and/or acceptance of the works on-maintenance will not be
      considered until lodgement of satisfactory 'as constructed' records.
      Please note that bonding of outstanding works will not be considered by Council.
46.   Your company, is responsible for arranging all inspections and ensuring that all relevant
      details required by Council are supplied. The attached Water and Sewerage Inspection
      Report form is to be kept by you and presented to Council's Inspector at each stage of the
      development requiring a meeting or inspection. The Inspector will sign the form at each stage
      when conditions have been satisfied. The works will be accepted 'on maintenance' when this
      form, signed by the Inspector for each stage, is returned with a letter requesting that it go 'on
      maintenance'.
47.   It is Council policy that a maintenance bond be imposed on construction works during the
      maintenance period. The maintenance bond shall be 5% of the agreed value of the
      development obligations, or $1,500 whichever is the greater amount. This bond must be
      lodged by (and shall only be accepted from) the Developer for the works.
48.   Construction work and other associated activities are permitted only during the hours of
      7:00am and 6:00pm Monday to Saturday. No work is permitted on Sundays or public
      holidays, except where extended hours are approved by the Assessment Manager or his
      nominee.

                                                                                        Page 6 of 10

Page 7

                                                                                        2006/159

49.    Cut-ins to existing live sewer are to be performed by Approved Contractor. Noosa Council
       Works Inspector shall be present during any work on live sewer undertaken by contractor. An
       additional fee of $140.00 (included below) is required to cover costs associated with these live
       sewer works.
50.    Fees applicable to the above project are listed below:-
       Plan Examination                           $ 710.00
       Inspection Fee                             $ 710.00
       Checking as-constructed data               $ 442.50
       CCTV fee                                   $ 120.00
       Live sewer inspection                      $ 140.00
       BALANCE OWING                              $ 2,122.50       (PAID 10.10.2006 - RN.232722)
51.    Approval of these plans has been taken as a Notice of intention to commence works on the
       development.
52.    Dewatering - Council will allow discharge of the dewatering process to existing Council sewers
       which discharge to Pump Station NV2 in Mill Street providing rate of discharge does not
       impose any detrimental effects on the sewerage pump station. Council’s Sewerage Pump
       Station Foreman, Martin Pratt, Ph. 5440 9136 shall be contacted to arrange appropriate
       monitoring of process.

5      REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency        Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the Assessment
Manager conditions.

7      ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.     Proposed contractors for works should have current Public Liability and Workers
       Compensation Insurances.
2.     No other Contractor or Subcontractor should be engaged to carry out the works or any part of
       the works.
3.     Should any changes or modifications to the approved plans be required as a result of
       construction constraints, a Change to an Existing Approval Application under the Integrated
       Planning Act must be made. Amended plans clearly indicating the changes must be lodged
       with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).




                                                                                     Page 7 of 10

Page 8

                                                                                          2006/159

The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8      PROPERTY NOTES
Not applicable

9      PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable
10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required           Subject of the required Development Permit
 Nil

11     SELF ASSESSABLE CODES

Not applicable
12     SUBMISSIONS

Not applicable

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable

14     RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.

15     OTHER DETAILS

Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

DECISION NOTICE HISTORY
 Original Decision Notice issued 28 June 2007.
 Change to an Existing Approval issued 23
  December 2007 with amendment to Condition
  12.
Yours faithfully,




Tracy Jones
ACTING MANAGER – LAND USE
                                                                                      Page 8 of 10

Page 9

                                                                                                           2006/159


                                                        Appeal Rights
                                                        INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                         (6) If an application involves assessment against a
Planning Act (Chapter 4).                                           concurrence agency code, appeal rights for submitters
                                                                    for the application are not available against the part of
Division 8 - Appeals to                court   relating   to        the approval that represents the concurrence agency’s
development applications                                            response for the code.
Appeals by applicants                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application               4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following-               jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development           development approval for a development application if-
      application;                                                  (a) the development      application    involves   impact
(b) a matter stated in a development approval, including               assessment; and
      any condition applying to the development, and the            (b) the advice agency told the applicant and the
      identification of a code under section 3.1.6;1                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a                 application as a submission for an appeal.
      development permit was applied for;                              (2) The appeal must be started within 20 business
(d) the length of a relevant period;                                days after the day the decision notice or negotiated
                                                                    decision notice is given to the advice agency as a
(e) a deemed refusal.                                               submitter.
    (2) An appeal under subsection (1)(a) to (d) must be            Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal
                                                                    (co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant.                          4.1.30.(1) For a development approval given for a
                                                                    development application, a person to whom any of the
    (3) An appeal under subsection (1)(e) may be started
                                                                    following notices have been given may appeal to the
at any time after the last day a decision on the matter
                                                                    court against the decision in the notice-
should have been made.
                                                                    (a) a notice giving a decision on a request for extension
Appeals by submitters
                                                                       of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
                                                                    (b) a notice giving a decision on a request to make a
appeal to the court about-
                                                                       minor change to an approval.
(a) the giving of a development approval, including any
                                                                        (2) The appeal must be started within 20 business
      conditions (or lack of conditions) or other provisions
                                                                    days after the day the notice of the decision is given to
      of the approval; or
                                                                    the person.
(b) the length of a relevant period for the approval.
                                                                        (3) Subsection (1)(a) does not apply if the approval
    (2) The appeal must be started within 20 business               resulted from a development application (superseded
days (the “submitters appeal period”) after the day the             planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to           application under a superseded planning scheme.
the submitter.
                                                                       (4) Also, a person who has made a request
    (3) If a person withdraws a submission before the               mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the               against a deemed refusal of the request.
decision.
                                                                       (5) An appeal under subsection (4) may be started at
   (4) If an application involves both impact assessment            any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are               should have been made.
available only for the part of the application involving
impact assessment.                                                  Division 9 - Appeals to court about other matters
    (5) If an application is processed under section                Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application         (no co-respondents)
are available only for the aspects of the development that          4.1.31.(1) A person to whom any of the following notices
would have required public notification under the                   have been given may appeal to the court against the
repealed Act.                                                       decision in the notice-
                                                                    (a) a notice giving a decision on a request to change or
                                                                       cancel a condition of a development approval.
1
    Section 3.1.6 (Preliminary approval may override local
    planning instrument)
                                                                                                      Page 9 of 10

Page 10

                                                                                                  2006/159

(b) a notice under section 6.1.442 giving a decision to      (c) the decision to give a preliminary approval when a
    change or cancel a condition of a development                  development permit was applied for;
    approval.                                                (d) the length of a period mentioned in section 3.5.21
    (2) The appeal must be started within 20 business              relevant period;
       days after the day the notice of the decision is      (e) a deemed refusal.
       given to the person.
                                                                 (2) An appeal under subsection (1)(a) to (d) must be
    (3) Also, a person who has made a request                started within 20 business days (the “applicant’s appeal
       mentioned in subsection (1)(a) may appeal to the      period”) after the day the decision notice or negotiated
       court against a deemed refusal of the request.        decision notice is given to the applicant.
    (4) An appeal under subsection (3) may be started at         (3) An appeal under subsection (1)(e) may be started
       any time after the last day the decision on the       at any time after the last day a decision on the matter
       matter should have been made.                         should have been made.
Appeals against decisions to change approval conditions      The Registrar for the Building and Development
under the repealed Act                                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision     http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or        For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court      4.1.36 Appeals about particular infrastructure
against-                                                     charges
(a) the decision; or                                         (1) This section applies to a person who has been
(b) a deemed refusal of the application.                     given, and is dissatisfied with, an infrastructure charges
                                                             notice or a regulated State infrastructure charges notice.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of      (2) The person may appeal to the court against the
the decision is to be given to the person.                   notice.
    (3) An appeal under subsection (1)(b) may be started     (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter      after-
should have been made.                                       (a) if the notice is given because of a development
Appeals against local laws                                        approval or master plan approval-the day the
                                                                  applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
                                                                  approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the           (b)    otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the   (4)    An appeal under this section may only be about-
planning scheme may appeal to the court against the
                                                             (a) whether a charge in the notice is so unreasonable
decision or the conditions applied.                              that no reasonable relevant local government, State
    (2) The appeal must be started within 20 business            infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the        have imposed it; or
applicant.
                                                             (b) an error in the calculation of the charge.
For Building Works Only                                      (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the           under this section can not be about the methodology
Integrated Planning Act 1997 as follows:                     used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to                charges schedule or regulated State infrastructure
development applications                                     charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval, including
    any condition applying to the development, and the
    identification of a code under section 3.1.6;3


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
  Section 3.1.6 (Preliminary approval may override local
  planning instrument)
                                                                                             Page 10 of 10

Used in these records

About this file

File size
69 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2006.00000159.002 [As Published].pdf · 69 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.